Eloro Resources Intersects 169.11 g Ag eq/t (64.30 g Ag/t, 0.96% Zn, 0.37% Pb and 0.07% Sn) over 235.55m to further Expand Higher Grade area to the North in the Eastern Part of the Santa Barbara Target at the Iska Iska Silver-Tin Polymetallic Project, Potosi Department, Bolivia

Includes a higher-grade section in this underground hole DSBU-06 (Azimuth 00 and dip -650) of 314.52 g Ag eq/t (192.18g Ag/t, 0.22 g Au/t, 0.07% Zn, 0.41% Pb, and 0.11% Sn) over 50.68m and an additional intersection of 110.57 g Ag eq/t (17.38 g Ag/t, 0.09 g Au/t, 0.30% Zn, 0.21% Pb and 0.11%Sn) over 128.44m further down the hole. Overall, for DSBU-06, 86% of this 599.8m long hole had reportable intersections, which collectively average 129.70 g Ag eq/t. Underground hole DSBU-05 on the same due north section as DSBU-06, but shallower at -400, intersected 141.05 g Ag eq/t (22.99g Ag/t, 0.07g Au/t, 0.18% Zn, 0.16% Pb, 0.21% Cu and 0.12% Sn) over 153.25m. Hole DSBU-05 has a second major intersection lower in the hole from 348.08m to 526.17m of 92.47 g Ag eq/t (23.86g Ag/t, 0.96% Zn, 0.21% Pb) over 178.09m. Overall, 65% of this 641.9m long hole had reportable intersections which collectively average 107.73 g Ag eq/t.
ELO.V, Eloro, 321gold.com, Bob Moriarty, Bolivia, Iska Iska property,
Figure 1

Eloro Resources Ltd. (TSX-V: ELO; OTCQX: ELRRF; FSE: P2QM) (“Eloro”, or the “Company”) is pleased to announce assay results from an additional six (6) diamond drill holes from its on-going drilling program at the Iska Iska silver-tin polymetallic project in the Potosi Department, southern Bolivia. Holes DSBU-05 and DSBU-06 are underground holes drilled from the Santa Barbara adit to test the northern extension of the higher-grade mineralized zone. Hole DSBS-01 was collared in the southern part of the Santa Barbara target zone and drilled at an azimuth of 300 and dip of -300 to test the same target. Holes DSB-24, DSB-14 and DSB-22 were drilled at azimuths of 2250 to test the northwest extension of the Santa Barbara mineralized zone approximately 100m, 200m, and 1,000m, respectively, northwest of the Santa Barbara adit underground drill bay. Drilling is continuing in the Porco area to test for a potential Sn porphyry as suggested by the 3D inverse magnetic model (see Eloro press release March 1, 2022). Thus far, 4,870 m in five (5) holes have been completed in the Porco target area with assays pending. read more

Eloro Resources Intersects 182.34g Ag eq/t (29.85g Ag/t, 1.01% Zn, 0.64% Pb, 0.11% Cu and 0.11% Sn) over 351.0m in Southern Part of Santa Barbara Target at Iska Iska Silver-Tin Polymetallic Project, Potosi Department, Bolivia

Includes higher-grade sections in hole METSBUG-01 of: 261.14g Ag eq/t (24.65g Ag/t, 0.15% Zn, 0.14% Pb, 0.81% Cu and 0.19% Sn) over 22.56m 599.26g Ag eq/t (208.14g Ag/t, 0.28% Zn, 0.51% Pb, 0.56% Cu and 0.41% Sn) over 17.60m 324.72g Ag eq/t (12.49g Ag/t, 1.88% Zn, 1.26% Pb, 0.02% Cu and 0.31% Sn) over 30.01m 292.78g Ag eq/t (55.64g Ag/t, 2.70% Zn, 1.31% Pb, 0.02% Cu and 0.12% Sn) over 31.72m Hole DSB-25, drilled approximately 400m northwest of hole METSBUG-01, intersected 25 reportable intersections with a best result of 205.13g Ag eq/t (25.01g Ag/t, 0.11g Au/t, 0.13% Cu and 0.25% Sn) over 81.11m including a higher-grade section of 428.83g Ag eq/t (55.88g Ag/t, 0.19g Au/t, 0.28% Cu and 0.53 %Sn) over 17.93m
ELO.V, Eloro, 321gold.com, Bob Moriarty, Bolivia, Iska Iska property,

 Eloro Resources Ltd. (TSX-V: ELO; OTCQX: ELRRF; FSE: P2QM) (“Eloro”, or the “Company”) is pleased to announce assay results from an additional two (2) diamond drill holes from its on-going drilling program at the Iska Iska silver-tin polymetallic project in the Potosi Department, southern Bolivia. Hole METSBUG-01 is an underground hole drilled for metallurgical sampling purposes from the Santa Barbara adit, while step-out hole DSB-25 was drilled approximately 400m northwest of hole METSBUG-01. Both holes intersected major new extensions of the already large Santa Barbara mineralized zone. read more

Eloro Resources Intersects 172.43 g Ag eq/t (40.16 g Ag/t, 0.51% Zn, 0.41% Pb and 0.13% Sn) over 303.05m in Southern Part of Santa Barbara Target at Iska Iska Silver-Tin Polymetallic Project, Potosi Department, Bolivia

Includes higher-grade sections of 507.64 g Ag eq/t (119.36 g Ag/t, 0.14 g Au/t, 0.57 %Pb and 0.52 %Sn) over 49.55m from 0.0 to 49.55m and 196.67 g Ag eq/t (66.93 g Ag/t, 1.03% Zn, 0.67% Pb and 0.08% Sn) over 77.77m in underground drill hole METSBUG-02. Hole DSB-20, which is in approximately the centre of the NW Extension target area, intersected 22 reportable intersections with a best result of 129.42 g Ag eq/t (21.79 g Ag/t, 0.27% Zn, 0.36% Pb and 0.12% Sn) over 73.65m including a higher-grade section of 204.03 g Ag eq/t (27.54 g Ag/t, 0.40% Zn, 0.55% Pb and 0.21% Sn) over 28.57m.
ELO.V, Eloro, 321gold.com, Bob Moriarty, Bolivia, Iska Iska property,

Eloro Resources Ltd. (TSX-V: ELO; OTCQX: ELRRF; FSE: P2QM) (“Eloro”, or the “Company”) is pleased to announce assay results from six (6) additional diamond drill holes from its on-going drilling program at the Iska Iska silver-tin polymetallic project in the Potosi Department, southern Bolivia. Hole METSBUG-02 is an underground hole drilled northeast from the Santa Barbara adit for metallurgical purposes and to complete fill-in drilling. The remaining five (5) holes tested the NW extension in the Santa Barbara Mineral Resource Target Area (DSB-12, -13, -15, -20 and -21) on a series of NE-SW sections as shown in Figure 1. read more