A Preliminary Economic Assessment (“PEA”) is a significant milestone for junior exploration companies, essentially it promotes them into a select group of “valued asset” owners in the mining industry. It is a third-party assessment of the economic viability of the project’s resource estimates which a company has completed to date and it is an outline of the steps to be taken to reach commercial production.read more
Long term gold price of US$1,750/oz, Exchange rate of CAD$1.00 = US$0.77 Post-tax NPV5% of CAD$388M and IRR of 20.8% Post-tax payback period of 2.9 years and mine life of 9.7 years Capex of CAD$341M Average all-in sustaining cost of US$755/oz Average annual production of 116,900 oz 4,500 tpd underground operation Average sorted grade of 4.55 g/t Au for mill feed Processing plant with capacity of 3,000 tpd and rate of recovery of 93.1% Sorting of mineralization increases the grade of material prior to milling operations and recovery rate and also reduces costs of mill construction, material handling, milling and restoration leading to a reduced environmental footprint of mine tailings and thus increasing the social acceptability of the project
Cartier Resources Inc. (TSX-V: ECR) (“Cartier”) is pleased to announce the positive results of the Preliminary Economic Assessment (“PEA”), prepared in accordance with National Instrument 43-101 – Standard of Disclosure for Mineral Projects (“NI 43-101”), on the Chimo Mine Project located 45 km east of the Val-d’Or mining camp.read more
Holes DSB-50, DSB-51 and DSB-52, the southernmost holes that tested the potential south-southeastern extension of the High-Grade Zone at Santa Barbara, each returned well mineralized intersections over 100m core length as follows: 86.67g Ag eq/t (13.57g Ag/t, 0.99% Zn and 0.41% Pb) over 105.42m including 193.50 g Ag eq/t (15.34g Ag/t, 3.22% Zn and 0.17% Pb) over 10.57m (DSB-50) 103.03g Ag eq/t (5.18g Ag/t, 1.72% Zn and 0.21% Pb) over 143.06m including 175.06 g Ag eq/t (9.39g Ag/t, 2.96% Zn and 0.35% Pb) over 49.87m (DSB-51) 123.28g Ag eq/t (7.46g Ag/t, 0.14 g Au/t, 1.85% Zn and 0.26% Pb) over 119.77m including 306.28 g Ag eq/t (18.03g Ag/t, 0.45g Au/t, 4.55% Zn and 0.47% Pb) over 28.79m (DSB-52) Drill holes in the south-southeastern extension of the Santa Barbara Deposit are notably Zn-rich returning some of the highest Zn values intersected thus far. These three holes expand the strike extent of the Santa Barbara High-Grade Zone to more than 1,100m significantly expanding the potential open pittable resource. The High-Grade zone is now 800m across and is open along strike to the south-southeast.
Eloro Resources Ltd. (TSX: ELO; OTCQX: ELRRF; FSE: P2QM) (“Eloro”, or the “Company”) is pleased to announce assay results from the last eight (8) diamond drill holes from the definition drill program at Santa Barbara in the Iska Iska silver-tin polymetallic project in the Potosi Department, southern Bolivia. Two (2) of these drill holes (DSB-45 and DSB-47) filled in gaps in previous drilling of the High-Grade Zone. The remaining six (6) holes (DSB-44. DSB-48, DSB-49, DSB-50, DSB-51 and DSB-52) tested the potential south-southeastern extension of the High-Grade Zone at Santa Barbara.read more
Over on Substack, I write about Cartier Resources (ECR.V). Philippe Cloutier is racking up the gold ounces at the old Chimo Mine site in Quebec. While we’re waiting for news, here’s the background. Cartier Resources: A Golden Layer Cake
Cartier Resources Inc. (TSX-V: ECR) (“Cartier”) announces drill results in the East Chimo Mine Sector, located at the midpoint of 450 m between the Chimo Mine and West Nordeau sectors (FIGURE 1). The results are located on the Chimo Mine Property, 100% owned by Cartier, which is located 45 km east of the Val-d’Or mining camp.read more
The silver grades in DHK-27 are the highest and most extensive yet intersected in the Santa Barbara deposit. 50% of this 860m long hole, drilled from Huayra Kasa due west at -45 degrees, returned reportable intersections averaging 172.09 g Ag eq/t. Holes DHK-26, DHK-28, DHK-29, DHK-30 and DSB-42, which returned multiple intersections, are additional holes collared in the Huayra Kasa area that tested the eastern margin of the High-Grade Zone at Santa Barbara. Highlights include: 222.51g Ag eq/t (28.44g Ag/t, 3.11% Zn and 0.26% Pb) over 53.90m and 99.76 g Ag eq/t (32.59g Ag/t, 0.11 g Au/t and 0.54% Zn) over 82.38m (DHK-26). 79.22g Ag eq/t (26.62g Ag/t, 0.35% Zn and 0.35% Pb) over 141.56m including 162.77g Ag eq/t (67.00g Ag/t, 0.55% Zn and 1.30% Pb) over 23.85m (DHK-28). 176.28g Ag eq/t (19.10g Ag/t, 2.29% Zn and 0.27% Pb) over 21.30m and 82.48g Ag eq/t (5.07g Ag/t, 0.21 g Au/t, 0.78% Zn and 0.18% Pb) over 69.18m (DHK-29). 130.69g Ag eq/t (7.19g Ag/t, 1.83% Zn and 0.48% Pb) over 42.17m and 129.98g Ag eq/t (19.71g Ag/t, 1.50% Zn and 0.57% Pb) over 72.31m including a higher-grade portion of 208.42g Ag eq/t (33.10g Ag/t, 2.37% Zn and 1.00% Pb) over 34.64m (DSB-42). Channel sampling of the Mina1 and Mina2 underground workings in the southern part of the property approximately 2km south-southeast of the Santa Barbara adit, returned significant values in vein breccias as follows: 153.94g Ag eq/t (55.03g Ag/t, 0.11 g Au/t, 0.7% Zn, 0.16% Pb and 0.08 % Sn) over 145.95m of the northwest trending drift including a higher-grade portion of 285.16g Ag eq/t (120.18g Ag/t, 0.25 g Au/t 1.23% Zn, 0.30% Pb and 0.13% Sn) over 56.34m in Mina 1. 382.79g Ag eq/t (15.67g Ag/t, 1.70 g Au/t, 2.20% Zn and 0.75% Pb) over 68.53m in an east-west trending crosscut in Mina 2. A second shorter crosscut on a secondary subparallel structure approximately 20m to the south returned 475.78g Ag eq/t (69.31g Ag/t, 0.26 g Au/t, 5.62% Zn and 1.92% Pb) over 26.67m in Mina 2. Drilling across the valley of the Iska Iska Caldera indicates that this area is underlain by a coarse-grained porphyritic dacitic intrusion that is well mineralized with Ag, Zn and Pb and is the likely source of the extensive epithermal mineralization in the Santa Barbara and Central Breccia areas. The porphyry, now named the Iska Iska Porphyry, is approximately 800m by 600m and is notable for the absence of tin mineralization despite the abundance of tin in the nearby area. The tin at Iska Iska is likely the product of an earlier higher temperature and deeper tin porphyry, which has been overprinted by the later higher-level porphyry-epithermal Ag-Zn-Pb mineralization related to the Iska Iska Porphyry. The definition drilling has more than doubled the volume of the High-Grade Zone defined by the >90 g Ag eq/t grade shell model to approximately 1,000m along strike, 800m wide and extending to a depth of 1,100m. This zone is open to the south, west and northwest as well as at depth. Eloro is working closely with Micon International to provide all data necessary for estimation of the inaugural mineral resource estimate targeted for the end of Q1 2023. Magnetic inverse modelling and limited deep drilling suggest that the major tin porphyry is likely below the Iska Iska Porphyry and to the south and southwest in the Porco and Mina Casiterita areas. The tin porphyry will be a major focus of exploration in 2023.
Eloro Resources Ltd. (TSX-V: ELO; OTCQX: ELRRF; FSE: P2QM) (“Eloro”, or the “Company”) is pleased to announce assay results from eight (8) additional diamond drill holes from its definition drilling program at the Iska Iska silver-tin polymetallic project in the Potosi Department, southern Bolivia. Hole DHK-27 was drilled from Huayra Kasa due west at -45 degrees to a length of 860m to fill-in gaps in previous drilling of the High-Grade Zone. Five (5) additional holes (DHK-26. DHK-28, DHK-29, DHK-30 and DSB-42) were drilled to the southwest from the Huayra Kasa area to test the eastern margin of the Santa Barbara deposit. Hole DSB-43 was drilled on southwest side of Santa Barbara and hole DSB-46 tested the potential south-southeastern extension.read more
GR Silver Mining Ltd. (“GR Silver Mining” or the “Company”) (TSXV: GRSL) (OTCQB: GRSLF) (FRANKFURT: GPE) – is pleased to announce additional results from 38 infill drill holes in the resource update program underway at the Company’s Plomosas Mine Area, Plomosas Project in Sinaloa, Mexico. These drill holes were targeted to replace historical holes used in the 2021 NI 43-101 mineral resource estimate, where unsampled intervals were assigned zero values, or to test new high-grade Ag-Au mineralized zones, identified by the Company in both the footwall and hanging wall of the main mineralized zone (Figure 1). GR Silver Mining’s infill drilling program is continuing in the Plomosas Mine Area, and to date has added 105 holes (7,330 m) of new drilling inside the historic Plomosas Mine since completion of the Company’s 2021 NI 43-101 mineral resource estimation.read more
Announcing the start of the operating season is usually a somewhat ho-hum press release. However, Tocvan Ventures (TOC:CSE) is beginning to drill the 24 km2 area that makes up the El Picacho Project in Sonora Mexico. While the company will continue to work on its Pilar project, the real excitement this season will come from Picacho.read more
This intersection in hole DSB-36, drilled 400m southeast of the Santa Barbara adit, includes higher-grade portions of: 180.29 g Ag eq/t (24.27 g Ag/t, 2.49% Zn and 0.73% Pb) over 24.13m. 197.54 g Ag eq/t (17.04 g Ag/t, 2.96% Zn and 0.58% Pb) over 11.82m. 211.34 g Ag eq/t (30.50 g Ag/t, 2.87% Zn and 0.76% Pb) over 6.02m. Other significant intersections in this hole include: 101.31 g Ag eq/t (28.14 g Ag/t, 0.19% Zn, 0.55% Pb and 0.26% Cu) over 77.82m. 101.47 g Ag eq/t (23.88 g Ag/t, 1.08% Zn and 0.56% Pb) over 55.54m. 205.75 g Ag eq/t (20.69 g Ag/t, 0.15 g Au/t, 0.68% Zn and 0.75% Pb) over 22.75m. 136.82 g Ag eq/t (3.33 g Ag/t, 0.09 gAu/t, 1.72% Zn, 0.31% Pb and 0.07% Sn) over 78.39m including 478.26 g Ag eq/t (12.60 g Ag/t, 0.27 gAu/t, 5.61% Zn, 0.91% Pb and 0.28% Sn over 10.53m 203.26 g Ag eq/t (1.73 g Ag/t, 0.75% Zn and 0.42% Sn) over 12.22m. The last sample in this 935.4m long hole returned 549.91g Ag eq/t (46.00 g Ag/t, 3.33% Zn, 2.27%Pb and 0.68% Sn) over 1.51m. 52% of this hole contained reportable intersections which collectively averaged 112.48 g Ag eq/t. On-Strike Extension of High Grade Feeder Zone at Santa Barbara to South-Southeast now confirmed for an additional 400m and is open along strike.
Eloro Resources Ltd. (TSX-V: ELO; OTCQX: ELRRF; FSE: P2QM) (“Eloro”, or the “Company”) is pleased to announce assay results from two (2) additional diamond drill holes from its on-going drilling program at the Iska Iska silver-tin polymetallic project in the Potosi Department, southern Bolivia. One drill hole, DSB-36, collared 400m southeast of the Santa Barbara adit, tested the extension of the core of the high-grade feeder zone at Santa Barbara while hole DSB-34, tested the potential southwest limits of the high-grade feeder zone as shown in Figure 1.read more
Eloro Resources Ltd. (TSX-V: ELO; OTCQX: ELRRF; FSE: P2QM) (“Eloro”, or the “Company”) is pleased to announce that, by mutual agreement with Empresa Minera Villegas S.R.L. (“Minera Villegas”), the title holder of the Iska Iska silver-tin polymetallic project in the Potosi Department, southern Bolivia (“Iska Iska”), the payment schedule in connection with the US$10 million payment required for Eloro to earn a 99% interest in Iska Iska has been amended.read more