Eloro Resources Discovers Major Breccia Pipe with Extensive Silver Polymetallic Mineralization and a High-Grade Gold-Bismuth Zone in the Iska Iska Property, Potosi Department, Southern Bolivia

ELO.V, Eloro, 321gold.com, Bob Moriarty, Bolivia, Iska Iska property,
Geological Plan Map with Drill Holes, Huayra Kasa Zone, Iska Iska Project
Source: Eloro Resources Ltd.photo-release
Geological Plan Map with Drill Holes, Huayra Kasa Zone, Iska Iska Project
Figure 1
Geological W-E Cross Section, looking north, Huayra Kasa Zone, Iska Iska Project
Figure 2
Channel Sampling Plan Map Au-Bi, Huayra Kasa Underground, Iska Iska Project
Figure 3:
Channel Sampling Plan Map Ag-Zn-Pb, Huayra Kasa Underground, Iska Iska Project
Figure 4
Geology of Southern Bolivia in Iska Iska Area showing locations of Mines and Major Polymetallic Mineral Deposits
Figure 5
  • Number of extensive mineralized intersections in holes within major breccia pipe including 54.48 g Ag/t, 1.45% Zinc (Zn) and 1.60% Lead (Pb) over 16.39m (140.91 g Ag eq/t) within a broader interval of 122.74m grading 14.29 g Ag/t, 0.81% Zn and 0.41% Pb (53.67 g Ag/t eq) in Hole DHK-04;
  • High Grade Gold-Bismuth zone averages 7.1 g Au/t and 0.2% Bi (8.29 g Au eq/t) over 3.04m width for strike length of 47m in underground workings and is open along strike to the north.
  • 6.51g Au/t, 0.07% Bi and 31.96 g Ag/t (7.68 g Au eq/t) over 11.85m grading including 29.56 g Au/t,0.26% Bi/t and 63.69 g Ag/t (31.94 g Au eq/t) over 2.31m intersected in Hole DHK-05 on the strike extension of the high-grade Au-Bi zone.

TORONTO, Nov. 18, 2020 (GLOBE NEWSWIRE) —  Eloro Resources Ltd. (TSX-V: ELO; OTCQX: ELRRF FSE: P2QM(“Eloro”, or the “Company”) is pleased to announce that Minera Tupiza S.R.L., Eloro’s Bolivian subsidiary has completed 13 diamond drill holes totalling 2,898 metres of both underground and surface drilling at its optioned Iska Iska property in the Potosí Department of southern Bolivia. This is the first drilling ever carried out on the property. Figure 1 is a plan map showing locations of drill holes along with geology and alteration. Results from Hole DHK-01 to DHK-05 are reported in this press release; results for the other holes are pending. Due to the polymetallic nature of the deposit, silver equivalent (“Ag eq”) and where applicable gold equivalent (“Au eq”) values have been included for comparative purposes. read more

Eloro Resources Stakes Additional Properties in the Iska Iska Polymetallic Property Area, Potosi Department, Southern Bolivia

ELO.V, Eloro, 321gold.com, Bob Moriarty, Bolivia, Iska Iska property,
Figure 1

Eloro Resources Ltd. (TSX-V: ELOOTCQX: ELRRF; FSE: P2QM(“Eloro”, or the “Company”) is pleased to announce that Minera Tupiza S.R.L., Eloro’s Bolivian subsidiary has staked nine (9) additional properties (known as “Mining Areas” under Bolivian law) covering a total of 311.75 square kilometres in the Potosí Department, southern Bolivia where Iska Iska is located as shown in Figure 1. The geological characteristics and target mineralization of these properties are summarized in Table 1. Figure 2 shows the regional geology in the area of the new properties. The properties are located on prominent ASTER (Advanced Spaceborne Thermal Emission and Reflection Radiometer) anomalies with a similar hydrothermal alteration signature to that of Iska Iska. The Tup-5 property ties directly onto the Iska Iska property. read more

Eloro Resources Ltd. Announces Completion of Underground Drill Bays for Diamond Drilling Program at Iska Iska Silver-Polymetallic Property Area, Potosi Department, Southern Bolivia

ELO.V, Eloro, 321gold.com, Bob Moriarty, Bolivia, Iska Iska property,

 Eloro Resources Ltd. (TSX-V: ELO; FSE: P2Q) (“Eloro”, or the “Company”) is pleased to announce that its Bolivian subsidiary Minera Tupiza S.R.L. has completed the three (3) underground drill bays in the Huayra Kasa Mine required for the planned 3,500m underground diamond drilling program on its optioned Iska Iska Polymetallic Project in Potosi Department, southern Bolivia. The Company and contractor Empresa Minera Villegas S.R.L. have implemented safeguards to protect personnel from COVID-19. Minera Tupiza S.R.L. has received clearance from the Government of Bolivia for travel to Tupiza. Drilling will be carried out by Leduc Drilling S.R.L. and is expected to commence in early September. All workings will be systematically geologically mapped and channel sampled prior to commencement of the drill program. read more

Eloro Resources Increases Financing

ELO.V, Eloro, 321gold.com, Bob Moriarty, Bolivia, Iska Iska property,

Eloro Resources Ltd. (TSX-V: ELO; FSE: P2Q) (“Eloro” or the “Corporation”) is pleased to announce that, further to its release dated May 1, 2020, it is proceeding with an increased non-brokered private placement (the “Private Placement”) of up to 2,200,000 units of Eloro at a price of $0.25 per unit (“Units”) for proceeds of up to $550,000. read more

Eloro Resources Ltd. Files NI 43-101 Technical Report by Micon on the Iska Iska Polymetallic Property, Potosi Department, Southern Bolivia

ELO.V, Eloro, 321gold.com, Bob Moriarty, Bolivia, Iska Iska property,

Eloro Resources Ltd. (TSX-V: ELO; FSE: P2Q) (“Eloro”, or the “Company”) is pleased to announce that the Company has filed on SEDAR an independent technical report (“Report”) by Micon International Limited (“Micon”), prepared in accordance with National Instrument 43-101 – Standards of Disclosure for Mineral Projects (“NI 43-101”). This report, authored by Messrs. Charley Murahwi, P.Geo., Pr. Sci. Nat., FAusIMM and Richard Gowans, P.Eng., of Micon, supports Eloro’s planned exploration program at the Iska Iska polymetallic epithermal-porphyry project (“Iska Iska” or the “Project”), in the Potosí Department, southern Bolivia by Minera Tupiza S.R.L., Eloro’s wholly-owned Bolivian subsidiary. The Report will also be posted on the Company’s website, www.elororesources.com. read more