Tocvan Provides Corporate Update. Drill Results at Pilar Pending.

CSE:TOC, TocVan Ventures, gold, mexico

Tocvan Ventures Corp. (the “Company”) (CSE:TOC) (CNSX:TOC.CN) (OTC:TCVNF) (FSE:TV3), is pleased to provide an update from its Pilar Au-Ag Project in Sonora, Mexico. Phase III drilling is currently in progress, 1,200 meters of core drilling has been completed providing essential information across the Main Zone and 4-T Trend. Over 40% of these samples have been submitted to ALS (Hermosillo) for preparation and analysis. The remaining samples are expected to be submitted over the next two weeks with more drilling planned in the coming months. The company expects first results to be available later this month, including results from the previously announced (see February 15, 2022, announcement) intersection of silicified breccia host through the Main Zone, a core twin of RC hole JES-20-32 which returned 94.6 meters of 1.6 g/t Au, including 9.2 meters of 10.8 g/t Au and 38 g/t Ag. Five (5) metallurgical samples for column leach study have been submitted for analysis by SGS and a strategic partner. Results for metallurgy are expected to be available in Q2 2022. 2021 bottle roll studies returned over 90% recovery of gold after a 48-hour retention time. read more

NexGen Announces Uplisting on the New York Stock Exchange

T.NXE, NexGen, uranium

NexGen Energy Ltd. (“NexGen” or the “Company”) (TSX: NXE) (NYSE: NXE) (ASX: NXG) is pleased to announce that it has been approved for uplisting on the New York Stock Exchange (“NYSE”) from its current listing on the NYSE American LLC (“NYSE American”).  The Company’s common stock will begin trading under the symbol “NXE” at the opening of trading on March 4, 2022. read more

Eloro Resources Intersects 171.57 g Ag eq/t (12.04 g Ag/t, 0.29% Zn, 0.22% Pb and 0.22% Sn) over 373.40m in Southern Part of Santa Barbara Target at Iska Iska Silver-Tin Polymetallic Project, Potosi Department, Bolivia

Includes higher-grade sections of 401.81 g Ag eq/t (31.46 g Ag/t, 0.19 %Pb and 0.61 %Sn) over 28.58m from 192.72m to 221.30m, 261.83 g Ag eq/t (4.91 g Ag/t and 0.43% Sn) over 95.16m in underground drill hole DSBU-03. Deeper in this hole, an additional major intersection of 197.61 g Ag /t (1.79 g Ag/t and 0.28% Sn) over 60.50m was encountered from 418.80m to 479.30m. In order to more aggressively drill this major new extension of the Santa Barbara deposit, a third surface diamond drill is being brought onto site bringing the total operating drills to four (3 surface and 1 underground).
ELO.V, Eloro, 321gold.com, Bob Moriarty, Bolivia, Iska Iska property,

 Eloro Resources Ltd. (TSX-V: ELO; OTCQX: ELRRF; FSE: P2QM) (“Eloro”, or the “Company”) is pleased to announce assay results from an additional diamond drill hole from its on-going drilling program at the Iska Iska silver-tin polymetallic project in the Potosi Department, southern Bolivia. Hole DSBU-03, an underground hole drilled due west from the Santa Barbara adit at -50 degrees, has discovered major new depth extensions of the already large Santa Barbara mineralized zones. read more

GR Silver Mining Provides Corporate Update

GR Silver Mining Ltd. (“GR Silver Mining” or the “Company”) (TSXV: GRSL) (OTCQB: GRSLF) (FRANKFURT: GPE) – is pleased to provide an update on the Company’s management team. Effective immediately, Company founder, Marcio Fonseca will become President and Chief Operating Officer and Eric Zaunscherb will assume the role of Chief Executive Officer in addition to his position as Chairman of the Board. read more

Grid Metals Provides Exploration and Corporate Update for Nickel and Lithium Properties

Grid Metals, GRDM.V

Grid Metals Corp. (the “Company“) (TSXV:GRDM)(OTCQB:MSMGF) today provided an update on its nickel-copper-PGM sulfide and lithium pegmatite exploration properties. The exploration properties are located in highly active mining and exploration districts in Manitoba and Ontario. The Company in January completed a financing transaction comprising a sale of 25% of its lithium properties, a royalty and a private placement with Lithium Royalty Corp. for net proceeds of C$ 6.3 million. read more

Eloro Resources Intersects 172.43 g Ag eq/t (40.16 g Ag/t, 0.51% Zn, 0.41% Pb and 0.13% Sn) over 303.05m in Southern Part of Santa Barbara Target at Iska Iska Silver-Tin Polymetallic Project, Potosi Department, Bolivia

Includes higher-grade sections of 507.64 g Ag eq/t (119.36 g Ag/t, 0.14 g Au/t, 0.57 %Pb and 0.52 %Sn) over 49.55m from 0.0 to 49.55m and 196.67 g Ag eq/t (66.93 g Ag/t, 1.03% Zn, 0.67% Pb and 0.08% Sn) over 77.77m in underground drill hole METSBUG-02. Hole DSB-20, which is in approximately the centre of the NW Extension target area, intersected 22 reportable intersections with a best result of 129.42 g Ag eq/t (21.79 g Ag/t, 0.27% Zn, 0.36% Pb and 0.12% Sn) over 73.65m including a higher-grade section of 204.03 g Ag eq/t (27.54 g Ag/t, 0.40% Zn, 0.55% Pb and 0.21% Sn) over 28.57m.
ELO.V, Eloro, 321gold.com, Bob Moriarty, Bolivia, Iska Iska property,

Eloro Resources Ltd. (TSX-V: ELO; OTCQX: ELRRF; FSE: P2QM) (“Eloro”, or the “Company”) is pleased to announce assay results from six (6) additional diamond drill holes from its on-going drilling program at the Iska Iska silver-tin polymetallic project in the Potosi Department, southern Bolivia. Hole METSBUG-02 is an underground hole drilled northeast from the Santa Barbara adit for metallurgical purposes and to complete fill-in drilling. The remaining five (5) holes tested the NW extension in the Santa Barbara Mineral Resource Target Area (DSB-12, -13, -15, -20 and -21) on a series of NE-SW sections as shown in Figure 1. read more

Tocvan Announces Private Placement

CSE:TOC, TocVan Ventures, gold, mexico

Tocvan Ventures Corp. (the “Company”) (CSE:TOC) (OTCQB:TCVNF) (WKN:TV3/A2PE64), is pleased to announce it will be proceeding with a non-brokered private placement of up to 666,667 units (the “Units”) at CAD $0.90 per Unit for gross proceeds of up to CAD $600,000 (the “Offering”).  Each Unit is comprised of one common share of the Company (a “Share”) and one common share purchase warrant (a “Warrant”). Each Warrant will entitle the holder to acquire one additional Share in the capital of the Company at a price of CAD $1.35 for a period of 18 months from the date the Units are issued, subject to the accelerated expiry provision described in the notes below. read more

GR Silver Mining Defines New High-Grade Gold Zones Parallel to the Plomosas Vein System, Including 0.4 m at 9.7 g/t Au and 2.0 m at 4.45 g/t Au

Figure 1: Geological Map of the Trampolín and Corta Pico Vein Systems (CNW Group/GR Silver Mining Ltd.)

GR Silver Mining Ltd. (“GR Silver Mining” or the “Company”) (TSXV: GRSL) (OTCQB: GRSLF) (FRANKFURT: GPE) – is pleased to report first exploration results for the Trampolín and Corta Pico vein systems, representing a set of N-S and NE-SW trending veins, located between the Plomosas and Loma Dorada vein systems. The Trampolín vein system can be considered the NE extension of the San Juan vein system, expanding the footprint of Au mineralization over 1,300 m to the NE (Figure 1). The results from Trampolín and Corta Pico confirm the presence of two Au-rich epithermal vein systems with the potential for higher-grade Au and Ag mineralization at depth. Mineralization at Trampolín and Corta Pico remains open along strike and down dip for future drilling. read more

Tocvan Provides Update for its Pilar Au-Ag Project. Identifies Mineralized Breccia Host. Mobilizes Second Drill Rig.

CSE:TOC, TocVan Ventures, gold, mexico

Tocvan Ventures Corp. (the “Company”) (CSE:TOC) (OTC:TCVNF) (FSE:TV3), is pleased to provide an update on operations at its Pilar Au-Ag Project in Sonora, Mexico.  A Phase III drill program is currently underway following up on Main Zone expansion targets and new target areas identified in 2021. A second drill rig has been mobilized to increase productivity, a diamond drill rig will accompany RC drilling and assist in understanding the key geological and structural controls of mineralization. read more