Eloro’s Iska Iska: Ready for News in Bolivia

Just over a year ago when I first spoke to Tom Larsen about Eloro’s (ELO.V) Iska Iska project in Bolivia he told me, “We’re looking to find 100 million plus tons.”
Just over a year ago when I first spoke to Tom Larsen about Eloro’s (ELO.V) Iska Iska project in Bolivia he told me, “We’re looking to find 100 million plus tons.”
Gran Colombia Gold Corp. (TSX: GCM; OTCQX: TPRFF) announced today the release of its unaudited interim condensed consolidated financial statements and accompanying management’s discussion and analysis (MD&A) for the three months ended March 31, 2021. All financial figures contained herein are expressed in U.S. dollars (“USD”) unless otherwise noted.
Tocvan Ventures Corp. (CSE:TOC) (“Tocvan” or the “Corporation”) is pleased to provide an update for its flagship Pilar Gold-Silver Project in Sonora, Mexico. The Phase II drill program (the “Program”) is nearing the half-way point with a total of 4,000 meters planned. To date, eleven (11) drill holes have been completed for a total of 1,811 meters (Figure 1). Samples for the first five holes have been submitted to ALS Labs in Hermosillo, the remaining samples will be submitted later this week. Early drilling focused on the extension of the Main Zone, testing deeper down-dip extensions of mineralization in addition to stepping out along strike. Drill targeting has now shifted towards testing new areas along the 4-Trench Extension and Triple Vein Zone areas.
Lucky Minerals Inc. (TSXV:LKY)(OTC PINK:LKMNF)(FRA:LKY) (“Lucky” or the “Company“) is pleased to announce it has received the balance of assays from the initial prospecting at Wayka, a gold bearing epithermal system. In addition, assay results from 16 samples were received from the Sherman area. All this activity is focused within its 100% owned Fortuna Property (“Fortuna”). Fortuna comprises approximately 55,000 hectares in a known mineralized district in southern Ecuador.
Gran Colombia Gold Corp. (TSX: GCM; OTCQX: TPRFF) announced today that it will release its 2021 first quarter results after market close on Thursday, May 13, 2021 and will host a conference call and webcast on Friday, May 14, 2021 at 9:00 a.m. Eastern Time to discuss the results.
GR Silver Mining Ltd. (TSXV: GRSL) (FRANKFURT: GPE) (OTCQB: GRSLF) (“GR Silver Mining” or the ” Company”) – is pleased to announce that it has made the final option payment of CDN$2.5 M and issued 1,500,000 common shares to SSR Mining Ltd., as required under the San Marcial option agreement dated April 17, 2018 (refer to News Release dated May 7, 2018). SSR Mining’s subsidiary, Silver Standard México, S.A. de C.V., has also been granted a 0.75% net smelter returns royalty (“NSR”). The Company has a buy-back right on the NSR that can be exercised at any time by payment of CDN$1.25 M. As required by applicable securities law and the policies of the TSX Venture Exchange, the shares will be subject to a hold period expiring September 6, 2021.
Eloro Resources Ltd. (TSX-V: ELO; OTCQX: ELRRF FSE: P2QM) (“Eloro”, or the “Company”) is pleased to provide an update on its Iska Iska silver-tin polymetallic project in Potosi Department, southern Bolivia. To date, the Company has completed 29 diamond drill holes totalling 11,696 metres to test the Huayra Kasa Mine area, Santa Barbara Breccia Pipe (“SBBP”) and Central Breccia Pipe (“CBP”) targets. This press release reports further drilling results from the first drill hole (CDN-01) to test the CBP from the northern radial platform. Figure 1 is a geological plan map showing locations of the drill holes and updated geological interpretation. Figure 2 is a NE-SW geological cross section through the eastern side of the SBBP and the northwest part of the CBP showing location of the main mineralized zone. Table 1 gives significant drilling results and Table 2 lists holes completed with assays pending. Highlights are as follows:
Tocvan Ventures Corp. (CSE:TOC) (CNSX:TOC.CN) (“Tocvan” or the “Corporation”) is pleased to announce the results of ongoing metallurgical work at its flagship Pilar Gold-Silver Project in Sonora, Mexico. Preliminary results have been received from two composite samples taken from the previously released drill hole JES-20-32. Drill hole JES-20-32 is thought to be representative of the central portion of the Main Zone, which during Phase I drilling in December of 2020 intersected 94.6-meters at 1.6 g/t Au including 9.2m at 10.8 g/t Au and 38 g/t Ag from 57.9 to 152.5 meters. The samples consisted of a low-grade (0.63 g/t Au) and a medium-grade (1.2 g/t Au) composite to determine the susceptibility of dissolution of gold through cyanide bottle testing. The results show after a retention time of 48 hours, maximum dissolution can be reached of 91% for the low-grade composite and 92% for the medium-grade composite. A summary of the results are provided in Table 1. Samples were submitted to SGS Laboratories in Durango, Mexico for analysis.
Lucky Minerals Inc. (TSXV:LKY)(OTC PINK:LKMNF)(FRA:LKY) (“Lucky” or the “Company“) is pleased to announce it has continued work at the Wayka epithermal gold discovery at its 100% owned Fortuna Property (“Fortuna”). Fortuna comprises approximately 55,000 hectares in a known mineralized zone in southern Ecuador.
GR Silver Mining Ltd. (TSXV: GRSL) (FRANKFURT: GPE) (OTCQB: GRSLF) (“GR Silver Mining” or the “Company”) – is pleased to report drill results that extend the high-grade silver mineralization 100 m to the north along strike in the San Juan Vein. Additionally, a wide, up to 65 m continuous silver mineralized zone, is delineated on the footwall of the Yecora Vein, defining shallow wide mineralized zones to be included in the upcoming maiden resource estimate at San Juan. Both veins are part of the vein system of the San Juan Area of the Plomosas Silver Project (“Plomosas Project”) in Sinaloa, Mexico.