Eloro Resources Intersects 160.00 g Ag eq/t (27.37g Ag/t, 0.62% Zn, 0.52% Pb and 0.11% Sn) over 251.87m and 133.45 g Ag eq/t (19.10g Ag/t, 0.20 g Au/t, 0.42% Zn, 0.64% Pb and 0.08% Sn) over 289.45m in the Santa Barbara Target area at the Iska Iska Silver-Tin Polymetallic Project, Potosi Department, Bolivia

These new drill results combined with previously released drill results for the underground drilling are defining a potential major feeder structure for the Ag-Sn polymetallic mineralization in the Santa Barbara Adit area. Bore Hole Induced Polarization (BHIP) surveys to a depth of almost 1,000m indicates that the conductivity increases with depth indicating that this potential feeder zone could be substantive.
ELO.V, Eloro, 321gold.com, Bob Moriarty, Bolivia, Iska Iska property,

Eloro Resources Ltd. (TSX-V: ELO; OTCQX: ELRRF; FSE: P2QM) (“Eloro”, or the “Company”) is pleased to announce assay results from an additional four (4) diamond drill holes from its on-going drilling program at the Iska Iska silver-tin polymetallic project in the Potosi Department, southern Bolivia. Holes DSBU-08, DSBU-07 and DSBU-04 are underground holes drilled from the Santa Barbara adit to test the southwestern and southern extension of the higher-grade mineralized zone. Surface drill hole DSB-26 tested the northwest extension of the Santa Barbara mineralized zone approximately 800m northwest of the Santa Barbara adit underground drill bay. Drilling is currently focussed primarily on the Santa Barbara Resource Definition Drilling Area with two surface drills and one underground drill. One surface drill is completing holes in the Porco area to test for a potential tin porphyry as suggested by the 3D inverse magnetic model (see Eloro press release dated March 1, 2022). read more

GR Silver Continues to Deliver Wide, High-grade Drill Results at Plomosas: 6.5 m at 1,458 g/t Ag Including 0.9 m at 3,118 g/t Ag in PLIP22-013

Figure 1: Longitudinal Section Plomosas Mine Infill Drilling Results – Ag Block Model (CNW Group/GR Silver Mining Ltd.)

GR Silver Mining Ltd. (“GR Silver Mining” or the “Company”) (TSXV: GRSL) (OTCQB: GRSLF) (FRANKFURT: GPE) – announces high-grade silver (Ag) results from underground infill drilling at the Plomosas Project in Sinaloa State, Mexico. The results continue to support the potential to increase Ag grades in the Plomosas Mine Area resource. The drilling targeted high grade Ag mineralization in the upper levels of the underground workings, in areas where unsampled intervals from historical drill holes within the 2021 resource block model were previously assigned zero values. read more

Eloro Resources Intersects 169.11 g Ag eq/t (64.30 g Ag/t, 0.96% Zn, 0.37% Pb and 0.07% Sn) over 235.55m to further Expand Higher Grade area to the North in the Eastern Part of the Santa Barbara Target at the Iska Iska Silver-Tin Polymetallic Project, Potosi Department, Bolivia

Includes a higher-grade section in this underground hole DSBU-06 (Azimuth 00 and dip -650) of 314.52 g Ag eq/t (192.18g Ag/t, 0.22 g Au/t, 0.07% Zn, 0.41% Pb, and 0.11% Sn) over 50.68m and an additional intersection of 110.57 g Ag eq/t (17.38 g Ag/t, 0.09 g Au/t, 0.30% Zn, 0.21% Pb and 0.11%Sn) over 128.44m further down the hole. Overall, for DSBU-06, 86% of this 599.8m long hole had reportable intersections, which collectively average 129.70 g Ag eq/t. Underground hole DSBU-05 on the same due north section as DSBU-06, but shallower at -400, intersected 141.05 g Ag eq/t (22.99g Ag/t, 0.07g Au/t, 0.18% Zn, 0.16% Pb, 0.21% Cu and 0.12% Sn) over 153.25m. Hole DSBU-05 has a second major intersection lower in the hole from 348.08m to 526.17m of 92.47 g Ag eq/t (23.86g Ag/t, 0.96% Zn, 0.21% Pb) over 178.09m. Overall, 65% of this 641.9m long hole had reportable intersections which collectively average 107.73 g Ag eq/t.
ELO.V, Eloro, 321gold.com, Bob Moriarty, Bolivia, Iska Iska property,
Figure 1

Eloro Resources Ltd. (TSX-V: ELO; OTCQX: ELRRF; FSE: P2QM) (“Eloro”, or the “Company”) is pleased to announce assay results from an additional six (6) diamond drill holes from its on-going drilling program at the Iska Iska silver-tin polymetallic project in the Potosi Department, southern Bolivia. Holes DSBU-05 and DSBU-06 are underground holes drilled from the Santa Barbara adit to test the northern extension of the higher-grade mineralized zone. Hole DSBS-01 was collared in the southern part of the Santa Barbara target zone and drilled at an azimuth of 300 and dip of -300 to test the same target. Holes DSB-24, DSB-14 and DSB-22 were drilled at azimuths of 2250 to test the northwest extension of the Santa Barbara mineralized zone approximately 100m, 200m, and 1,000m, respectively, northwest of the Santa Barbara adit underground drill bay. Drilling is continuing in the Porco area to test for a potential Sn porphyry as suggested by the 3D inverse magnetic model (see Eloro press release March 1, 2022). Thus far, 4,870 m in five (5) holes have been completed in the Porco target area with assays pending. read more

Eloro Resources Intersects 172.43 g Ag eq/t (40.16 g Ag/t, 0.51% Zn, 0.41% Pb and 0.13% Sn) over 303.05m in Southern Part of Santa Barbara Target at Iska Iska Silver-Tin Polymetallic Project, Potosi Department, Bolivia

Includes higher-grade sections of 507.64 g Ag eq/t (119.36 g Ag/t, 0.14 g Au/t, 0.57 %Pb and 0.52 %Sn) over 49.55m from 0.0 to 49.55m and 196.67 g Ag eq/t (66.93 g Ag/t, 1.03% Zn, 0.67% Pb and 0.08% Sn) over 77.77m in underground drill hole METSBUG-02. Hole DSB-20, which is in approximately the centre of the NW Extension target area, intersected 22 reportable intersections with a best result of 129.42 g Ag eq/t (21.79 g Ag/t, 0.27% Zn, 0.36% Pb and 0.12% Sn) over 73.65m including a higher-grade section of 204.03 g Ag eq/t (27.54 g Ag/t, 0.40% Zn, 0.55% Pb and 0.21% Sn) over 28.57m.
ELO.V, Eloro, 321gold.com, Bob Moriarty, Bolivia, Iska Iska property,

Eloro Resources Ltd. (TSX-V: ELO; OTCQX: ELRRF; FSE: P2QM) (“Eloro”, or the “Company”) is pleased to announce assay results from six (6) additional diamond drill holes from its on-going drilling program at the Iska Iska silver-tin polymetallic project in the Potosi Department, southern Bolivia. Hole METSBUG-02 is an underground hole drilled northeast from the Santa Barbara adit for metallurgical purposes and to complete fill-in drilling. The remaining five (5) holes tested the NW extension in the Santa Barbara Mineral Resource Target Area (DSB-12, -13, -15, -20 and -21) on a series of NE-SW sections as shown in Figure 1. read more

GR Silver Mining Defines New High-Grade Gold Zones Parallel to the Plomosas Vein System, Including 0.4 m at 9.7 g/t Au and 2.0 m at 4.45 g/t Au

Figure 1: Geological Map of the Trampolín and Corta Pico Vein Systems (CNW Group/GR Silver Mining Ltd.)

GR Silver Mining Ltd. (“GR Silver Mining” or the “Company”) (TSXV: GRSL) (OTCQB: GRSLF) (FRANKFURT: GPE) – is pleased to report first exploration results for the Trampolín and Corta Pico vein systems, representing a set of N-S and NE-SW trending veins, located between the Plomosas and Loma Dorada vein systems. The Trampolín vein system can be considered the NE extension of the San Juan vein system, expanding the footprint of Au mineralization over 1,300 m to the NE (Figure 1). The results from Trampolín and Corta Pico confirm the presence of two Au-rich epithermal vein systems with the potential for higher-grade Au and Ag mineralization at depth. Mineralization at Trampolín and Corta Pico remains open along strike and down dip for future drilling. read more

Eloro Resources Intersects 239.72 g Ag eq/t (39.58 g Ag/t, 1.04% Pb, 0.26% Cu and 0.20% Sn) over 82.74m in Southern Part of Santa Barbara Target at Iska Iska Silver-Tin Polymetallic Project, Potosi Department, Bolivia

Includes a higher-grade section of 318.15 g Ag eq/t (53.58 g Ag/t, 1.43 % Pb, 0.32 %Cu and 0.27 %Sn) over 51.09m in underground drill hole DSBU-01. 134.47 g Ag eq/t (10.79 g Ag/t, and 0.15 %Sn) over 115.44m including a higher-grade section of 160.87 g Ag eq/t (9.65 g Ag/t, 0.21% Cu, and 0.17 %Sn) over 37.55m in underground hole DSBU-02. Promising results from these holes across a well mineralized width of 200+m opens significant possibilities in the southern extension of the Santa Barbara target area where additional drilling is now planned.
ELO.V, Eloro, 321gold.com, Bob Moriarty, Bolivia, Iska Iska property,

Eloro Resources Ltd. (TSX-V: ELO; OTCQX: ELRRF; FSE: P2QM) (“Eloro”, or the “Company”) is pleased to announce further assay results from seven (7) additional diamond drill holes from its on-going drilling program at the Iska Iska silver-tin polymetallic project in the Potosi Department, southern Bolivia. Two (2) of these holes (DSBU-01 and DSBU-02) are underground holes drilled from the Santa Barbara adit. Three (3) of the holes tested the Central Breccia Pipe (“CBP”) target (DCN-06 and DCN-07 from the Central North radial drilling platform and DCS-04 from the south platform). The final two (2) holes reported in this release tested the Porco Breccia Pipe (“PBP”) target. read more

Renforth Raises $1,376,260 To Fund Continued 2022 Exploration Of Battery Metals At Victoria West Within The Surimeau District Property And On The Parbec Gold Deposit

Renforth Resources

Renforth Resources Inc. (CSE:RFR) (CNSX:RFR.CN) (OTC:RFHRF) (FSE-9RR) (“Renforth” or the “Company”) is pleased to announce that it has completed a private placement financing (the “Offering”) raising $1,376,260 through the issuance of 13,750,0000 of flow-through common units (“Flow-Through Units”), and 14,000 common units (“Units). read more

Renforth is Drilling Victoria West Nickel/Copper/Cobalt/Zinc Stripped Area at Surimeau District Property in NW Quebec

Renforth Resources

Renforth Resources Inc. (CNSX:RFR.CN) (OTC:RFHRF) (FSE:9RR) (“Renforth” or the “Company”) is pleased to inform shareholders that drilling is underway under visual surface nickel, copper, cobalt and zinc mineralization previously stripped at our Victoria West target, within our 260 km2 property, contiguous to the Canadian Malartic Mine in Malartic, Quebec. read more

Channel Sampling at Porco Adit returns 103m Strike Length Grading 521 Ag eq/t (including 117 g Ag/t, 1.44 g Au/t, 0.54% Cu and 0.66%Sn) at Iska Iska Silver-Tin Polymetallic Project, Potosi Department, Bolivia

Drill hole DPC-01 on the edge of a major magnetic susceptibility anomaly in the Porco Breccia Pipe area returned sixteen (16) separate zones of sulphide veins including 110.30 g Ag eq/t over 3.0m. Magnetic inversion model outlines extensive target zone in the Porco-Central Breccia Pipe areas.
ELO.V, Eloro, 321gold.com, Bob Moriarty, Bolivia, Iska Iska property,

Eloro Resources Ltd. (TSX-V: ELO; OTCQX: ELRRF; FSE: P2QM) (“Eloro”, or the “Company”) is pleased to provide an update on its Iska Iska silver-tin polymetallic project in the Potosi Department, southern Bolivia. To date, the Company has completed 35,738 metres (m) in 68 drill holes including three (3) in progress to test major target areas at Iska Iska. This press release reports drilling results from one (1) additional hole which tested the Porco Breccia Pipe (“PBP”) (Hole DPC-01) and new underground channel sampling from the Porco adit located approximately 200m south of the PBP. Currently three drill rigs are in operation at Iska Iska. Two surface drill rigs are continuing to drill at the Santa Barbara Resource Definition Target Zone (Figure 1) to outline an initial National Instrument 43-101 (“NI-43-101”) compliant resource. A third drill, an underground rig, situated in the west end of the Santa Barbara Adit, is testing the eastern part of Santa Barbara Breccia Pipe (“SBBP’) and its mineralized envelope. Figure 1 is a geological plan map showing locations of drill holes completed, in progress and planned to complete resource definition drilling along with an updated geological interpretation. Figure 2 is a plan map of channel sampling at the Porco adit. Table 1 provides significant drilling results with definitions of chemical symbols, Table 2 details channel sample results from the Porco adit and Table 3 lists holes completed with assays pending, as well as holes in progress in the three major target areas. Highlights include: read more

Eloro Intersects 100 Ag eq/t (including 38.71 g Ag/t, 0.88%Zn and 0.51%Pb) over 188.5 m in the Santa Barbara Breccia Pipe at Iska Iska Silver-Tin Polymetallic Project, Potosi Department, Bolivia

Section includes a higher-grade zone of 154 g Ag eq/t (including 75.51 g Ag/t, 0.96% Zn, 0.65% Pb and 0.16% Cu) over 65.8m
ELO.V, Eloro, 321gold.com, Bob Moriarty, Bolivia, Iska Iska property,

Eloro Resources Ltd. (TSX-V: ELO; OTCQX: ELRRF; FSE: P2QM) (“Eloro”, or the “Company”) is pleased to provide an update on its Iska Iska silver-tin polymetallic project in the Potosi Department, southern Bolivia. To date, the Company has completed 34,409 metres (m) in 64 drill holes including three (3) in progress to test major target areas at Iska Iska. This press release reports drilling results from one (1) additional hole which tested the Santa Barbara Breccia Pipe (“SBBP”) (Hole DHK-23) and two holes (DCN-05 and DCS-03) which tested the Central Breccia Pipe target (“CBP”). To date, every drill hole that has been assayed has returned multiple reportable mineralized intercepts. Currently three drill rigs are in operation at Iska Iska. Two surface drill rigs are continuing to drill at SBBP to outline an initial National Instrument 43-101 (“NI-43-101”) compliant resource. A third drill, an underground rig, situated in the west end of the Santa Barbara Adit, is testing the eastern part of SBBP and its mineralized envelope. Figure 1 is a geological plan map showing locations of drill holes and an updated geological interpretation. Table 1 provides significant drilling results with definitions of chemical symbols and Table 2 lists holes completed with assays pending, as well as holes in progress in the three major target areas. Highlights are as follows: read more