Eloro Resources Intersects 239.72 g Ag eq/t (39.58 g Ag/t, 1.04% Pb, 0.26% Cu and 0.20% Sn) over 82.74m in Southern Part of Santa Barbara Target at Iska Iska Silver-Tin Polymetallic Project, Potosi Department, Bolivia

Includes a higher-grade section of 318.15 g Ag eq/t (53.58 g Ag/t, 1.43 % Pb, 0.32 %Cu and 0.27 %Sn) over 51.09m in underground drill hole DSBU-01. 134.47 g Ag eq/t (10.79 g Ag/t, and 0.15 %Sn) over 115.44m including a higher-grade section of 160.87 g Ag eq/t (9.65 g Ag/t, 0.21% Cu, and 0.17 %Sn) over 37.55m in underground hole DSBU-02. Promising results from these holes across a well mineralized width of 200+m opens significant possibilities in the southern extension of the Santa Barbara target area where additional drilling is now planned.
ELO.V, Eloro, 321gold.com, Bob Moriarty, Bolivia, Iska Iska property,

Eloro Resources Ltd. (TSX-V: ELO; OTCQX: ELRRF; FSE: P2QM) (“Eloro”, or the “Company”) is pleased to announce further assay results from seven (7) additional diamond drill holes from its on-going drilling program at the Iska Iska silver-tin polymetallic project in the Potosi Department, southern Bolivia. Two (2) of these holes (DSBU-01 and DSBU-02) are underground holes drilled from the Santa Barbara adit. Three (3) of the holes tested the Central Breccia Pipe (“CBP”) target (DCN-06 and DCN-07 from the Central North radial drilling platform and DCS-04 from the south platform). The final two (2) holes reported in this release tested the Porco Breccia Pipe (“PBP”) target. read more

Eloro Resources Announces Restart of Diamond Drilling and Provides Update on Iska Iska Silver-Tin Polymetallic Project, Potosi Department, Bolivia

ELO.V, Eloro, 321gold.com, Bob Moriarty, Bolivia, Iska Iska property,

Eloro Resources Ltd. (TSX-V: ELO; OTCQX: ELRRF; FSE: P2QM) (“Eloro”, or the “Company”) is pleased to provide an update on its Iska Iska silver-tin polymetallic project in the Potosi Department, southern Bolivia. By the end of 2021, the Company completed 40,468 metres (m) in 73 drill holes at Iska Iska, as shown in Figure 1. Table 1 summarizes drill holes with assays pending. Currently there are two surface drill rigs and one underground drill rig on site. Drilling with all rigs recommenced on January 17, 2022. Highlights of work in progress are as follows: read more

Eloro Intersects 100 Ag eq/t (including 38.71 g Ag/t, 0.88%Zn and 0.51%Pb) over 188.5 m in the Santa Barbara Breccia Pipe at Iska Iska Silver-Tin Polymetallic Project, Potosi Department, Bolivia

Section includes a higher-grade zone of 154 g Ag eq/t (including 75.51 g Ag/t, 0.96% Zn, 0.65% Pb and 0.16% Cu) over 65.8m
ELO.V, Eloro, 321gold.com, Bob Moriarty, Bolivia, Iska Iska property,

Eloro Resources Ltd. (TSX-V: ELO; OTCQX: ELRRF; FSE: P2QM) (“Eloro”, or the “Company”) is pleased to provide an update on its Iska Iska silver-tin polymetallic project in the Potosi Department, southern Bolivia. To date, the Company has completed 34,409 metres (m) in 64 drill holes including three (3) in progress to test major target areas at Iska Iska. This press release reports drilling results from one (1) additional hole which tested the Santa Barbara Breccia Pipe (“SBBP”) (Hole DHK-23) and two holes (DCN-05 and DCS-03) which tested the Central Breccia Pipe target (“CBP”). To date, every drill hole that has been assayed has returned multiple reportable mineralized intercepts. Currently three drill rigs are in operation at Iska Iska. Two surface drill rigs are continuing to drill at SBBP to outline an initial National Instrument 43-101 (“NI-43-101”) compliant resource. A third drill, an underground rig, situated in the west end of the Santa Barbara Adit, is testing the eastern part of SBBP and its mineralized envelope. Figure 1 is a geological plan map showing locations of drill holes and an updated geological interpretation. Table 1 provides significant drilling results with definitions of chemical symbols and Table 2 lists holes completed with assays pending, as well as holes in progress in the three major target areas. Highlights are as follows: read more

Eloro Resources Makes Iska Iska Polymetallic Property Option Payment

ELO.V, Eloro, 321gold.com, Bob Moriarty, Bolivia, Iska Iska property,

Eloro Resources Ltd. (TSX-V: ELO; OTCQX: ELRRF; FSE: P2QM) (“Eloro”, or the “Company”) is pleased to announce that it has advanced US$3 million as property option payments, pursuant to the Private Option Agreement (the “Agreement”) to acquire a 99% interest in the Iska Iska silver-tin polymetallic project (“Iska Iska”) in the Potosi Department, southern Bolivia. The Agreement grants Eloro the option to acquire a 99% interest in Iska Iska for consideration consisting of 500,000 Eloro common shares, of which 250,000 have been issued, with the remaining 250,000 to be issued on or before January 6, 2022, and the payment of US$10 million, of which US$3 million has been paid to date, with the remaining US$7 million due on or before January 6, 2024. read more

Eloro Intersects 234.19g Ag eq/t over 53.20m in the Mineralized Envelope of the Santa Barbara Breccia Pipe at Iska Iska Silver-Tin Polymetallic Project, Potosi Department, Bolivia

Step out drilling northwest of Santa Barbara Breccia Pipe demonstrates room for expansion of the mineralized strike length of the breccia pipe and its surrounding mineralized envelope to over 1.2km Definition drilling in progress to define a maiden NI 43-101 compliant mineral resource within a target block measuring 1,200m along strike, 500m wide and extending to a depth of up to 600m in Santa Barbara Breccia Pipe and its surrounding mineralized envelope
ELO.V, Eloro, 321gold.com, Bob Moriarty, Bolivia, Iska Iska property,

Eloro Resources Ltd. (TSX-V: ELO; OTCQX: ELRRF FSE: P2QM) (“Eloro”, or the “Company”) is pleased to provide an update on its Iska Iska silver-tin polymetallic project in the Potosi Department, southern Bolivia. To date, the Company has completed 58 diamond drill holes totalling 26,982 metres (m) to test major target areas at Iska Iska. This press release reports drilling results from four (4) additional holes which tested the mineralized envelope of the Santa Barbara Breccia Pipe (“SBBP”) (Holes DDHK-19 and DHK-20) and the central-southern part of the Central Breccia Pipe (“CBP”) (Holes DCN-04 and DCS-02). To date, every drill hole that has been assayed has returned multiple reportable mineralized intercepts. Currently three drill rigs are in operation at Iska Iska. Two surface drill rigs are completing drilling at SBBP in order to outline an initial National Instrument 43-101 (“NI-43-101”) compliant resource. A third drill, an underground rig, situated in the west end of the Santa Barbara Adit, is testing the eastern part of SBBP and its mineralized envelope. Figure 1 is a geological plan map showing locations of drill holes and an updated geological interpretation. This map depicts a recently identified robust magnetic anomaly to the northwest of the SBBP where drilling is in progress (see press release June 7, 2021, for an overview of the magnetic results). Figure 2 is a north-south section showing the major potential extension of the SBBP mineralized system. Table 1 provides significant drilling results with definitions of chemical symbols and Table 2 lists holes completed with assays pending as well as holes in progress in the three major target areas. Highlights are as follows: read more

Eloro Resources Provides Update on its La Victoria Silver/Gold Project, Peru

ELO.V, Eloro, 321gold.com, Bob Moriarty, Bolivia, Iska Iska property,

Eloro Resources Ltd. (TSX-V: ELO; OTCQX: ELRRF FSE: P2QM) (“Eloro”, or the “Company”) is pleased to announce that in connection with required permitting for continued exploration at La Victoria, it’s 82%-owned Peruvian subsidiary, Compañia Minera Eloro Peru S.A.C. (“Eloro Peru”), entered into a surface rights agreement (the “Agreement”) with the Pallasca Community in the Pallasca Province, Ancash Department, Peru. The Agreement allows exploration activities, including drilling, to proceed at the San Markito epithermal silver drill target. read more

Ground Magnetic Survey Confirms and Expands Target Areas at Eloro Resources’ Iska Iska Silver-Tin Polymetallic Project, Bolivia

ELO.V, Eloro, 321gold.com, Bob Moriarty, Bolivia, Iska Iska property,
Figure 1

Eloro Resources Ltd. (TSX-V: ELO; OTCQX: ELRRF FSE: P2QM) (“Eloro”, or the “Company”) is pleased to report results from its recently completely magnetics survey on the Company’s Iska Iska silver-tin polymetallic project in Potosi Department, southern Bolivia. A total of 181.5 linekm of magnetic data were collected on 50m spaced north-south lines on all of the accessible parts of the property. read more

Eloro Resources’ First Drill Hole at the Iska Iska Project’s Central Breccia Pipe Encounters Multiple Mineralized Intercepts including 196 Grams Silver Equivalent/tonne (g Ag eq/t) over 56.2m and containing 343 g Ag eq/t (274 g Ag/t, 0.16% Sn and 0.16 g Au/t) over 27.5m

ELO.V, Eloro, 321gold.com, Bob Moriarty, Bolivia, Iska Iska property,
Table 1

Eloro Resources Ltd. (TSX-V: ELO; OTCQX: ELRRF FSE: P2QM) (“Eloro”, or the “Company”) is pleased to provide an update on its Iska Iska silver-tin polymetallic project in Potosi Department, southern Bolivia. To date, the Company has completed 29 diamond drill holes totalling 11,696 metres to test the Huayra Kasa Mine area, Santa Barbara Breccia Pipe (“SBBP”) and Central Breccia Pipe (“CBP”) targets. This press release reports further drilling results from the first drill hole (CDN-01) to test the CBP from the northern radial platform. Figure 1 is a geological plan map showing locations of the drill holes and updated geological interpretation. Figure 2 is a NE-SW geological cross section through the eastern side of the SBBP and the northwest part of the CBP showing location of the main mineralized zone. Table 1 gives significant drilling results and Table 2 lists holes completed with assays pending. Highlights are as follows: read more

Eloro Resources Provides Update on Iska Iska Silver-Tin Polymetallic Project, Potosi Department, Southern Bolivia

ELO.V, Eloro, 321gold.com, Bob Moriarty, Bolivia, Iska Iska property,
Figure 1

Eloro Resources Ltd. (TSX-V: ELO; OTCQX: ELRRF FSE: P2QM) (“Eloro”, or the “Company”) is pleased to provide an update on its Iska Iska silver-tin polymetallic project in Potosi Department, southern Bolivia. To date, the Company has completed 26 diamond drill holes totalling 9,427 metres to test the Huayra Kasa Mine area, Santa Barbara Breccia Pipe (SBBP) and Central Breccia Pipe (CBP) targets. Results have been released for 18 of these holes (see press releases November 18, 2020 (DHK-01 to DHK-05), January 26, 2021 (DHK-06 to DHK-15) and February 23, 2021 (DHK-16, DHK-17 and DSB-01) with results pending for holes completed on SBBP (DSB-2 to DSB-08) and CBP (DCN-01). read more

Eloro Resources Announces the Exercise in Full of the Bought Deal Financing Over-Allotment Option by the Underwriters

ELO.V, Eloro, 321gold.com, Bob Moriarty, Bolivia, Iska Iska property,

Eloro Resources Ltd. (the “Company” or “Eloro”) (TSX-V: ELO; OTCQX: ELRRF; FSE: P2QM) is pleased to announce that, in connection with its previously announced bought deal financing (the “Financing”) (see Eloro press releases dated March 2, 2021, March 3, 2021 and March 8, 2021), and further to the filing of the final short form prospectus on March 18, 2021 with the applicable securities regulators in each of the provinces of Canada, except Quebec, Haywood Securities Inc. and Cantor Fitzgerald Canada Corporation as co-lead underwriters and joint-bookrunners, and Cormark Securities Inc. as co-lead underwriter (collectively, the “Underwriters”), have elected to exercise their over-allotment option (“Over-Allotment Option”) in full. read more