Clean Air Metals Announces the New SLR Mineral Resource Estimate for the Thunder Bay North Critical Metals Project with an Indicated Resource of 14.0 million tonnes containing 1.2 million ounces of 2PGE (Pt+Pd) 57,500 tonnes of Cu and 34,300 tonnes of Ni

Clean Air Metals Inc. (“Clean Air Metals” or the “Company“) (TSXV: AIR) (OTCQB: CLRMF) (FRA: CKU) is pleased to announce that further to its disclosure of February 15, 2023, the Company has completed an updated Indicated and Inferred Mineral Resource estimate disclosed in accordance with National Instrument 43-101 (“NI 43-101″) for the Company’s 100%-owned Thunder Bay North Critical Metals Project (the “Project“). read more

Clean Air Metals Announces a PEA of the Current and Escape PGE-Cu-Ni Deposits of the Thunder Bay North Project, with post-tax NPV5 of C$378m, IRR 29.8%

Figure 1: Proposed Site Plan with Mineable Current and Escape Deposits (CNW Group/Clean Air Metals Inc.)

Clean Air Metals Inc. (“Clean Air Metals” or the “Company“) (TSXV: AIR) (FRA: CKU) (OTCQB: CLRMF) is pleased to announce results from an independent Preliminary Economic Assessment (PEA) that was completed for its Thunder Bay North Platinum Group Element (PGE) – Copper (Cu) – Nickel (Ni) Project (“Thunder Bay North” or the “Project”) near Thunder Bay, Ontario, Canada. The PEA was prepared by Nordmin Engineering Ltd. (“Nordmin”) of Thunder Bay, Ontario, and includes a new stand-alone milling complex and waste storage facility (WSF) with mill feed from both the Current deposit and the Escape deposit, part of the Thunder Bay North Project Mineral Resource Estimate as amended, that was completed by Nordmin (see press release dated January 20, 2021). All amounts are in CAD dollars, unless otherwise stated. Summary results of the PEA are shown below in Table 1. read more