Eloro Resources Announces Robust Initial Inferred Mineral Resource Estimate of 670 million tonnes containing 1.15 Billion In-situ Ounces Silver Equivalent for Iska Iska Project, Potosi Department, Southwestern Bolivia

Total in situ metal estimated to be 298 million ounces Ag, 4.09 million tonnes Zn, 1.74 million tonnes Pb and 130,000 tonnes Sn totalling 1.15 billion ounces silver equivalent. Due to the multi-metal nature of the deposit, the resources are reported using Net Smelter Return (NSR) cut-off values which are as follows: Polymetallic (Zn-Pb-Ag) domain = US$9.20/t for open pit (OP) and US$34.00/t for underground (UG) mining; Tin (Sn-Ag-Pb) domain = US$6.00/t for OP mining. Costs have been significantly reduced due to the major impact of the positive “ore-sorting” tests. Potentially open pittable inferred mineral resource in Polymetallic Domain (Zn-Pb-Ag) of 541 million tonnes at 0.69% Zn, 0.28% Pb and 13.6 g Ag/t for an NSR value of US$20.32/t at a cutoff of US$9.20/t. Includes higher grade near surface inferred mineral resource of 132 million tonnes at 1.11% Zn, 0.50% Pb and 24.3 g Ag/t for an NSR value of US$34.50 at an NSR cutoff of US$25/t. Potentially open pittable inferred mineral resource in the Tin Domain of 110 million tonnes at 0.12% Sn, 0.14% Pb and 14.2 g Ag/t for an NSR value of US$12.22/t at an NSR cutoff of US$6.00 per tonne. Potential underground inferred mineral resource in the Polymetallic Domain of 19 million tonnes at 1.88% Zn, 0.36% Pb and 18.8 g Ag/t with an NSR value of US$42.23 at a cutoff grade of US$34.40. Total inferred mineral resource, 97% of which is potentially open pittable, is 670 million tonnes at an NSR of $19.62. Potential open pit is 1.4km in diameter, extends to a maximum depth of 750m below the Santa Barbara hill and has a stripping ratio of 1:1. Resource estimate is based on 139 diamond drill holes totalling 96,386m. All holes intersected significant reportable mineralization and the deposit is open in all directions.
ELO.V, Eloro, 321gold.com, Bob Moriarty, Bolivia, Iska Iska property,
3D Perspective of the Iska Iska Pit Constrained Resource Showing Distribution of Resource in Major Domains as of August 19, 2023.

Eloro Resources Ltd. (TSX;ELO OTCQX: ELRRF; FSE: P2QM) (“Eloro”, or the “Company”) is pleased to announce the inaugural mineral resource estimate (“MRE”) for the Iska Iska silver-tin polymetallic project in the Potosi Department of southwestern Bolivia. The MRE, as set out in Table 1 below, has been prepared by independent qualified persons (“QPs”) with Micon International Limited as defined under National Instrument 43-101 (“NI-43-101”). A Technical Report outlining the mineral resource estimation will be filed on Sedar within 45 days of the date of this release. read more

Denarius Metals Announces Final Drill Results from Completed Phase 2 In-Fill Drilling at Its Polymetallic Lomero Project in Spain, Including 10.25 Meters Grading 0.27% Copper, 4.79% Lead, 9.82% Zinc, 161 g/t Ag and 6.82 g/t Au

Denarius Silver, DSLV.V, silver, Spain
Cannot view this image? Visit: https://i1.wp.com/images.newsfilecorp.com/files/9396/167847_ee516ed5e4f18b10_001.jpg?w=570&ssl=1

Denarius Metals Corp. (TSXV: DSLV) (OTCQX: DNRSF) (“Denarius Metals” or “the Company”) announced today that it has received the final assays for 42 drill holes, mainly in-fill holes, totaling approximately 13,225 meters, from the Phase 2 surface validation and in-fill drilling program on its polymetallic Lomero Project in southern Spain. To date, Denarius Metals has completed approximately 41,850 meters of drilling in 128 drill holes, including twinning of historical drill holes. The in-fill phase, totaling 23,920 meters and representing 57% of the total drilling program, is now complete. A final 4,000 meters validation drilling campaign, designed to finish verifying the high-grade underground drill holes drilled in the 1980s by Indumetal/Billiton, is in progress. The full drilling results will be incorporated into the geological model and will be integrated in the Mineral Resource Estimate (“MRE”) update to be completed in conjunction with a preliminary economic assessment (“PEA”) in the second half of 2023. read more

Eloro Resources’ drill hole DSB-47 intersects 114g Ag eq/t (9.90g Ag/t, 0.12 g Au/t, 0.96% Zn, and 0.68% Pb) over 320.97m in the Santa Barbara High-Grade Zone, at the Iska Iska Silver-Tin Polymetallic Project, Potosi Department, Bolivia

Holes DSB-50, DSB-51 and DSB-52, the southernmost holes that tested the potential south-southeastern extension of the High-Grade Zone at Santa Barbara, each returned well mineralized intersections over 100m core length as follows: 86.67g Ag eq/t (13.57g Ag/t, 0.99% Zn and 0.41% Pb) over 105.42m including 193.50 g Ag eq/t (15.34g Ag/t, 3.22% Zn and 0.17% Pb) over 10.57m (DSB-50) 103.03g Ag eq/t (5.18g Ag/t, 1.72% Zn and 0.21% Pb) over 143.06m including 175.06 g Ag eq/t (9.39g Ag/t, 2.96% Zn and 0.35% Pb) over 49.87m (DSB-51) 123.28g Ag eq/t (7.46g Ag/t, 0.14 g Au/t, 1.85% Zn and 0.26% Pb) over 119.77m including 306.28 g Ag eq/t (18.03g Ag/t, 0.45g Au/t, 4.55% Zn and 0.47% Pb) over 28.79m (DSB-52) Drill holes in the south-southeastern extension of the Santa Barbara Deposit are notably Zn-rich returning some of the highest Zn values intersected thus far. These three holes expand the strike extent of the Santa Barbara High-Grade Zone to more than 1,100m significantly expanding the potential open pittable resource. The High-Grade zone is now 800m across and is open along strike to the south-southeast.
ELO.V, Eloro, 321gold.com, Bob Moriarty, Bolivia, Iska Iska property,
Geological Plan Map showing Drilling in Santa Barbara Area with Holes referred to in this release highlighted.

 Eloro Resources Ltd. (TSX: ELO; OTCQX: ELRRF; FSE: P2QM) (“Eloro”, or the “Company”) is pleased to announce assay results from the last eight (8) diamond drill holes from the definition drill program at Santa Barbara in the Iska Iska silver-tin polymetallic project in the Potosi Department, southern Bolivia. Two (2) of these drill holes (DSB-45 and DSB-47) filled in gaps in previous drilling of the High-Grade ZoneThe remaining six (6) holes (DSB-44. DSB-48, DSB-49, DSB-50, DSB-51 and DSB-52) tested the potential south-southeastern extension of the High-Grade Zone at Santa Barbara. read more

GR Silver Mining Intersects 44.5 m at 518 g/t AgEq Including 6.5 m at 2,101 g/t AgEq in the Footwall and Hanging Wall of the Main Mineralized Zone at the Plomosas Mine Area

FIGURE 1 Location of Selected 2022 Infill Drill Holes – Plomosas Mine Area Upper Levels Longitudinal Section (CNW Group/GR Silver Mining Ltd.)

GR Silver Mining Ltd. (“GR Silver Mining” or the “Company”) (TSXV: GRSL) (OTCQB: GRSLF) (FRANKFURT: GPE) – is pleased to announce additional results from 38 infill drill holes in the resource update program underway at the Company’s Plomosas Mine Area, Plomosas Project in Sinaloa, Mexico. These drill holes were targeted to replace historical holes used in the 2021 NI 43-101 mineral resource estimate, where unsampled intervals were assigned zero values, or to test new high-grade Ag-Au mineralized zones, identified by the Company in both the footwall and hanging wall of the main mineralized zone (Figure 1). GR Silver Mining’s infill drilling program is continuing in the Plomosas Mine Area, and to date has added 105 holes (7,330 m) of new drilling inside the historic Plomosas Mine since completion of the Company’s 2021 NI 43-101 mineral resource estimation. read more

Eloro Resources Intersects Multiple Intersections including 108.16 g Ag eq/t (11.63 g Ag/t, 1.53% Zn and 0.36% Pb) over 111.26m in High-Grade Feeder Zone in Santa Barbara Target Area at the Iska Iska Silver-Tin Polymetallic Project, Potosi Department, Bolivia

This intersection in hole DSB-36, drilled 400m southeast of the Santa Barbara adit, includes higher-grade portions of: 180.29 g Ag eq/t (24.27 g Ag/t, 2.49% Zn and 0.73% Pb) over 24.13m. 197.54 g Ag eq/t (17.04 g Ag/t, 2.96% Zn and 0.58% Pb) over 11.82m. 211.34 g Ag eq/t (30.50 g Ag/t, 2.87% Zn and 0.76% Pb) over 6.02m. Other significant intersections in this hole include: 101.31 g Ag eq/t (28.14 g Ag/t, 0.19% Zn, 0.55% Pb and 0.26% Cu) over 77.82m. 101.47 g Ag eq/t (23.88 g Ag/t, 1.08% Zn and 0.56% Pb) over 55.54m. 205.75 g Ag eq/t (20.69 g Ag/t, 0.15 g Au/t, 0.68% Zn and 0.75% Pb) over 22.75m. 136.82 g Ag eq/t (3.33 g Ag/t, 0.09 gAu/t, 1.72% Zn, 0.31% Pb and 0.07% Sn) over 78.39m including 478.26 g Ag eq/t (12.60 g Ag/t, 0.27 gAu/t, 5.61% Zn, 0.91% Pb and 0.28% Sn over 10.53m 203.26 g Ag eq/t (1.73 g Ag/t, 0.75% Zn and 0.42% Sn) over 12.22m. The last sample in this 935.4m long hole returned 549.91g Ag eq/t (46.00 g Ag/t, 3.33% Zn, 2.27%Pb and 0.68% Sn) over 1.51m. 52% of this hole contained reportable intersections which collectively averaged 112.48 g Ag eq/t. On-Strike Extension of High Grade Feeder Zone at Santa Barbara to South-Southeast now confirmed for an additional 400m and is open along strike.
ELO.V, Eloro, 321gold.com, Bob Moriarty, Bolivia, Iska Iska property,

Eloro Resources Ltd. (TSX-V: ELO; OTCQX: ELRRF; FSE: P2QM) (“Eloro”, or the “Company”) is pleased to announce assay results from two (2) additional diamond drill holes from its on-going drilling program at the Iska Iska silver-tin polymetallic project in the Potosi Department, southern Bolivia. One drill hole, DSB-36, collared 400m southeast of the Santa Barbara adit, tested the extension of the core of the high-grade feeder zone at Santa Barbara while hole DSB-34, tested the potential southwest limits of the high-grade feeder zone as shown in Figure 1. read more

Eloro Resources Intersects 198.00 g Ag eq/t (67.79 g Ag/t, 1.44% Zn and 1.04% Pb) over 134.47m in Silver-Rich Area of High-Grade Feeder Zone in Santa Barbara Target Area at the Iska Iska Silver-Tin Polymetallic Project, Potosi Department, Bolivia

This intersection in hole DSB-31, drilled 200m southeast of the Santa Barbara adit, includes a higher-grade portion grading 566.36 g Ag eq/t (246.26 g Ag/t, 3.72% Zn and 3.88% Pb) over 25.51m. Additional significant intersections in this hole include: 161.54 g Ag eq/t (32.14 g Ag/t, 1.94% Zn and 0.76% Pb) over 82.12m, 123.24 g Ag eq/t (9.23 g Ag/t, 1.44% Zn, 0.26% Pb and 0.07% Sn) over 62.23m, and 126.21 g Ag eq/t (6.05 g Ag/t, 1.58% Zn and 0.52% Pb) over 81.12m Overall, 51% of the overall length of this 987.99m long hole yielded reportable intersections, which collectively average 139.44 g Ag eq/t. The high-grade silver zone intersected in hole DSB-31 appears to be in the same structural-mineralized corridor as the silver-rich zone in the Santa Barbara adit. As previously reported channel sampling along the adit returned 441.98 g Ag eq/t (164.96 g Ag/t, 0.23 g Au/t, 3.46% Pb and 0.46% Sn) over 165.89m. Adjusted to prices used in this current release, the overall Ag eq/t value is 493.61 g Ag eq/t. Hole DSB-33 drilled at an azimuth of 2250 with a dip of -600 to test the southwest limit of the high-grade feeder zone in the vicinity of the Central Breccia intersected 18 reportable intersections including a very high tin intersection grading 1.41% Sn over 21.25m which included a 9.04m section that graded 3.08% Sn. A total of 26% of this hole contained reportable intersections which collectively averaged 123.39 g Ag eq/t.
ELO.V, Eloro, 321gold.com, Bob Moriarty, Bolivia, Iska Iska property,

 Eloro Resources Ltd. (TSX-V: ELO; OTCQX: ELRRF; FSE: P2QM) (“Eloro”, or the “Company”) is pleased to announce assay results from two (2) additional diamond drill holes from its on-going drilling program at the Iska Iska silver-tin polymetallic project in the Potosi Department, southern Bolivia. One drill hole, DSB-31, tested the potential south-southeastern extension of the high-grade feeder zone at Santa Barbara while the second hole, DSB-33, tested the southwest limit of the zone in the vicinity of the Central Breccia, as shown in Figure 1. read more

Eloro Resources Amends Payment Schedule for Iska Iska Silver-Tin Polymetallic Project, Potosi Department, Bolivia

ELO.V, Eloro, 321gold.com, Bob Moriarty, Bolivia, Iska Iska property,

Eloro Resources Ltd. (TSX-V: ELO; OTCQX: ELRRF; FSE: P2QM) (“Eloro”, or the “Company”) is pleased to announce that, by mutual agreement with Empresa Minera Villegas S.R.L. (“Minera Villegas”), the title holder of the Iska Iska silver-tin polymetallic project in the Potosi Department, southern Bolivia (“Iska Iska”), the payment schedule in connection with the US$10 million payment required for Eloro to earn a 99% interest in Iska Iska has been amended. read more

Eloro Resources Intersects 150.47 g Ag eq/t (9.45 g Ag/t, 1.53% Zn, 0.88% Pb and 0.07% Sn) over 441.21m in High-Grade Feeder Zone in Santa Barbara Target Area at the Iska Iska Silver-Tin Polymetallic Project, Potosi Department, Bolivia

ELO.V, Eloro, 321gold.com, Bob Moriarty, Bolivia, Iska Iska property,
  • This intersection in hole DSB-30 includes a higher-grade portion grading 209.30 g Ag eq/t (10.06 g Ag/t, 2.76% Zn, 0.98% Pb and 0.07% Sn) over 102.30m. This hole has the longest continuously mineralized intersection obtained in drilling thus far.
  • Hole DSB-32, drilled on-section to the southeast with hole DSB-30 intersected 185.94 g Ag eq/t (44.55 g Ag/t, 0.57% Pb, 0.14% Cu and 0.25% Sn) over 135.15m including a higher-grade section of 277.34 g Ag eq/t (78.12 g Ag/t, 0.09 g Au/t, 1.01% Pb, 0.27% Cu and 0.33% Sn) over 66.04m.
  • Hole DSB-29 returned 108.31 g Ag eq/t (14.31 g Ag/t, 0.81% Zn and 0.40% Pb) over 110.40m and hole DSB-28 returned 98.98 g Ag eq/t (4.41 g Ag/t, 1.16% Zn and 0.49% Pb) over 96.51m; all holes testing the high-grade feeder zone.
  • Final underground hole DSBU-11 from the Santa Barbara adit intersected 96.24 g Ag eq/t (14.93 g Ag/t, 0.44% Zn and 0.68% Pb) over 128.33m and 85.85 g Ag eq/t (15.76 g Ag/t, 0.55% Zn, 0.13% Pb and 0.08%Sn) over 174.76m. Hole DSBU-09 intersected 136.48 g Ag eq/t (7.20 g Ag/t, 0.14 g Au/t, 2.47% Zn and 0.63% Pb) over 72.33m and 138.75 g Ag eq/t (13.05 g Ag/t, 0.11 g Au/t, 1.66% Zn and 0.42% Pb) over 72.20m.
  • New downhole geophysical data have significantly extended the strike length of the high-grade feeder zone at Santa Barbara a further 250m along strike to the south-southeast from existing drilling.
  • The 3D inverse magnetic model which correlates very strongly with the conductive zone suggests that the high-grade feeder zone may extend across the entire caldera for as much as a further 1 km along strike for a total potential strike length of at least 2 km. Drilling in the Porco area intersected significant values over short intervals on the edge of this conductive zone.
  • The definition drill program has now been modified to sectionally drill this potential extension with the intention of defining a major open pittable deposit in the valley of the caldera. As a result, the estimated completion date for the maiden National Instrument 43-101 mineral resource has been pushed back to the end of Q1 2023.

TORONTO, Sept. 20, 2022 (GLOBE NEWSWIRE) — Eloro Resources Ltd. (TSX-V: ELO; OTCQX: ELRRF; FSE: P2QM) (“Eloro”, or the “Company”) is pleased to announce assay results from twenty-one (21) diamond drill holes from its on-going drilling program at the Iska Iska silver-tin polymetallic project in the Potosi Department, southern Bolivia. Five (5) surface holes (DSB-28 to DSB-30, DSB-32 and DHK-25) tested the high-grade feeder zone in Santa Barbara which was also tested by two (2) underground holes (DSBU-09 and DSBU-011). Six (6) holes (DSB-16 to DSB-19, DSB-23 and DSB-27) tested the northwest extension of Santa Barbara. Eight (8) holes (DPC-04 to DPC-08 and DPC-10 to DPC-12) are reported for the Porco area. Five surface drills are focused on completing drilling in the Santa Barbara Resource Definition Drilling Area and its extension to the south-southeast. This press release also outlines a major update on the geophysical surveys which have greatly expanded the higher-grade feeder area target zone to the south-southeast. read more

GCM Mining Reports Second Quarter and First Half 2022 Production; Declares August 15, 2022 Monthly Dividend

GCM Mining Corp. (“GCM Mining” or the “Company”) (TSX: GCM, OTCQX: TPRFF) announced today that it produced a total of 16,370 ounces of gold in June 2022 at its Segovia Operations bringing the total for the second quarter of 2022 to 53,198 ounces compared with 52,198 ounces from Segovia in the second quarter of 2021. In the second quarter of 2022, the Company also produced 85,741 ounces of silver, up from 54,573 ounces of silver in the second quarter last year, together with approximately 294,000 pounds of zinc and 345,000 pounds of lead. read more