Eloro Resources Ltd. (TSX-V: ELO; OTCQX: ELRRF FSE: P2QM) (“Eloro”, or the “Company”) is pleased to provide an update on its Iska Iska silver-tin polymetallic project in Potosi Department, southern Bolivia. To date, the Company has completed 43 diamond drill holes totalling 20,030 metres (m) to test major target areas at Iska Iska. This press release reports drilling results from four (4) additional holes which tested the Santa Barbara Breccia Pipe (“SBBP”) and Central Breccia Pipe (“CBP”). To date, every drill hole that has been assayed has returned multiple reportable mineralized intercepts. Currently three drill rigs are in operation at Iska Iska. One surface drill rig is completing first pass drilling of the CBP from the northern radial platform and a second surface drill is testing the major Porco (South) Target. The third drill, an underground rig, is testing the northeast part of SBBP and its mineralized envelope. Figure 1 is a geological plan map showing locations of drill holes and an updated geological interpretation. Figure 2 is a more detailed geological plan map of the SBBP and CBP areas. Figure 3 is a NW-SE geological section along the northwestern part of the CBP and the eastern part of SBBP showing locations of the main mineralized zone and of drill holes DSB-08, DSB-10 and DCN-2 in this release. Figure 4 shows the currently interpreted metal zoning pattern on this same section. Table 1 provides significant drilling results and Table 2 lists holes completed with assays pending as well as holes in progress in the three major target areas. Highlights are as follows: read more