Eloro Resources Intersects Multiple Intersections including 122.25g Ag eq/t (17.77g Ag/t, 0.30% Zn, 0.33% Pb, 0.10% Cu and 0.16% Sn) over 210.74m in High Grade Feeder Zone, Santa Barbara Target Area at the Iska Iska Silver-Tin Polymetallic Project, Potosi Department, Bolivia

The headline intersection in hole METSBUG-03 drilled from the Santa Barbara adit, includes higher-grade portions of: 272.90g Ag eq/t (100.21g Ag/t, 0.37% Pb, 0.17% Cu and 0.34% Sn) over 16.57m. 199.68g Ag eq/t (51.11g Ag/t and 0.34% Sn) over 13.11m. 64% of this 707.8m long drill hole contains reportable intersections averaging 164.32 g Ag eq/t. Holes DSB-38, DSB-39 and DSB-40 tested the on-strike extension of the High Grade Feeder Zone at Santa Barbara to the south-southeast. These holes tested an approximately 1,000m (1km) long section in mineralized dacite across the central part of the caldera valley approximately 500m south-southeast of the underground drill bay in the Santa Barbara adit. Highlights include: 269.56g Ag eq/t (52.63g Ag/t, 3.02% Zn and 1.82% Pb) over 58.85m including 462.04g Ag eq/t (75.05g Ag/t, 5.87% Zn and 2.55% Pb over 23.80m (DSB-38). 101.74g Ag eq/t (10.59g Ag/t, 0.16 g Au/t, 1.23% Zn and 0.28% Pb) over 74.07m including 255.53g Ag eq/t (31.83g Ag/t, 0.59 g Au/t, 2.73% Zn and 0.64% Pb over 17.24m (DSB-38). 91.96g Ag eq/t (4.71g Ag/t, 1.37% Zn and 0.15% Pb) over 193.96m with higher-grade portions of 147.94g Ag eq/t (4.56g Ag/t, 2.48% Zn and 0.29% Pb) over 19.86m and 218.05g Ag eq/t (14.33g Ag/t, 0.14 g Au/t, 3.35% Zn and 0.33% Pb) over 11.21m (DSB-40). 34% of these three holes which total 2,761m contained reportable intersections which collectively averaged 106 g Ag eq/t. Hole DSB-41, collared on a section 300m northwest of the DSB-38 to -40 section, intersected altered and mineralized dacite including 145.52g Ag eq/t (15.52g Ag/t, 0.11gAu/t, 1.54% Zn, 0.36% Pb and 0.07% Sn) over 71.39m, including a higher-grade portion of 261.83g Ag eq/t (26.12g Ag/t, 0.09g Au/t, 2.78% Zn, 0.56% Pb and 0.17% Sn over 15.24m. Hole DSB-35 that tested the potential southwest extension of the Santa Barbara High Grade Feeder Zone approximately 300m west-northwest of the underground drill bay in the Santa Barbara adit intersected 89.43g Ag eq/t (5.63g Ag/t, and 0.20% Sn) over 104.86m with higher-grade portions of 203.86g Ag eq/t (5.42g Ag/t, 0.14 gAu/t, and 0.47% Sn) over 8.69m, 383.23 g Ag eq/t (5.66g Ag/t, 0.06 g Au/t, and 0.95% Sn) over 4.44m and 153.09g Ag eq/t (2.40g Ag/t and 0.37% Sn) over 7.66m. Sn grades are notably elevated in this area. On-Strike Extension of the High-Grade Feeder Zone at Santa Barbara to South-Southeast is now confirmed for an additional 500m along strike for a total strike length of 1,500m. Geophysical data indicates potential for a further 500m strike length to 2,000m. Width of the Santa Barbara mineralized zone is now up to 1,000m across strike with a depth of at least 800m. The mineralized zone remains open in ALL directions as well as at depth.
ELO.V, Eloro, 321gold.com, Bob Moriarty, Bolivia, Iska Iska property,
Geological Plan Map showing Drilling in Santa Barbara Area with Holes referred to in this release highlighted.

Eloro Resources Ltd. (TSX-V: ELO; OTCQX: ELRRF; FSE: P2QM) (“Eloro”, or the “Company”) is pleased to announce assay results from eight (8) additional diamond drill holes from its on-going drilling program at the Iska Iska silver-tin polymetallic project in the Potosi Department, southern Bolivia. Six of these holes (DSB-35 and DSB-37 to DSB-41) tested the south-southeastern extension of the high-grade feeder zone at Santa Barbara while METSBUG-03 is a metallurgical hole drilled from the Santa Barbara adit underground drill bay. Hole DM2-01 is a reconnaissance drill hole near the Mina 2 adit in the southeast part of the property. read more

Eloro Resources to Acquire Additional Properties to Significantly Expand Holdings at the Iska Iska Silver-Tin Polymetallic Project, Potosi Department, Bolivia

The Mina Casiterita and Mina Hoyada properties to be acquired cover 14.75 km2 southwest and west of Iska Iska. These properties connect with the TUP-3 and TUP-6 claims previously staked by Eloro. Eloro has also staked additional land in the area. Following the acquisition, the total land package in the Iska Iska area to be controlled by Eloro will total 1,935 quadrants covering 483.75 km2. Artisanal mining in the 1960’s identified high grade tin (Sn) veins on the Mina Casiterita property that are hosted in an intrusive dacite. Production from 1962 to 1964 is reported by the Departamento Nacional de Geología in Bolivia to be 69.85 tonnes grading 50.60% Sn. Recently completed magnetic surveys by Eloro has outlined an extensive, near surface, magnetic intrusive body on the Mina Casiterita property immediately southwest of Iska Iska. This intrusive hosts the previously mined high-grade tin veins and is very likely the continuation of the porphyry tin intrusion projected to be below the epithermal Ag-Sn-Zn-Pb mineralization at Iska Iska. The Porco adit from which previously reported channel sampling returned 103m grading 521 g Ag eq/t (including 117g Ag/t, 1.44 g Au/t, 0.54% Cu and 0.66% Sn) in altered basement sediments, is located near the northeast part of the magnetic anomaly, attesting to the potential strength and high-grade nature of the mineralized system in the area. Drilling is planned on Mina Casiterita in Q1 2023 with geological mapping, sampling and geophysical surveys now in progress on the full land package across the Iska Iska region.
ELO.V, Eloro, 321gold.com, Bob Moriarty, Bolivia, Iska Iska property,

Eloro Resources Ltd. (TSX-V: ELO; OTCQX: ELRRF; FSE: P2QM) (“Eloro”, or the “Company”) is pleased to announce it has entered into an option agreement (the “Agreement”) to acquire the Mina Casiterita and Mina Hoyada properties (the “Acquisition”) which collectively cover 14.75 km2 southwest and west of the Iska Iska Silver-Tin Polymetallic Project (“Iska Iska”). Artisanal mining in the 1960’s identified high grade tin veins on the Mina Casiterita property that are hosted in intrusive dacite. Production from 1962 to 1964 is reported by the Departamento Nacional de Geología (National Department of Geology) in Bolivia as 69.85 tonnes grading 50.60% Sn. These properties connect with the TUP-3 and TUP-6 claims previously staked by Eloro. The Company has also staked additional claims in the Iska Iska region, as shown in Figure 1. Collectively, the land package to be controlled by Eloro following the Acquisition will total 1,935 quadrants covering 483.75 km2. This includes the Tomave, Khuchu Ingenio and Puna properties, located further north towards Potosi (Figure 1). read more

Eloro Resources Amends Payment Schedule for Iska Iska Silver-Tin Polymetallic Project, Potosi Department, Bolivia

ELO.V, Eloro, 321gold.com, Bob Moriarty, Bolivia, Iska Iska property,

Eloro Resources Ltd. (TSX-V: ELO; OTCQX: ELRRF; FSE: P2QM) (“Eloro”, or the “Company”) is pleased to announce that, by mutual agreement with Empresa Minera Villegas S.R.L. (“Minera Villegas”), the title holder of the Iska Iska silver-tin polymetallic project in the Potosi Department, southern Bolivia (“Iska Iska”), the payment schedule in connection with the US$10 million payment required for Eloro to earn a 99% interest in Iska Iska has been amended. read more

Eloro Resources Provides Update on the Preliminary Metallurgical Testwork Program for the Iska Iska Silver-Tin Polymetallic Project, Potosi Department, Bolivia

ELO.V, Eloro, 321gold.com, Bob Moriarty, Bolivia, Iska Iska property,

Eloro Resources Ltd. (TSX-V: ELO; OTCQX: ELRRF; FSE: P2QM) (“Eloro”, or the “Company”) is pleased to provide an update on its preliminary metallurgical testwork program for the Iska Iska silver-tin polymetallic project in the Potosi Department, southern Bolivia. The work program including testwork for development of a preliminary metallurgical flowsheet and preliminary mineralogical characterization, is being carried out by Blue Coast Research Ltd. (“Blue Coast”) based in Parksville, BC. The objective is to develop the preliminary flotation flowsheet to maximize lead, zinc and precious metals into saleable concentrates in the Santa Barbara polymetallic deposit and to develop a preliminary flowsheet for tin in both the Santa Barbara and the deeper tin-dominant mineralization. read more

Eloro Resources Files Updated NI 43-101 Technical Report on Iska Iska Project

Eloro Resources Also Announces Filing of Final Base Shelf Prospectus
ELO.V, Eloro, 321gold.com, Bob Moriarty, Bolivia, Iska Iska property,

Eloro Resources Ltd. (the “Company” or “Eloro”) (TSX-V: ELO; OTCQX: ELRRF; FSE: P2QM) is pleased to announce that it has filed on SEDAR an updated technical report (“Technical Report”) on the Company’s Iska Iska silver-tin polymetallic project, prepared by Micon International Limited (“Micon”) and in accordance with National Instrument 43-101. read more

Eloro Resources Intersects 172.43 g Ag eq/t (40.16 g Ag/t, 0.51% Zn, 0.41% Pb and 0.13% Sn) over 303.05m in Southern Part of Santa Barbara Target at Iska Iska Silver-Tin Polymetallic Project, Potosi Department, Bolivia

Includes higher-grade sections of 507.64 g Ag eq/t (119.36 g Ag/t, 0.14 g Au/t, 0.57 %Pb and 0.52 %Sn) over 49.55m from 0.0 to 49.55m and 196.67 g Ag eq/t (66.93 g Ag/t, 1.03% Zn, 0.67% Pb and 0.08% Sn) over 77.77m in underground drill hole METSBUG-02. Hole DSB-20, which is in approximately the centre of the NW Extension target area, intersected 22 reportable intersections with a best result of 129.42 g Ag eq/t (21.79 g Ag/t, 0.27% Zn, 0.36% Pb and 0.12% Sn) over 73.65m including a higher-grade section of 204.03 g Ag eq/t (27.54 g Ag/t, 0.40% Zn, 0.55% Pb and 0.21% Sn) over 28.57m.
ELO.V, Eloro, 321gold.com, Bob Moriarty, Bolivia, Iska Iska property,

Eloro Resources Ltd. (TSX-V: ELO; OTCQX: ELRRF; FSE: P2QM) (“Eloro”, or the “Company”) is pleased to announce assay results from six (6) additional diamond drill holes from its on-going drilling program at the Iska Iska silver-tin polymetallic project in the Potosi Department, southern Bolivia. Hole METSBUG-02 is an underground hole drilled northeast from the Santa Barbara adit for metallurgical purposes and to complete fill-in drilling. The remaining five (5) holes tested the NW extension in the Santa Barbara Mineral Resource Target Area (DSB-12, -13, -15, -20 and -21) on a series of NE-SW sections as shown in Figure 1. read more

Eloro Resources Announces Restart of Diamond Drilling and Provides Update on Iska Iska Silver-Tin Polymetallic Project, Potosi Department, Bolivia

ELO.V, Eloro, 321gold.com, Bob Moriarty, Bolivia, Iska Iska property,

Eloro Resources Ltd. (TSX-V: ELO; OTCQX: ELRRF; FSE: P2QM) (“Eloro”, or the “Company”) is pleased to provide an update on its Iska Iska silver-tin polymetallic project in the Potosi Department, southern Bolivia. By the end of 2021, the Company completed 40,468 metres (m) in 73 drill holes at Iska Iska, as shown in Figure 1. Table 1 summarizes drill holes with assays pending. Currently there are two surface drill rigs and one underground drill rig on site. Drilling with all rigs recommenced on January 17, 2022. Highlights of work in progress are as follows: read more

Channel Sampling at Porco Adit returns 103m Strike Length Grading 521 Ag eq/t (including 117 g Ag/t, 1.44 g Au/t, 0.54% Cu and 0.66%Sn) at Iska Iska Silver-Tin Polymetallic Project, Potosi Department, Bolivia

Drill hole DPC-01 on the edge of a major magnetic susceptibility anomaly in the Porco Breccia Pipe area returned sixteen (16) separate zones of sulphide veins including 110.30 g Ag eq/t over 3.0m. Magnetic inversion model outlines extensive target zone in the Porco-Central Breccia Pipe areas.
ELO.V, Eloro, 321gold.com, Bob Moriarty, Bolivia, Iska Iska property,

Eloro Resources Ltd. (TSX-V: ELO; OTCQX: ELRRF; FSE: P2QM) (“Eloro”, or the “Company”) is pleased to provide an update on its Iska Iska silver-tin polymetallic project in the Potosi Department, southern Bolivia. To date, the Company has completed 35,738 metres (m) in 68 drill holes including three (3) in progress to test major target areas at Iska Iska. This press release reports drilling results from one (1) additional hole which tested the Porco Breccia Pipe (“PBP”) (Hole DPC-01) and new underground channel sampling from the Porco adit located approximately 200m south of the PBP. Currently three drill rigs are in operation at Iska Iska. Two surface drill rigs are continuing to drill at the Santa Barbara Resource Definition Target Zone (Figure 1) to outline an initial National Instrument 43-101 (“NI-43-101”) compliant resource. A third drill, an underground rig, situated in the west end of the Santa Barbara Adit, is testing the eastern part of Santa Barbara Breccia Pipe (“SBBP’) and its mineralized envelope. Figure 1 is a geological plan map showing locations of drill holes completed, in progress and planned to complete resource definition drilling along with an updated geological interpretation. Figure 2 is a plan map of channel sampling at the Porco adit. Table 1 provides significant drilling results with definitions of chemical symbols, Table 2 details channel sample results from the Porco adit and Table 3 lists holes completed with assays pending, as well as holes in progress in the three major target areas. Highlights include: read more

Magnetic Inversion Model Confirms Extensive Mineralized System at Iska Iska Extending over 2.4 Kilometre Strike Length

Mineral resource definition drilling continuing in the Santa Barbara target area which has been increased to more than 1,400m along strike, is 500m wide and extends to a depth of up to 600m.
ELO.V, Eloro, 321gold.com, Bob Moriarty, Bolivia, Iska Iska property,

Eloro Resources Ltd. (TSX-V: ELO; OTCQX: ELRRF; FSE: P2QM) (“Eloro”, or the “Company”) is pleased to provide an update on exploration activities at its Iska Iska silver-tin polymetallic project in the Potosi Department, southern Bolivia. To date, the Company has completed 32,606 metres (m) of drilling in 63 holes, including three (3) in progress, to test major targets at Iska Iska. Currently three drills are operating on the property: two surface drills and one underground drill. read more

Eloro Intersects 234.19g Ag eq/t over 53.20m in the Mineralized Envelope of the Santa Barbara Breccia Pipe at Iska Iska Silver-Tin Polymetallic Project, Potosi Department, Bolivia

Step out drilling northwest of Santa Barbara Breccia Pipe demonstrates room for expansion of the mineralized strike length of the breccia pipe and its surrounding mineralized envelope to over 1.2km Definition drilling in progress to define a maiden NI 43-101 compliant mineral resource within a target block measuring 1,200m along strike, 500m wide and extending to a depth of up to 600m in Santa Barbara Breccia Pipe and its surrounding mineralized envelope
ELO.V, Eloro, 321gold.com, Bob Moriarty, Bolivia, Iska Iska property,

Eloro Resources Ltd. (TSX-V: ELO; OTCQX: ELRRF FSE: P2QM) (“Eloro”, or the “Company”) is pleased to provide an update on its Iska Iska silver-tin polymetallic project in the Potosi Department, southern Bolivia. To date, the Company has completed 58 diamond drill holes totalling 26,982 metres (m) to test major target areas at Iska Iska. This press release reports drilling results from four (4) additional holes which tested the mineralized envelope of the Santa Barbara Breccia Pipe (“SBBP”) (Holes DDHK-19 and DHK-20) and the central-southern part of the Central Breccia Pipe (“CBP”) (Holes DCN-04 and DCS-02). To date, every drill hole that has been assayed has returned multiple reportable mineralized intercepts. Currently three drill rigs are in operation at Iska Iska. Two surface drill rigs are completing drilling at SBBP in order to outline an initial National Instrument 43-101 (“NI-43-101”) compliant resource. A third drill, an underground rig, situated in the west end of the Santa Barbara Adit, is testing the eastern part of SBBP and its mineralized envelope. Figure 1 is a geological plan map showing locations of drill holes and an updated geological interpretation. This map depicts a recently identified robust magnetic anomaly to the northwest of the SBBP where drilling is in progress (see press release June 7, 2021, for an overview of the magnetic results). Figure 2 is a north-south section showing the major potential extension of the SBBP mineralized system. Table 1 provides significant drilling results with definitions of chemical symbols and Table 2 lists holes completed with assays pending as well as holes in progress in the three major target areas. Highlights are as follows: read more