Eloro Resources Ltd. (TSX-V: ELO; OTCQX: ELRRF FSE: P2QM) (“Eloro”, or the “Company”) is pleased to provide an update on its Iska Iska silver-tin polymetallic project in Potosi Department, southern Bolivia. To date, the Company has completed 46 diamond drill holes totalling 22,398.9 metres (m) to test major target areas at Iska Iska. This press release reports drilling results from four (4) additional holes which tested the mineralized envelope of the Santa Barbara Breccia Pipe (“SBBP”) and the central-southern part of the Central Breccia Pipe (“CBP”). To date, every drill hole that has been assayed has returned multiple reportable mineralized intercepts. Currently three drill rigs are in operation at Iska Iska. One surface drill rig is completing first pass drilling of the major Porco (South) Target. The second surface drill is currently cleaning out drill holes on the SBBP radial platform for the planned downhole induced polarization/resistivity (IP/RES) survey then will be moved to test the gap area between the Central and Porco Breccia Pipes. The third drill, an underground rig, is testing the northeast part of SBBP and its mineralized envelope. This drill will shortly be moved to a new drill bay recently completed on the west end of the Santa Barbara adit. Figure 1 is a geological plan map showing locations of drill holes and an updated geological interpretation. Figure 2 is a more detailed geological plan map of the SBBP and northern CBP areas showing the magnetic low target to the northwest of the SBBP where drilling is planned (see press release June 7, 2021 for an overview of the magnetic results). Table 1 provides significant drilling results and Table 2 lists holes completed with assays pending as well as holes in progress in the three major target areas. Highlights are as follows: read more