GR Silver Mining Announces Infill Drilling Results at Plomosas Mine Area – 5.7 m at 514 g/t Ag, including 1.0 m at 1,634 g/t Ag

GR Silver Mining Reports on 2022 Annual General & Special Meeting Results
Figure 1: Location of Selected 2022 Infill Drill Holes – Plomosas Mine Area Upper Levels, Longitudinal Section (CNW Group/GR Silver Mining Ltd.)

GR Silver Mining Ltd. (“GR Silver Mining” or the “Company”) ( TSXV: GRSL) (OTCQB: GRSLF) (FRANKFURT: GPE) – is pleased to announce infill drilling results that make up part of the resource update program in progress at the Plomosas Mine Area, Plomosas Project in Sinaloa, Mexico. These drill holes were targeted by the Company to replace historical holes used in the 2021 NI 43-101 mineral resource estimate, where zero values were assigned, or to test new near-surface and underground high-grade Ag-Au mineralized zones, identified in the recent underground sampling/mapping program. The infill drilling program is continuing in the Plomosas Mine Area through the latter part of 2022, in anticipation of an updated resource estimate in Q1|2023. read more

Tocvan Extends Discovery Trend 125m, Discovers Mineralization 375m from Main Zone in Reconnaissance Drilling at Pilar

CSE:TOC, TocVan Ventures, gold, mexico

Tocvan Ventures Corp. (the “Company”) (CSE:TOC); (OTC:TCVNF); (FSE:TV3), is pleased to announce the latest drill results from its Pilar Au-Ag Project in Sonora, Mexico. Seven drill holes were completed, totalling 1,382-meters. Results for the final four drill holes are highlighted in this release. All four drill holes were drilled in new areas and intersected alteration and structures known to host gold-silver mineralization at Pilar. Hole JES-22-72, 125-meters southeast of drill hole JES-22-63 (13.7m of 0.6 g/t Au and 13 g/t Ag and 9.2m of 0.6 g/t Au) returned 22.9-meters of 0.3 g/t Au and 19 g/t Ag, including 7.6-meters of 0.8 g/t Au and 51 g/t Ag (Figure 1) Three drill holes intersected low-grade gold and silver values indicating close proximity to significant mineralization. Hole JES-22-70 returned 12.2-meters of 0.3 g/t Au, including 3.1-meters of 0.8 g/t Au and 3.1-meters of 0.5 g/t Au. Hole JES-22-69 intersected 1.5-meters of 0.7 g/t Au at the end of hole, leaving it open at depth for targeting. The Company is extremely encouraged by these reconaissaince results and planning is underway for the next stage of drilling at Pilar. read more

GCM Mining Declares September 15, 2022 Monthly Dividend

 GCM Mining Corp. (“GCM Mining” or the “Company”) (TSX: GCM, OTCQX: TPRFF) announced today that its Board of Directors has declared the next monthly dividend of CA$0.015 per common share will be paid on September 15, 2022 to shareholders of record as of the close of business on August 31, 2022. read more

GCM Mining Announces Second Quarter and First Half 2022 Results

GCM Mining Corp. (TSX: GCM; OTCQX: TPRFF) announced today the release of its unaudited interim condensed consolidated financial statements (“Financial Statements”) and accompanying management’s discussion and analysis (MD&A) for the three and six months ended June 30, 2022. All financial figures contained herein are expressed in U.S. dollars (“USD”) unless otherwise noted. Non-GAAP financial performance measures in this press release are identified with “NG”. For a detailed description of each of the non-GAAP measures used in this press release and a detailed reconciliation to the most directly comparable measure under IFRS, please refer to the Company’s MD&A. read more

GR Silver Mining Announces $5 Million Best Efforts Private Placement of Units

GR Silver Mining Ltd. (“GR Silver Mining” or the “Company“) (TSXV: GRSL) (OTCQB: GRSLF) (FRANKFURT: GPE) – is pleased to announce that it has entered into an agreement with Beacon Securities Limited (“Beacon“), on behalf of a syndicate of agents (collectively, the “Agents“), in connection with a “best efforts” private placement of up to 33,334,000 units of the Company (the “Units“) at a price of $0.15 per Unit (the “Issue Price“) for aggregate gross proceeds to the Company of up to $5,000,100 (the “Offering“). Each Unit shall consist of one common share in the capital of the Company (a “Common Share“) and one-half of one common share purchase warrant (each whole warrant, a “Warrant“). Each Warrant will be exercisable to acquire one Common Share for a period of 36 months following the closing of the Offering at an exercise price of $0.22 per Common Share. read more

GCM Mining Announces Second Quarter 2022 Results Webcast

GCM Mining Corp. (“GCM Mining” or the “Company”) (TSX: GCM, OTCQX: TPRFF) announced today that it will release its second quarter and first half 2022 results after market close on Thursday, August 11, 2022 and will host a conference call and webcast on Friday, August 12, 2022 at 9:00 a.m. Eastern Time to discuss the results. read more

GCM Mining and Aris Gold Combine to Create a Leading Americas Gold Producer

Creates a company with larger scale and significant free cash flow to unlock shareholder value Substantial combined gold reserve of 3.8 Moz and resource base of 18.3 Moz Measured & Indicated and 7.7 Moz Inferred1 Strengthened mine-building, operating and financial capacity Streamlined corporate structure with direct realizable synergies No premium, all-share business combination

GCM Mining Corp. (GCM) (TSX: GCM; OTCQX: TPRFF) and Aris Gold Corporation (Aris Gold) (TSX: ARIS; OTCQX: ALLXF) announce they have entered into a definitive agreement (the Arrangement Agreement) under which GCM will acquire all the outstanding Aris Gold shares not already held by GCM (the Transaction). The resulting entity will be named Aris Gold Corporation and will be led by Ian Telfer as Chair and Neil Woodyer as CEO and Director. read more

Tocvan Completes Next Stage of Drilling at Pilar. Reports Over 85% Recovery of Gold from Initial Metallurgical Testing

CSE:TOC, TocVan Ventures, gold, mexico

Tocvan Ventures Corp. (the “Company”) (CSE:TOC); (OTC:TCVNF); (FSE:TV3), is pleased to announce the successful completion of the latest stage of drilling at its Pilar Au-Ag Project in Sonora, Mexico. Seven drill holes were completed, totalling 1,382-meters. Drilling focused on step-out targets along the 4-T and a newly discovered trend between the Main Zone and 4-T (see Figure 1). All seven drill holes intersected target horizons. Results for all seven drill holes have been submitted to ALS (Hermosillo) for analysis, results are pending. read more