GR Silver Mining Defines New High-Grade Gold Zones Parallel to the Plomosas Vein System, Including 0.4 m at 9.7 g/t Au and 2.0 m at 4.45 g/t Au

Figure 1: Geological Map of the Trampolín and Corta Pico Vein Systems (CNW Group/GR Silver Mining Ltd.)

GR Silver Mining Ltd. (“GR Silver Mining” or the “Company”) (TSXV: GRSL) (OTCQB: GRSLF) (FRANKFURT: GPE) – is pleased to report first exploration results for the Trampolín and Corta Pico vein systems, representing a set of N-S and NE-SW trending veins, located between the Plomosas and Loma Dorada vein systems. The Trampolín vein system can be considered the NE extension of the San Juan vein system, expanding the footprint of Au mineralization over 1,300 m to the NE (Figure 1). The results from Trampolín and Corta Pico confirm the presence of two Au-rich epithermal vein systems with the potential for higher-grade Au and Ag mineralization at depth. Mineralization at Trampolín and Corta Pico remains open along strike and down dip for future drilling. read more