Eloro Resources Intersects 172.43 g Ag eq/t (40.16 g Ag/t, 0.51% Zn, 0.41% Pb and 0.13% Sn) over 303.05m in Southern Part of Santa Barbara Target at Iska Iska Silver-Tin Polymetallic Project, Potosi Department, Bolivia

Includes higher-grade sections of 507.64 g Ag eq/t (119.36 g Ag/t, 0.14 g Au/t, 0.57 %Pb and 0.52 %Sn) over 49.55m from 0.0 to 49.55m and 196.67 g Ag eq/t (66.93 g Ag/t, 1.03% Zn, 0.67% Pb and 0.08% Sn) over 77.77m in underground drill hole METSBUG-02. Hole DSB-20, which is in approximately the centre of the NW Extension target area, intersected 22 reportable intersections with a best result of 129.42 g Ag eq/t (21.79 g Ag/t, 0.27% Zn, 0.36% Pb and 0.12% Sn) over 73.65m including a higher-grade section of 204.03 g Ag eq/t (27.54 g Ag/t, 0.40% Zn, 0.55% Pb and 0.21% Sn) over 28.57m.
ELO.V, Eloro, 321gold.com, Bob Moriarty, Bolivia, Iska Iska property,

Eloro Resources Ltd. (TSX-V: ELO; OTCQX: ELRRF; FSE: P2QM) (“Eloro”, or the “Company”) is pleased to announce assay results from six (6) additional diamond drill holes from its on-going drilling program at the Iska Iska silver-tin polymetallic project in the Potosi Department, southern Bolivia. Hole METSBUG-02 is an underground hole drilled northeast from the Santa Barbara adit for metallurgical purposes and to complete fill-in drilling. The remaining five (5) holes tested the NW extension in the Santa Barbara Mineral Resource Target Area (DSB-12, -13, -15, -20 and -21) on a series of NE-SW sections as shown in Figure 1. read more

Eloro Resources Announces Restart of Diamond Drilling and Provides Update on Iska Iska Silver-Tin Polymetallic Project, Potosi Department, Bolivia

ELO.V, Eloro, 321gold.com, Bob Moriarty, Bolivia, Iska Iska property,

Eloro Resources Ltd. (TSX-V: ELO; OTCQX: ELRRF; FSE: P2QM) (“Eloro”, or the “Company”) is pleased to provide an update on its Iska Iska silver-tin polymetallic project in the Potosi Department, southern Bolivia. By the end of 2021, the Company completed 40,468 metres (m) in 73 drill holes at Iska Iska, as shown in Figure 1. Table 1 summarizes drill holes with assays pending. Currently there are two surface drill rigs and one underground drill rig on site. Drilling with all rigs recommenced on January 17, 2022. Highlights of work in progress are as follows: read more

Channel Sampling at Porco Adit returns 103m Strike Length Grading 521 Ag eq/t (including 117 g Ag/t, 1.44 g Au/t, 0.54% Cu and 0.66%Sn) at Iska Iska Silver-Tin Polymetallic Project, Potosi Department, Bolivia

Drill hole DPC-01 on the edge of a major magnetic susceptibility anomaly in the Porco Breccia Pipe area returned sixteen (16) separate zones of sulphide veins including 110.30 g Ag eq/t over 3.0m. Magnetic inversion model outlines extensive target zone in the Porco-Central Breccia Pipe areas.
ELO.V, Eloro, 321gold.com, Bob Moriarty, Bolivia, Iska Iska property,

Eloro Resources Ltd. (TSX-V: ELO; OTCQX: ELRRF; FSE: P2QM) (“Eloro”, or the “Company”) is pleased to provide an update on its Iska Iska silver-tin polymetallic project in the Potosi Department, southern Bolivia. To date, the Company has completed 35,738 metres (m) in 68 drill holes including three (3) in progress to test major target areas at Iska Iska. This press release reports drilling results from one (1) additional hole which tested the Porco Breccia Pipe (“PBP”) (Hole DPC-01) and new underground channel sampling from the Porco adit located approximately 200m south of the PBP. Currently three drill rigs are in operation at Iska Iska. Two surface drill rigs are continuing to drill at the Santa Barbara Resource Definition Target Zone (Figure 1) to outline an initial National Instrument 43-101 (“NI-43-101”) compliant resource. A third drill, an underground rig, situated in the west end of the Santa Barbara Adit, is testing the eastern part of Santa Barbara Breccia Pipe (“SBBP’) and its mineralized envelope. Figure 1 is a geological plan map showing locations of drill holes completed, in progress and planned to complete resource definition drilling along with an updated geological interpretation. Figure 2 is a plan map of channel sampling at the Porco adit. Table 1 provides significant drilling results with definitions of chemical symbols, Table 2 details channel sample results from the Porco adit and Table 3 lists holes completed with assays pending, as well as holes in progress in the three major target areas. Highlights include: read more

Magnetic Inversion Model Confirms Extensive Mineralized System at Iska Iska Extending over 2.4 Kilometre Strike Length

Mineral resource definition drilling continuing in the Santa Barbara target area which has been increased to more than 1,400m along strike, is 500m wide and extends to a depth of up to 600m.
ELO.V, Eloro, 321gold.com, Bob Moriarty, Bolivia, Iska Iska property,

Eloro Resources Ltd. (TSX-V: ELO; OTCQX: ELRRF; FSE: P2QM) (“Eloro”, or the “Company”) is pleased to provide an update on exploration activities at its Iska Iska silver-tin polymetallic project in the Potosi Department, southern Bolivia. To date, the Company has completed 32,606 metres (m) of drilling in 63 holes, including three (3) in progress, to test major targets at Iska Iska. Currently three drills are operating on the property: two surface drills and one underground drill. read more

Eloro Intersects 234.19g Ag eq/t over 53.20m in the Mineralized Envelope of the Santa Barbara Breccia Pipe at Iska Iska Silver-Tin Polymetallic Project, Potosi Department, Bolivia

Step out drilling northwest of Santa Barbara Breccia Pipe demonstrates room for expansion of the mineralized strike length of the breccia pipe and its surrounding mineralized envelope to over 1.2km Definition drilling in progress to define a maiden NI 43-101 compliant mineral resource within a target block measuring 1,200m along strike, 500m wide and extending to a depth of up to 600m in Santa Barbara Breccia Pipe and its surrounding mineralized envelope
ELO.V, Eloro, 321gold.com, Bob Moriarty, Bolivia, Iska Iska property,

Eloro Resources Ltd. (TSX-V: ELO; OTCQX: ELRRF FSE: P2QM) (“Eloro”, or the “Company”) is pleased to provide an update on its Iska Iska silver-tin polymetallic project in the Potosi Department, southern Bolivia. To date, the Company has completed 58 diamond drill holes totalling 26,982 metres (m) to test major target areas at Iska Iska. This press release reports drilling results from four (4) additional holes which tested the mineralized envelope of the Santa Barbara Breccia Pipe (“SBBP”) (Holes DDHK-19 and DHK-20) and the central-southern part of the Central Breccia Pipe (“CBP”) (Holes DCN-04 and DCS-02). To date, every drill hole that has been assayed has returned multiple reportable mineralized intercepts. Currently three drill rigs are in operation at Iska Iska. Two surface drill rigs are completing drilling at SBBP in order to outline an initial National Instrument 43-101 (“NI-43-101”) compliant resource. A third drill, an underground rig, situated in the west end of the Santa Barbara Adit, is testing the eastern part of SBBP and its mineralized envelope. Figure 1 is a geological plan map showing locations of drill holes and an updated geological interpretation. This map depicts a recently identified robust magnetic anomaly to the northwest of the SBBP where drilling is in progress (see press release June 7, 2021, for an overview of the magnetic results). Figure 2 is a north-south section showing the major potential extension of the SBBP mineralized system. Table 1 provides significant drilling results with definitions of chemical symbols and Table 2 lists holes completed with assays pending as well as holes in progress in the three major target areas. Highlights are as follows: read more

Eloro Intersects 129.65 g Ag eq/t over 300.75m in the Mineralized Envelope of the Santa Barbara Breccia Pipe at the Iska Iska Silver-Tin Polymetallic Project, Potosi Department, Bolivia

ELO.V, Eloro, 321gold.com, Bob Moriarty, Bolivia, Iska Iska property,
Table 1

Eloro Resources Ltd. (TSX-V: ELO; OTCQX: ELRRF FSE: P2QM) (“Eloro”, or the “Company”) is pleased to provide an update on its Iska Iska silver-tin polymetallic project in Potosi Department, southern Bolivia. To date, the Company has completed 46 diamond drill holes totalling 22,398.9 metres (m) to test major target areas at Iska Iska. This press release reports drilling results from four (4) additional holes which tested the mineralized envelope of the Santa Barbara Breccia Pipe (“SBBP”) and the central-southern part of the Central Breccia Pipe (“CBP”). To date, every drill hole that has been assayed has returned multiple reportable mineralized intercepts. Currently three drill rigs are in operation at Iska Iska. One surface drill rig is completing first pass drilling of the major Porco (South) Target. The second surface drill is currently cleaning out drill holes on the SBBP radial platform for the planned downhole induced polarization/resistivity (IP/RES) survey then will be moved to test the gap area between the Central and Porco Breccia Pipes. The third drill, an underground rig, is testing the northeast part of SBBP and its mineralized envelope. This drill will shortly be moved to a new drill bay recently completed on the west end of the Santa Barbara adit. Figure 1 is a geological plan map showing locations of drill holes and an updated geological interpretation. Figure 2 is a more detailed geological plan map of the SBBP and northern CBP areas showing the magnetic low target to the northwest of the SBBP where drilling is planned (see press release June 7, 2021 for an overview of the magnetic results). Table 1 provides significant drilling results and Table 2 lists holes completed with assays pending as well as holes in progress in the three major target areas. Highlights are as follows: read more

Multiple Holes Yield Silver-Tin Polymetallic Intercepts in the Santa Barbara and Central Breccia Pipes at Eloro Resources’ Iska Iska Project, Bolivia

Hole DSB-08 in the Santa Barbara Breccia Pipe returned 69.89 g Ag eq/t over 252.89m including 196.60 g Ag eq/t with 131.13 g Ag/t over 14.52m Hole DSB-10 returned 29 reportable mineralized intercepts over its entire 1 km length including 114.96 g Ag eq/t over 56.12m and 80.71 g Ag eq/t over 74.39m
ELO.V, Eloro, 321gold.com, Bob Moriarty, Bolivia, Iska Iska property,
Table 1

Eloro Resources Ltd. (TSX-V: ELO; OTCQX: ELRRF FSE: P2QM) (“Eloro”, or the “Company”) is pleased to provide an update on its Iska Iska silver-tin polymetallic project in Potosi Department, southern Bolivia. To date, the Company has completed 43 diamond drill holes totalling 20,030 metres (m) to test major target areas at Iska Iska. This press release reports drilling results from four (4) additional holes which tested the Santa Barbara Breccia Pipe (“SBBP”) and Central Breccia Pipe (“CBP”). To date, every drill hole that has been assayed has returned multiple reportable mineralized intercepts. Currently three drill rigs are in operation at Iska Iska. One surface drill rig is completing first pass drilling of the CBP from the northern radial platform and a second surface drill is testing the major Porco (South) Target. The third drill, an underground rig, is testing the northeast part of SBBP and its mineralized envelope. Figure 1 is a geological plan map showing locations of drill holes and an updated geological interpretation. Figure 2 is a more detailed geological plan map of the SBBP and CBP areas. Figure 3 is a NW-SE geological section along the northwestern part of the CBP and the eastern part of SBBP showing locations of the main mineralized zone and of drill holes DSB-08, DSB-10 and DCN-2 in this release. Figure 4 shows the currently interpreted metal zoning pattern on this same section. Table 1 provides significant drilling results and Table 2 lists holes completed with assays pending as well as holes in progress in the three major target areas. Highlights are as follows: read more

Ground Magnetic Survey Confirms and Expands Target Areas at Eloro Resources’ Iska Iska Silver-Tin Polymetallic Project, Bolivia

ELO.V, Eloro, 321gold.com, Bob Moriarty, Bolivia, Iska Iska property,
Figure 1

Eloro Resources Ltd. (TSX-V: ELO; OTCQX: ELRRF FSE: P2QM) (“Eloro”, or the “Company”) is pleased to report results from its recently completely magnetics survey on the Company’s Iska Iska silver-tin polymetallic project in Potosi Department, southern Bolivia. A total of 181.5 linekm of magnetic data were collected on 50m spaced north-south lines on all of the accessible parts of the property. read more

Eloro Resources Intersects 122.7 g Ag eq/t over 123.6m and 105.4 g Ag eq/t over 173.6m in the Santa Barbara Breccia Pipe at its Iska Iska Silver-Tin Polymetallic Project, Bolivia

ELO.V, Eloro, 321gold.com, Bob Moriarty, Bolivia, Iska Iska property,
Table 1

Eloro Resources Ltd. (TSX-V: ELO; OTCQX: ELRRF FSE: P2QM) (“Eloro”, or the “Company”) is pleased to provide an update on its Iska Iska silver-tin polymetallic project in Potosi Department, southern Bolivia. To date, the Company has completed 33 diamond drill holes totalling 14,346.7 metres (“m”) to test the Huayra Kasa Mine area, Santa Barbara Breccia Pipe (“SBBP”) and Central Breccia Pipe (“CBP”) targets. This press release reports drilling results from hole DSB-07 which tested the SBBP. Currently three drill rigs are in operation at Iska Iska. Two surface drill rigs are testing the Central Breccia from the northern and southern radial setups and one underground drill is testing the target area east of SBBP. Figure 1 is a geological plan map depicting the locations of the drill holes with updated geological interpretation. Figure 2 is a NW-SE longitudinal section along the axis of the 800m long SBBP, showing the location of the main mineralized zone and of Hole DSB-07. Table 1 details significant drilling results and Table 2 lists holes completed with assays pending and holes in progress. Highlights are as follows: read more