Eloro Intersects 234.19g Ag eq/t over 53.20m in the Mineralized Envelope of the Santa Barbara Breccia Pipe at Iska Iska Silver-Tin Polymetallic Project, Potosi Department, Bolivia

Step out drilling northwest of Santa Barbara Breccia Pipe demonstrates room for expansion of the mineralized strike length of the breccia pipe and its surrounding mineralized envelope to over 1.2km Definition drilling in progress to define a maiden NI 43-101 compliant mineral resource within a target block measuring 1,200m along strike, 500m wide and extending to a depth of up to 600m in Santa Barbara Breccia Pipe and its surrounding mineralized envelope
ELO.V, Eloro, 321gold.com, Bob Moriarty, Bolivia, Iska Iska property,

Eloro Resources Ltd. (TSX-V: ELO; OTCQX: ELRRF FSE: P2QM) (“Eloro”, or the “Company”) is pleased to provide an update on its Iska Iska silver-tin polymetallic project in the Potosi Department, southern Bolivia. To date, the Company has completed 58 diamond drill holes totalling 26,982 metres (m) to test major target areas at Iska Iska. This press release reports drilling results from four (4) additional holes which tested the mineralized envelope of the Santa Barbara Breccia Pipe (“SBBP”) (Holes DDHK-19 and DHK-20) and the central-southern part of the Central Breccia Pipe (“CBP”) (Holes DCN-04 and DCS-02). To date, every drill hole that has been assayed has returned multiple reportable mineralized intercepts. Currently three drill rigs are in operation at Iska Iska. Two surface drill rigs are completing drilling at SBBP in order to outline an initial National Instrument 43-101 (“NI-43-101”) compliant resource. A third drill, an underground rig, situated in the west end of the Santa Barbara Adit, is testing the eastern part of SBBP and its mineralized envelope. Figure 1 is a geological plan map showing locations of drill holes and an updated geological interpretation. This map depicts a recently identified robust magnetic anomaly to the northwest of the SBBP where drilling is in progress (see press release June 7, 2021, for an overview of the magnetic results). Figure 2 is a north-south section showing the major potential extension of the SBBP mineralized system. Table 1 provides significant drilling results with definitions of chemical symbols and Table 2 lists holes completed with assays pending as well as holes in progress in the three major target areas. Highlights are as follows: read more

Cartier Iron Announces Commencement of 10,000 Metre Diamond Drilling Program at Big Easy Low Sulphidation Gold-Silver Project, Newfoundland

CSAMT Survey in progress in Central Anomaly-Big Easy Showing area to outline additional targets for drilling along strike and at depth Cartier Iron completes 100% earn-in on Big Easy property

Cartier Iron Corporation (CSE:CFE) (“Cartier Iron” or the “Company”) is pleased to announce that it has commenced the planned 10,000m diamond drill program at the Big Easy low sulphidation gold-silver project near Clarenville, Newfoundland. Drilling will initially focus on the Central Anomaly where previous drilling (see press release June 8, 2021) confirmed an extensive zone of silicification up to 200m wide with epithermal gold-silver mineralization. This additional drilling will more fully explore this very prospective zone which extends for at least 600m along strike. Table 1 lists initial planned drill holes and Figure 1 shows the location of the chargeability anomaly with planned drill holes. Drilling is also planned to test the chargeability/resistivity anomalies identified on the Sleigh Pond grid in the southern part of the property as outlined in the press release of June 8, 2021, and as shown in Figure 1. The Sleigh Pond program will likely take place in winter 2022. The drilling program is being managed by Mercator Geological Services with drilling being carried out by Logan Drilling Group. read more

GR Silver Mining Announces Completion of Initial Resource Estimates at the Plomosas Project in Sinaloa, Mexico

Figure 1 – Resource Estimation Areas – Plomosas Mine and San Juan Areas(1) (1) New Au-Ag targets of the ongoing Drill Program are shown in black (CNW Group/GR Silver Mining Ltd.)

GR Silver Mining Ltd. (“GR Silver Mining” or the “Company”) (TSXV: GRSL) (OTCQB: GRSLF) (FRANKFURT: GPE) – today announced the delivery of initial NI 43-101 mineral resource estimates on the Company’s Plomosas Project (“Plomosas”), located in Sinaloa, Mexico. read more

Gran Colombia Prices Oversubscribed US$300 Million 6.875% Senior Unsecured Notes Offering

T.GCM, Gran Colombia, gold, Colombia

Gran Colombia Gold Corp. (TSX: GCM; OTCQX: TPRFF) announced today that it has successfully priced an oversubscribed offering of US$300 million in senior unsecured notes due 2026 at a coupon rate of 6.875% (the “2026 Notes”) pursuant to Rule 144A and Regulation S of the U.S. Securities Act of 1933, as amended, (the “Act”), with closing expected to occur on or about August 9, 2021. read more

Tocvan Drills 39.7 meters of 0.96 g/t Au including 12.2 meters of 3 g/t Au in Main Zone Step-Out Also Hits at Triple Vein Zone 400 meters to the East, Opens Up New Target Area

CSE:TOC, TocVan Ventures, gold, mexico

Tocvan Ventures Corp. (CSE:TOC) (CNSX:TOC.CN) (“Tocvan” or the “Corporation”) is pleased to announce final drill results from its Phase II drill program (the “Program”) at the Pilar Gold-Silver Project in Sonora, Mexico. A Phase II drill program was completed in June with over 3,500 meters of reverse circulation (RC) drilling in twenty (20) drill holes. Final results are included in this release, highlighted by drill hole JES-21-50 which returned 39.7 meters at 0.96 g/t Au in a 50 meter step-out to the Main Zone on trend with drill hole JES-21-47 which intersected 47.3 meters at 0.75 g/t Au. In addition, the first reconnaissance drill hole at the Triple Vein Zone (TVZ) was completed 400 meters to the east (JES-21-56) and was successful in intersecting mineralization at depth, returning 1.5 meters at 0.6 g/t Au and 139 g/t Ag. read more

Eloro Intersects 129.65 g Ag eq/t over 300.75m in the Mineralized Envelope of the Santa Barbara Breccia Pipe at the Iska Iska Silver-Tin Polymetallic Project, Potosi Department, Bolivia

ELO.V, Eloro, 321gold.com, Bob Moriarty, Bolivia, Iska Iska property,
Table 1

Eloro Resources Ltd. (TSX-V: ELO; OTCQX: ELRRF FSE: P2QM) (“Eloro”, or the “Company”) is pleased to provide an update on its Iska Iska silver-tin polymetallic project in Potosi Department, southern Bolivia. To date, the Company has completed 46 diamond drill holes totalling 22,398.9 metres (m) to test major target areas at Iska Iska. This press release reports drilling results from four (4) additional holes which tested the mineralized envelope of the Santa Barbara Breccia Pipe (“SBBP”) and the central-southern part of the Central Breccia Pipe (“CBP”). To date, every drill hole that has been assayed has returned multiple reportable mineralized intercepts. Currently three drill rigs are in operation at Iska Iska. One surface drill rig is completing first pass drilling of the major Porco (South) Target. The second surface drill is currently cleaning out drill holes on the SBBP radial platform for the planned downhole induced polarization/resistivity (IP/RES) survey then will be moved to test the gap area between the Central and Porco Breccia Pipes. The third drill, an underground rig, is testing the northeast part of SBBP and its mineralized envelope. This drill will shortly be moved to a new drill bay recently completed on the west end of the Santa Barbara adit. Figure 1 is a geological plan map showing locations of drill holes and an updated geological interpretation. Figure 2 is a more detailed geological plan map of the SBBP and northern CBP areas showing the magnetic low target to the northwest of the SBBP where drilling is planned (see press release June 7, 2021 for an overview of the magnetic results). Table 1 provides significant drilling results and Table 2 lists holes completed with assays pending as well as holes in progress in the three major target areas. Highlights are as follows: read more

Tocvan Drills 15.3 meters of 1.1 g/t Au in New 4-Trench Extension Defines new mineralized trend over a 500 meter strike at Pilar

CSE:TOC, TocVan Ventures, gold, mexico

Tocvan Ventures Corp. (CSE:TOC) (CNSX:TOC.CN) (“Tocvan” or the “Corporation”) is pleased to announce results for the next four drill holes from its Phase II drill program (the “Program”) at the Pilar Gold-Silver Project in Sonora, Mexico. A Phase II drill program was completed in June with over 3,500 meters of reverse circulation (RC) drilling in twenty (20) drill holes. Results for four drill holes from the 4-Trench target area are included in this release, highlighted by drill hole JES-21-53 which returned 15.3 meters at 1.1 g/t Au. The results from 4-Trench have defined a new mineralized trend 500 meters long adjacent to the established Main Zone (Figure 1). Three (3) drill holes from new target areas are pending results. read more

Gran Colombia Gold Announces the Discovery of Two Additional High-Grade Veins at Its El Silencio Mine at Its Segovia Operations

Attachment 1

Gran Colombia Gold Corp. (TSX: GCM, OTCQX: TPRFF) announced today high-grade intercepts from the first 59 diamond drill holes totaling 10,229 meters of an in-fill drilling campaign that is being carried out by the Company’s Mine Geology Department at the El Silencio mine at its Segovia Operations. This 23,000 meters drilling campaign, which commenced in 2020 and will be completed this year, is focused on resource definition within the underground mine developments of the El Silencio mine and complements the previously announced 60,000 meters drilling program being carried out in 2021 by the Company’s exploration team. High-grade intercepts from two new veins recently discovered by this in-fill drilling campaign at the El Silencio mine provide and corroborate information of importance for the current and future development of different sectors of this flagship mine. read more

Tocvan Drills 47.3 meters of 0.75 g/t Au from Surface in Step-out South of the Main Zone Also Drills 7.6 meters of 1.7 g/t Au and 7 g/t Ag at New 4-Trench Extension Target

CSE:TOC, TocVan Ventures, gold, mexico

Tocvan Ventures Corp. (CSE:TOC) (CNSX:TOC.CN) (“Tocvan” or the “Corporation”) is pleased to announce results for the next six drill holes from its Phase II drill program (the “Program”) at the Pilar Gold-Silver Project in Sonora, Mexico. A Phase II drill program has concluded with over 3,500 meters of reverse circulation (RC) drilling in twenty (20) drill holes. Results for six drill holes are included in this release, highlighted by drill hole JES-21-47 which returned 47.3 meters at 0.75 g/t Au and 5 g/t Ag (0.80 g/t AuEq). Seven (7) drill holes from new target areas are pending assay results. read more

GR Silver Mining Reports Wide Gold and Silver Zones from the Final Drill Holes to be Incorporated into the Plomosas Mine Area Resource Estimation

Figure 1: Drone Image – Plomosas Mine Area, Surface Drill Collars and the New Drilling Area known as Plomosas South (CNW Group/GR Silver Mining Ltd.)

 GR Silver Mining Ltd. (TSXV: GRSL) (OTCQB: GRSLF) (FRANKFURT: GPE) (“GR Silver Mining” or the “Company”) – is pleased to report assay results from the final drill holes to be incorporated into the resource estimation at the Plomosas Mine Area at the Plomosas Silver Project (“Plomosas Project”) in Sinaloa, Mexico. These results represent wide intersections of predominantly gold and silver-rich epithermal veining. read more