GR Silver Mining Reports Wide Gold and Silver Zones from the Final Drill Holes to be Incorporated into the Plomosas Mine Area Resource Estimation

Figure 1: Drone Image – Plomosas Mine Area, Surface Drill Collars and the New Drilling Area known as Plomosas South (CNW Group/GR Silver Mining Ltd.)

 GR Silver Mining Ltd. (TSXV: GRSL) (OTCQB: GRSLF) (FRANKFURT: GPE) (“GR Silver Mining” or the “Company”) – is pleased to report assay results from the final drill holes to be incorporated into the resource estimation at the Plomosas Mine Area at the Plomosas Silver Project (“Plomosas Project”) in Sinaloa, Mexico. These results represent wide intersections of predominantly gold and silver-rich epithermal veining. read more

Multiple Holes Yield Silver-Tin Polymetallic Intercepts in the Santa Barbara and Central Breccia Pipes at Eloro Resources’ Iska Iska Project, Bolivia

Hole DSB-08 in the Santa Barbara Breccia Pipe returned 69.89 g Ag eq/t over 252.89m including 196.60 g Ag eq/t with 131.13 g Ag/t over 14.52m Hole DSB-10 returned 29 reportable mineralized intercepts over its entire 1 km length including 114.96 g Ag eq/t over 56.12m and 80.71 g Ag eq/t over 74.39m
ELO.V, Eloro, 321gold.com, Bob Moriarty, Bolivia, Iska Iska property,
Table 1

Eloro Resources Ltd. (TSX-V: ELO; OTCQX: ELRRF FSE: P2QM) (“Eloro”, or the “Company”) is pleased to provide an update on its Iska Iska silver-tin polymetallic project in Potosi Department, southern Bolivia. To date, the Company has completed 43 diamond drill holes totalling 20,030 metres (m) to test major target areas at Iska Iska. This press release reports drilling results from four (4) additional holes which tested the Santa Barbara Breccia Pipe (“SBBP”) and Central Breccia Pipe (“CBP”). To date, every drill hole that has been assayed has returned multiple reportable mineralized intercepts. Currently three drill rigs are in operation at Iska Iska. One surface drill rig is completing first pass drilling of the CBP from the northern radial platform and a second surface drill is testing the major Porco (South) Target. The third drill, an underground rig, is testing the northeast part of SBBP and its mineralized envelope. Figure 1 is a geological plan map showing locations of drill holes and an updated geological interpretation. Figure 2 is a more detailed geological plan map of the SBBP and CBP areas. Figure 3 is a NW-SE geological section along the northwestern part of the CBP and the eastern part of SBBP showing locations of the main mineralized zone and of drill holes DSB-08, DSB-10 and DCN-2 in this release. Figure 4 shows the currently interpreted metal zoning pattern on this same section. Table 1 provides significant drilling results and Table 2 lists holes completed with assays pending as well as holes in progress in the three major target areas. Highlights are as follows: read more

GR Silver Mining Reports Drill Results Including a High-grade Au-rich Polymetallic Vein from the Plomosas Mine Area

Figure 1: Plomosas Mine Area: Large Epithermal System with New Discoveries (Drone image) (CNW Group/GR Silver Mining Ltd.)

GR Silver Mining Ltd. (TSXV: GRSL) (OTCQB: GRSLF) (FRANKFURT: GPE) (“GR Silver Mining” or the “Company”) – is pleased to report drill results in the northern portion of the Plomosas Mine Area. These results represent intersections of polymetallic (Ag-Au-Pb-Zn) hydrothermal breccia near the surface in unmined areas in the historic Plomosas Mine Area (Figure 1) at the Plomosas Silver Project (“Plomosas Project”) in Sinaloa, Mexico. read more

Eloro Resources Intersects 122.7 g Ag eq/t over 123.6m and 105.4 g Ag eq/t over 173.6m in the Santa Barbara Breccia Pipe at its Iska Iska Silver-Tin Polymetallic Project, Bolivia

ELO.V, Eloro, 321gold.com, Bob Moriarty, Bolivia, Iska Iska property,
Table 1

Eloro Resources Ltd. (TSX-V: ELO; OTCQX: ELRRF FSE: P2QM) (“Eloro”, or the “Company”) is pleased to provide an update on its Iska Iska silver-tin polymetallic project in Potosi Department, southern Bolivia. To date, the Company has completed 33 diamond drill holes totalling 14,346.7 metres (“m”) to test the Huayra Kasa Mine area, Santa Barbara Breccia Pipe (“SBBP”) and Central Breccia Pipe (“CBP”) targets. This press release reports drilling results from hole DSB-07 which tested the SBBP. Currently three drill rigs are in operation at Iska Iska. Two surface drill rigs are testing the Central Breccia from the northern and southern radial setups and one underground drill is testing the target area east of SBBP. Figure 1 is a geological plan map depicting the locations of the drill holes with updated geological interpretation. Figure 2 is a NW-SE longitudinal section along the axis of the 800m long SBBP, showing the location of the main mineralized zone and of Hole DSB-07. Table 1 details significant drilling results and Table 2 lists holes completed with assays pending and holes in progress. Highlights are as follows: read more

GR Silver Mining Reports High-Grade and Wide Silver Mineralization From Drilling in the San Juan Area

Figure 1: San Juan Area: Multiple Veins in a Large Epithermal System (Drone image) (CNW Group/GR Silver Mining Ltd.)
  • 2.0 m @ 954 g/t Ag, 1.3 g/t Au, 1.2 % Pb and 1.6 % Zn (1,177g/t AgEq1)
    including 1.0 m @ 1,184 g/t Ag, 2.3 g/t Au, 1.3 % Pb and 0.9 % Zn (1,486 g/t AgEq)
  • 1.1 m @ 781 g/t Ag, 0.2 g/t Au, 1.5 % Pb and 0.3 % Zn (863 g/t AgEq)
  • 22.3 m @ 62 g/t Ag, 0.3 g/t Au, 0.6 % Pb and 0.4 % Zn (126 g/t AgEq)

GR Silver Mining Ltd. (TSXV: GRSL) (FRANKFURT: GPE) (OTCQB: GRSLF) (“GR Silver Mining” or the “Company”) – is pleased to report drill results that extend the high-grade silver mineralization 100 m to the north along strike in the San Juan Vein. Additionally, a wide, up to 65 m continuous silver mineralized zone, is delineated on the footwall of the Yecora Vein, defining shallow wide mineralized zones to be included in the upcoming maiden resource estimate at San Juan. Both veins are part of the vein system of the San Juan Area of the Plomosas Silver Project (“Plomosas Project”) in Sinaloa, Mexico. read more

Eloro Resources reports 442 grams silver equivalent/tonne (Ag eq/t) over 166m including 1,092 g Ag eq/t (446 g Ag/t, 9.03%Pb and 1.16%Sn) over 56.2m in Continuous Channel Sampling of Santa Barbara Adit, Iska Iska Silver-Tin Polymetallic Project, Potosi Department, Southern Bolivia

ELO.V, Eloro, 321gold.com, Bob Moriarty, Bolivia, Iska Iska property,
Table 1

Eloro Resources Ltd. (TSX-V: ELO; OTCQX: ELRRF FSE: P2QM) (“Eloro”, or the “Company”) is pleased to provide an update on its Iska Iska silver-tin polymetallic project in Potosi Department, southern Bolivia. To date, the Company has completed 28 diamond drill holes totalling 10,677 metres to test the Huayra Kasa Mine area, Santa Barbara Breccia Pipe (“SBBP”) and Central Breccia Pipe (“CBP”) targets. This press release reports further drilling results from five additional holes (DSB-02 to DSB-06) on SBBP and detailed continuous channel sampling in the Santa Barbara adit. Two new holes (DCN-01 and DCN-02) have been completed on the CBP with results pending. Figure 1 is a geological plan map showing locations of the drill holes and updated geological interpretation. Figure 2 is a geological cross section along the axis of the SBBP showing location of the main mineralized zone. Figure 3 is a N-S cross section through the SBBP. Figure 4 is map of the continuous channel sampling at the Santa Barbara adit. Tables 1 gives significant drilling results, Table 2 gives complete continuous channel sampling results for the Santa Barbara Adit and Table 3 lists holes completed with assays pending. Highlights are as follows: read more

GR Silver Mining Drills Wide, High-Grade Silver Mineralization in the Plomosas Mine Area

21.0 m @ 377 g/t Ag, 0.23 g/t Au, 0.7 % Pb and 1.5 % Zn (466 g/t AgEq1) Including:7.0 m @ 633 g/t Ag, 0.20 g/t Au, 0.9 % Pb and 1.5 % Zn (726 g/t AgEq)
Figure 1: Location Map – Longitudinal Section Plomosas Mine Area (CNW Group/GR Silver Mining Ltd.)

GR Silver Mining Ltd. (TSXV: GRSL) (FRANKFURT: GPE) (OTCQB: GRSLF) (“GR Silver Mining” or the “Company”) – is pleased to report results from the Company’s current core drilling program, demonstrating wide intercepts of silver mineralization from underground drilling in the Plomosas Mine Area at the Plomosas Silver Project (“Plomosas Project”) in Sinaloa, Mexico. read more

GR Silver Mining Drills High-Grade Near Surface Mineralization in the San Juan Area at Plomosas:

Figure 1: Location Map – San Juan Area Drilling Locations (CNW Group/GR Silver Mining Ltd.)

5.7 m @ 611 g/t Ag, 0.5 % Pb and 1.7 % Zn (685 g/t AgEq1), including
1.7 m @ 1,762 g/t Ag, 1.3 % Pb and 4.9 % Zn (1,967 g/t AgEq), and including
0.7 m @ 3,755 g/t Ag, 2.5 % Pb and 9.7 % Zn (4,145 g/t AgEq) read more

Eloro Resources Continues to See Long Intercepts of Polymetallic Mineralization at the Santa Barbara Breccia Pipe, Potosi Department, Southern Bolivia

Mineralization in adjacent Central Breccia Pipe appears to have affinity with a tin porphyry
ELO.V, Eloro, 321gold.com, Bob Moriarty, Bolivia, Iska Iska property,

Eloro Resources Ltd. (TSX-V: ELO; OTCQX: ELRRF FSE: P2QM) (“Eloro”, or the “Company”) is pleased to announce further diamond drill results from its Iska Iska Silver-Polymetallic Project in Potosi Department, southern Bolivia. To date, Eloro has completed 22 holes totalling 7,185 metres from both underground (12) and surface drill holes (10). Currently a steeply inclined deep hole, DSB-06, is in progress to test the Santa Barbara Breccia Pipe (“SBBP”) at depth. This release reports results from the last two underground holes (DHK-16 and DHK-17) and the first radial surface hole from SBBP (DSB-01). Results from the first deep radial hole, DSB-02, are delayed for reasons discussed below. read more