GR Silver Mining Reports Drill Results Including a High-grade Au-rich Polymetallic Vein from the Plomosas Mine Area

Figure 1: Plomosas Mine Area: Large Epithermal System with New Discoveries (Drone image) (CNW Group/GR Silver Mining Ltd.)

GR Silver Mining Ltd. (TSXV: GRSL) (OTCQB: GRSLF) (FRANKFURT: GPE) (“GR Silver Mining” or the “Company”) – is pleased to report drill results in the northern portion of the Plomosas Mine Area. These results represent intersections of polymetallic (Ag-Au-Pb-Zn) hydrothermal breccia near the surface in unmined areas in the historic Plomosas Mine Area (Figure 1) at the Plomosas Silver Project (“Plomosas Project”) in Sinaloa, Mexico. read more

Eloro Resources Intersects 122.7 g Ag eq/t over 123.6m and 105.4 g Ag eq/t over 173.6m in the Santa Barbara Breccia Pipe at its Iska Iska Silver-Tin Polymetallic Project, Bolivia

ELO.V, Eloro, 321gold.com, Bob Moriarty, Bolivia, Iska Iska property,
Table 1

Eloro Resources Ltd. (TSX-V: ELO; OTCQX: ELRRF FSE: P2QM) (“Eloro”, or the “Company”) is pleased to provide an update on its Iska Iska silver-tin polymetallic project in Potosi Department, southern Bolivia. To date, the Company has completed 33 diamond drill holes totalling 14,346.7 metres (“m”) to test the Huayra Kasa Mine area, Santa Barbara Breccia Pipe (“SBBP”) and Central Breccia Pipe (“CBP”) targets. This press release reports drilling results from hole DSB-07 which tested the SBBP. Currently three drill rigs are in operation at Iska Iska. Two surface drill rigs are testing the Central Breccia from the northern and southern radial setups and one underground drill is testing the target area east of SBBP. Figure 1 is a geological plan map depicting the locations of the drill holes with updated geological interpretation. Figure 2 is a NW-SE longitudinal section along the axis of the 800m long SBBP, showing the location of the main mineralized zone and of Hole DSB-07. Table 1 details significant drilling results and Table 2 lists holes completed with assays pending and holes in progress. Highlights are as follows: read more

GR Silver Mining Reports High-Grade and Wide Silver Mineralization From Drilling in the San Juan Area

Figure 1: San Juan Area: Multiple Veins in a Large Epithermal System (Drone image) (CNW Group/GR Silver Mining Ltd.)
  • 2.0 m @ 954 g/t Ag, 1.3 g/t Au, 1.2 % Pb and 1.6 % Zn (1,177g/t AgEq1)
    including 1.0 m @ 1,184 g/t Ag, 2.3 g/t Au, 1.3 % Pb and 0.9 % Zn (1,486 g/t AgEq)
  • 1.1 m @ 781 g/t Ag, 0.2 g/t Au, 1.5 % Pb and 0.3 % Zn (863 g/t AgEq)
  • 22.3 m @ 62 g/t Ag, 0.3 g/t Au, 0.6 % Pb and 0.4 % Zn (126 g/t AgEq)

GR Silver Mining Ltd. (TSXV: GRSL) (FRANKFURT: GPE) (OTCQB: GRSLF) (“GR Silver Mining” or the “Company”) – is pleased to report drill results that extend the high-grade silver mineralization 100 m to the north along strike in the San Juan Vein. Additionally, a wide, up to 65 m continuous silver mineralized zone, is delineated on the footwall of the Yecora Vein, defining shallow wide mineralized zones to be included in the upcoming maiden resource estimate at San Juan. Both veins are part of the vein system of the San Juan Area of the Plomosas Silver Project (“Plomosas Project”) in Sinaloa, Mexico. read more

Eloro Resources reports 442 grams silver equivalent/tonne (Ag eq/t) over 166m including 1,092 g Ag eq/t (446 g Ag/t, 9.03%Pb and 1.16%Sn) over 56.2m in Continuous Channel Sampling of Santa Barbara Adit, Iska Iska Silver-Tin Polymetallic Project, Potosi Department, Southern Bolivia

ELO.V, Eloro, 321gold.com, Bob Moriarty, Bolivia, Iska Iska property,
Table 1

Eloro Resources Ltd. (TSX-V: ELO; OTCQX: ELRRF FSE: P2QM) (“Eloro”, or the “Company”) is pleased to provide an update on its Iska Iska silver-tin polymetallic project in Potosi Department, southern Bolivia. To date, the Company has completed 28 diamond drill holes totalling 10,677 metres to test the Huayra Kasa Mine area, Santa Barbara Breccia Pipe (“SBBP”) and Central Breccia Pipe (“CBP”) targets. This press release reports further drilling results from five additional holes (DSB-02 to DSB-06) on SBBP and detailed continuous channel sampling in the Santa Barbara adit. Two new holes (DCN-01 and DCN-02) have been completed on the CBP with results pending. Figure 1 is a geological plan map showing locations of the drill holes and updated geological interpretation. Figure 2 is a geological cross section along the axis of the SBBP showing location of the main mineralized zone. Figure 3 is a N-S cross section through the SBBP. Figure 4 is map of the continuous channel sampling at the Santa Barbara adit. Tables 1 gives significant drilling results, Table 2 gives complete continuous channel sampling results for the Santa Barbara Adit and Table 3 lists holes completed with assays pending. Highlights are as follows: read more

GR Silver Mining Drills Wide, High-Grade Silver Mineralization in the Plomosas Mine Area

21.0 m @ 377 g/t Ag, 0.23 g/t Au, 0.7 % Pb and 1.5 % Zn (466 g/t AgEq1) Including:7.0 m @ 633 g/t Ag, 0.20 g/t Au, 0.9 % Pb and 1.5 % Zn (726 g/t AgEq)
Figure 1: Location Map – Longitudinal Section Plomosas Mine Area (CNW Group/GR Silver Mining Ltd.)

GR Silver Mining Ltd. (TSXV: GRSL) (FRANKFURT: GPE) (OTCQB: GRSLF) (“GR Silver Mining” or the “Company”) – is pleased to report results from the Company’s current core drilling program, demonstrating wide intercepts of silver mineralization from underground drilling in the Plomosas Mine Area at the Plomosas Silver Project (“Plomosas Project”) in Sinaloa, Mexico. read more

GR Silver Mining Drills High-Grade Near Surface Mineralization in the San Juan Area at Plomosas:

Figure 1: Location Map – San Juan Area Drilling Locations (CNW Group/GR Silver Mining Ltd.)

5.7 m @ 611 g/t Ag, 0.5 % Pb and 1.7 % Zn (685 g/t AgEq1), including
1.7 m @ 1,762 g/t Ag, 1.3 % Pb and 4.9 % Zn (1,967 g/t AgEq), and including
0.7 m @ 3,755 g/t Ag, 2.5 % Pb and 9.7 % Zn (4,145 g/t AgEq) read more

Eloro Resources Continues to See Long Intercepts of Polymetallic Mineralization at the Santa Barbara Breccia Pipe, Potosi Department, Southern Bolivia

Mineralization in adjacent Central Breccia Pipe appears to have affinity with a tin porphyry
ELO.V, Eloro, 321gold.com, Bob Moriarty, Bolivia, Iska Iska property,

Eloro Resources Ltd. (TSX-V: ELO; OTCQX: ELRRF FSE: P2QM) (“Eloro”, or the “Company”) is pleased to announce further diamond drill results from its Iska Iska Silver-Polymetallic Project in Potosi Department, southern Bolivia. To date, Eloro has completed 22 holes totalling 7,185 metres from both underground (12) and surface drill holes (10). Currently a steeply inclined deep hole, DSB-06, is in progress to test the Santa Barbara Breccia Pipe (“SBBP”) at depth. This release reports results from the last two underground holes (DHK-16 and DHK-17) and the first radial surface hole from SBBP (DSB-01). Results from the first deep radial hole, DSB-02, are delayed for reasons discussed below. read more

GR Silver Mining Reports Underground and Surface Drilling Results in the Plomosas Mine Area

Figure 1: Location Map – 3D Image of the Plomosas Mine Area Drilling Location (CNW Group/GR Silver Mining Ltd.)
  • 8.6 m @ 6.50g/t Au, 79 g/t Ag, 0.7 % Pb, 5.8 % Zn (928 g/t AgEq1)
  • 5.4 m @ 9.06 g/t Au, 76 g/t Ag, 1.5 % Pb, 4.6 % Zn (1,181 g/t AgEq)
  • 0.7 m @ 19.95 g/t Au, 227 g/t Ag, 1.3 % Pb, 4.7 % Zn and 1.0 % Cu (2,507 g/t AgEq)
  • 61.1 m @ 0.4 g/t Au, 30 g/t Ag, 0.9 % Pb, 1.1 % Zn and 0.2 % Cu (144 g/t AgEq)

GR Silver Mining Ltd. (TSXV: GRSL) (FRANKFURT: GPE) (OTCQB: GRSLF) (“GR Silver Mining” or the “Company”) – is pleased to report drill results from the underground and surface drilling program in the Plomosas Mine Area, as well as sampling results from historic drilling, at its 100%-owned Plomosas Silver Project (“Plomosas Project”) in Sinaloa, Mexico. read more

Eloro Resources Intersects 129.6 Grams Silver Equivalent per Tonne over 257.5m in Extensive Silver-Polymetallic Mineralization in Santa Barbara Breccia Pipe, at its Iska Iska Property, Potosi Department, Southern Bolivia

ELO.V, Eloro, 321gold.com, Bob Moriarty, Bolivia, Iska Iska property,

Eloro Resources Ltd. (TSX-V: ELO; OTCQX: ELRRF FSE: P2QM) (“Eloro”, or the “Company”) is pleased to announce additional results from its diamond drilling program at its optioned Iska Iska Silver-Polymetallic Project (“Iska Iska”) in the Potosi Department, southern Bolivia. To date, through its Bolivian subsidiary, Minera Tupiza S.R.L. (“Minera Tupiza”), Eloro has completed 20 holes totalling 5,573m metres from both underground (12) and surface drill holes (8). Results from the first five underground holes were reported on November 18, 2020. This release reports results for 10 additional holes. Due to the polymetallic nature of the deposit, silver equivalent (“Ag eq”) values have been included for comparative purposes. Tables 1 and 2 list significant assay results. Figure 1 is a plan map detailing the locations of the drill holes, Figure 2 is a geological cross section of the Santa Barbara Breccia Pipe and Table 3 provides drill hole collar coordinates for all holes completed to date. read more