Eloro Resources Intersects Multiple Intersections including 108.16 g Ag eq/t (11.63 g Ag/t, 1.53% Zn and 0.36% Pb) over 111.26m in High-Grade Feeder Zone in Santa Barbara Target Area at the Iska Iska Silver-Tin Polymetallic Project, Potosi Department, Bolivia

This intersection in hole DSB-36, drilled 400m southeast of the Santa Barbara adit, includes higher-grade portions of: 180.29 g Ag eq/t (24.27 g Ag/t, 2.49% Zn and 0.73% Pb) over 24.13m. 197.54 g Ag eq/t (17.04 g Ag/t, 2.96% Zn and 0.58% Pb) over 11.82m. 211.34 g Ag eq/t (30.50 g Ag/t, 2.87% Zn and 0.76% Pb) over 6.02m. Other significant intersections in this hole include: 101.31 g Ag eq/t (28.14 g Ag/t, 0.19% Zn, 0.55% Pb and 0.26% Cu) over 77.82m. 101.47 g Ag eq/t (23.88 g Ag/t, 1.08% Zn and 0.56% Pb) over 55.54m. 205.75 g Ag eq/t (20.69 g Ag/t, 0.15 g Au/t, 0.68% Zn and 0.75% Pb) over 22.75m. 136.82 g Ag eq/t (3.33 g Ag/t, 0.09 gAu/t, 1.72% Zn, 0.31% Pb and 0.07% Sn) over 78.39m including 478.26 g Ag eq/t (12.60 g Ag/t, 0.27 gAu/t, 5.61% Zn, 0.91% Pb and 0.28% Sn over 10.53m 203.26 g Ag eq/t (1.73 g Ag/t, 0.75% Zn and 0.42% Sn) over 12.22m. The last sample in this 935.4m long hole returned 549.91g Ag eq/t (46.00 g Ag/t, 3.33% Zn, 2.27%Pb and 0.68% Sn) over 1.51m. 52% of this hole contained reportable intersections which collectively averaged 112.48 g Ag eq/t. On-Strike Extension of High Grade Feeder Zone at Santa Barbara to South-Southeast now confirmed for an additional 400m and is open along strike.
ELO.V, Eloro, 321gold.com, Bob Moriarty, Bolivia, Iska Iska property,

Eloro Resources Ltd. (TSX-V: ELO; OTCQX: ELRRF; FSE: P2QM) (“Eloro”, or the “Company”) is pleased to announce assay results from two (2) additional diamond drill holes from its on-going drilling program at the Iska Iska silver-tin polymetallic project in the Potosi Department, southern Bolivia. One drill hole, DSB-36, collared 400m southeast of the Santa Barbara adit, tested the extension of the core of the high-grade feeder zone at Santa Barbara while hole DSB-34, tested the potential southwest limits of the high-grade feeder zone as shown in Figure 1. read more

Eloro Resources Intersects 198.00 g Ag eq/t (67.79 g Ag/t, 1.44% Zn and 1.04% Pb) over 134.47m in Silver-Rich Area of High-Grade Feeder Zone in Santa Barbara Target Area at the Iska Iska Silver-Tin Polymetallic Project, Potosi Department, Bolivia

This intersection in hole DSB-31, drilled 200m southeast of the Santa Barbara adit, includes a higher-grade portion grading 566.36 g Ag eq/t (246.26 g Ag/t, 3.72% Zn and 3.88% Pb) over 25.51m. Additional significant intersections in this hole include: 161.54 g Ag eq/t (32.14 g Ag/t, 1.94% Zn and 0.76% Pb) over 82.12m, 123.24 g Ag eq/t (9.23 g Ag/t, 1.44% Zn, 0.26% Pb and 0.07% Sn) over 62.23m, and 126.21 g Ag eq/t (6.05 g Ag/t, 1.58% Zn and 0.52% Pb) over 81.12m Overall, 51% of the overall length of this 987.99m long hole yielded reportable intersections, which collectively average 139.44 g Ag eq/t. The high-grade silver zone intersected in hole DSB-31 appears to be in the same structural-mineralized corridor as the silver-rich zone in the Santa Barbara adit. As previously reported channel sampling along the adit returned 441.98 g Ag eq/t (164.96 g Ag/t, 0.23 g Au/t, 3.46% Pb and 0.46% Sn) over 165.89m. Adjusted to prices used in this current release, the overall Ag eq/t value is 493.61 g Ag eq/t. Hole DSB-33 drilled at an azimuth of 2250 with a dip of -600 to test the southwest limit of the high-grade feeder zone in the vicinity of the Central Breccia intersected 18 reportable intersections including a very high tin intersection grading 1.41% Sn over 21.25m which included a 9.04m section that graded 3.08% Sn. A total of 26% of this hole contained reportable intersections which collectively averaged 123.39 g Ag eq/t.
ELO.V, Eloro, 321gold.com, Bob Moriarty, Bolivia, Iska Iska property,

 Eloro Resources Ltd. (TSX-V: ELO; OTCQX: ELRRF; FSE: P2QM) (“Eloro”, or the “Company”) is pleased to announce assay results from two (2) additional diamond drill holes from its on-going drilling program at the Iska Iska silver-tin polymetallic project in the Potosi Department, southern Bolivia. One drill hole, DSB-31, tested the potential south-southeastern extension of the high-grade feeder zone at Santa Barbara while the second hole, DSB-33, tested the southwest limit of the zone in the vicinity of the Central Breccia, as shown in Figure 1. read more

Eloro Resources Amends Payment Schedule for Iska Iska Silver-Tin Polymetallic Project, Potosi Department, Bolivia

ELO.V, Eloro, 321gold.com, Bob Moriarty, Bolivia, Iska Iska property,

Eloro Resources Ltd. (TSX-V: ELO; OTCQX: ELRRF; FSE: P2QM) (“Eloro”, or the “Company”) is pleased to announce that, by mutual agreement with Empresa Minera Villegas S.R.L. (“Minera Villegas”), the title holder of the Iska Iska silver-tin polymetallic project in the Potosi Department, southern Bolivia (“Iska Iska”), the payment schedule in connection with the US$10 million payment required for Eloro to earn a 99% interest in Iska Iska has been amended. read more

Eloro Resources Intersects 150.47 g Ag eq/t (9.45 g Ag/t, 1.53% Zn, 0.88% Pb and 0.07% Sn) over 441.21m in High-Grade Feeder Zone in Santa Barbara Target Area at the Iska Iska Silver-Tin Polymetallic Project, Potosi Department, Bolivia

ELO.V, Eloro, 321gold.com, Bob Moriarty, Bolivia, Iska Iska property,
  • This intersection in hole DSB-30 includes a higher-grade portion grading 209.30 g Ag eq/t (10.06 g Ag/t, 2.76% Zn, 0.98% Pb and 0.07% Sn) over 102.30m. This hole has the longest continuously mineralized intersection obtained in drilling thus far.
  • Hole DSB-32, drilled on-section to the southeast with hole DSB-30 intersected 185.94 g Ag eq/t (44.55 g Ag/t, 0.57% Pb, 0.14% Cu and 0.25% Sn) over 135.15m including a higher-grade section of 277.34 g Ag eq/t (78.12 g Ag/t, 0.09 g Au/t, 1.01% Pb, 0.27% Cu and 0.33% Sn) over 66.04m.
  • Hole DSB-29 returned 108.31 g Ag eq/t (14.31 g Ag/t, 0.81% Zn and 0.40% Pb) over 110.40m and hole DSB-28 returned 98.98 g Ag eq/t (4.41 g Ag/t, 1.16% Zn and 0.49% Pb) over 96.51m; all holes testing the high-grade feeder zone.
  • Final underground hole DSBU-11 from the Santa Barbara adit intersected 96.24 g Ag eq/t (14.93 g Ag/t, 0.44% Zn and 0.68% Pb) over 128.33m and 85.85 g Ag eq/t (15.76 g Ag/t, 0.55% Zn, 0.13% Pb and 0.08%Sn) over 174.76m. Hole DSBU-09 intersected 136.48 g Ag eq/t (7.20 g Ag/t, 0.14 g Au/t, 2.47% Zn and 0.63% Pb) over 72.33m and 138.75 g Ag eq/t (13.05 g Ag/t, 0.11 g Au/t, 1.66% Zn and 0.42% Pb) over 72.20m.
  • New downhole geophysical data have significantly extended the strike length of the high-grade feeder zone at Santa Barbara a further 250m along strike to the south-southeast from existing drilling.
  • The 3D inverse magnetic model which correlates very strongly with the conductive zone suggests that the high-grade feeder zone may extend across the entire caldera for as much as a further 1 km along strike for a total potential strike length of at least 2 km. Drilling in the Porco area intersected significant values over short intervals on the edge of this conductive zone.
  • The definition drill program has now been modified to sectionally drill this potential extension with the intention of defining a major open pittable deposit in the valley of the caldera. As a result, the estimated completion date for the maiden National Instrument 43-101 mineral resource has been pushed back to the end of Q1 2023.

TORONTO, Sept. 20, 2022 (GLOBE NEWSWIRE) — Eloro Resources Ltd. (TSX-V: ELO; OTCQX: ELRRF; FSE: P2QM) (“Eloro”, or the “Company”) is pleased to announce assay results from twenty-one (21) diamond drill holes from its on-going drilling program at the Iska Iska silver-tin polymetallic project in the Potosi Department, southern Bolivia. Five (5) surface holes (DSB-28 to DSB-30, DSB-32 and DHK-25) tested the high-grade feeder zone in Santa Barbara which was also tested by two (2) underground holes (DSBU-09 and DSBU-011). Six (6) holes (DSB-16 to DSB-19, DSB-23 and DSB-27) tested the northwest extension of Santa Barbara. Eight (8) holes (DPC-04 to DPC-08 and DPC-10 to DPC-12) are reported for the Porco area. Five surface drills are focused on completing drilling in the Santa Barbara Resource Definition Drilling Area and its extension to the south-southeast. This press release also outlines a major update on the geophysical surveys which have greatly expanded the higher-grade feeder area target zone to the south-southeast. read more

Eloro Resources’ Deep Underground Hole DSBU-10 Intersects 188.64 g Ag eq/t (44.75 g Ag/t, 0.08 g Au/t, 1.05% Zn, 0.76% Pb and 0.14% Sn) over 349.08m in Core of Feeder Zone in the Santa Barbara Target Area at the Iska Iska Silver-Tin Polymetallic Project, Potosi Department, Bolivia

Hole DSBU-10 drilled at azimuth 400 and a dip of -600, is the highest grade, longest intersection thus far at Iska Iska and includes the highest grade Ag to date of 44.75 g Ag/t over 349.08m. Notably, 59% of the overall length of this 878.9m long hole yielded reportable intersections which collectively average 160.14 g Ag eq/t. Hole DHK-24, collared at surface near Huayra Kasa approximately 100m SE of Hole DSBU-10 and drilled to the SW at -600 intersected multiple intersections including 114.62 g Ag/t (17.89 g Ag/t, 0.04 g Au/t, 1.58% Zn, 0.62% Pb and 0.05% Sn) over 112.91m, 84.31 g Ag eq/t (2.61 g Ag/t, 0.10 g Au/t, 1.22% Zn and 0.21% Pb) over 162.48m, 120.0 g Ag eq/t (5.51 g Ag/t, 0.09 g Au/t, 1.71 %Zn and 0.34%Pb) over 65.73m and 110.91 g Ag eq/t (43.67 g Ag/t, 0.07 g Au/t, 0.35% Zn, and 0.10 % Sn) over 177.86m. Notably, 62% of the overall length of this 926.3m long hole yielded reportable intersections which collectively average 110.70 g Ag eq/t. The major feeder zone at Santa Barbara remains open to the southeast where further drilling is now in progress. Note that metal prices for the Ag equivalent calculation have been updated to reflect current metal prices.
ELO.V, Eloro, 321gold.com, Bob Moriarty, Bolivia, Iska Iska property,

Eloro Resources Ltd. (TSX-V: ELO; OTCQX: ELRRF; FSE: P2QM) (“Eloro”, or the “Company”) is pleased to announce assay results from two (2) additional diamond drill holes from its on-going drilling program at the Iska Iska silver-tin polymetallic project in the Potosi Department, southern Bolivia. Hole DSBU-10 is an underground hole drilled at azimuth 40at -600 dip across the higher-grade feeder zone. Hole DHK-24 is a surface drill hole collared near Huayra Kasa approximately 100m SE of Hole DSBU-10 and drilled to the SW at -600. Four drills including three surface drills and one underground drill are focussed on completing drilling in the Santa Barbara Resource Definition Drilling Area. A fourth surface drill has been added to further expand drilling capacity. read more

GCM Mining Reports Second Quarter and First Half 2022 Production; Declares August 15, 2022 Monthly Dividend

GCM Mining Corp. (“GCM Mining” or the “Company”) (TSX: GCM, OTCQX: TPRFF) announced today that it produced a total of 16,370 ounces of gold in June 2022 at its Segovia Operations bringing the total for the second quarter of 2022 to 53,198 ounces compared with 52,198 ounces from Segovia in the second quarter of 2021. In the second quarter of 2022, the Company also produced 85,741 ounces of silver, up from 54,573 ounces of silver in the second quarter last year, together with approximately 294,000 pounds of zinc and 345,000 pounds of lead. read more

GCM Mining Announces May 2022 Production; Declares July 15, 2022 Monthly Dividend

GCM Mining Corp. (“GCM Mining” or the “Company”) (TSX: GCM, OTCQX: TPRFF) announced today that its Segovia Operations produced 18,507 ounces of gold in May 2022, up from 17,936 ounces of gold in May last year. This brings the total gold production for the first five months of 2022 to 86,779 ounces, up from 84,467 ounces in the first five months last year. Segovia’s trailing 12-months’ total gold production at the end of May 2022 was 208,701 ounces, up about 1% over 2021. Expansion of the Company’s processing plant at Segovia to 2,000 tonnes per day (“tpd”) is nearing completion and is expected to be finished in July. The Company is on track to meet its annual production guidance for 2022 of between 210,000 and 225,000 ounces of gold. read more

Eloro Resources Provides Update on the Preliminary Metallurgical Testwork Program for the Iska Iska Silver-Tin Polymetallic Project, Potosi Department, Bolivia

ELO.V, Eloro, 321gold.com, Bob Moriarty, Bolivia, Iska Iska property,

Eloro Resources Ltd. (TSX-V: ELO; OTCQX: ELRRF; FSE: P2QM) (“Eloro”, or the “Company”) is pleased to provide an update on its preliminary metallurgical testwork program for the Iska Iska silver-tin polymetallic project in the Potosi Department, southern Bolivia. The work program including testwork for development of a preliminary metallurgical flowsheet and preliminary mineralogical characterization, is being carried out by Blue Coast Research Ltd. (“Blue Coast”) based in Parksville, BC. The objective is to develop the preliminary flotation flowsheet to maximize lead, zinc and precious metals into saleable concentrates in the Santa Barbara polymetallic deposit and to develop a preliminary flowsheet for tin in both the Santa Barbara and the deeper tin-dominant mineralization. read more

Eloro Resources Intersects 160.00 g Ag eq/t (27.37g Ag/t, 0.62% Zn, 0.52% Pb and 0.11% Sn) over 251.87m and 133.45 g Ag eq/t (19.10g Ag/t, 0.20 g Au/t, 0.42% Zn, 0.64% Pb and 0.08% Sn) over 289.45m in the Santa Barbara Target area at the Iska Iska Silver-Tin Polymetallic Project, Potosi Department, Bolivia

These new drill results combined with previously released drill results for the underground drilling are defining a potential major feeder structure for the Ag-Sn polymetallic mineralization in the Santa Barbara Adit area. Bore Hole Induced Polarization (BHIP) surveys to a depth of almost 1,000m indicates that the conductivity increases with depth indicating that this potential feeder zone could be substantive.
ELO.V, Eloro, 321gold.com, Bob Moriarty, Bolivia, Iska Iska property,

Eloro Resources Ltd. (TSX-V: ELO; OTCQX: ELRRF; FSE: P2QM) (“Eloro”, or the “Company”) is pleased to announce assay results from an additional four (4) diamond drill holes from its on-going drilling program at the Iska Iska silver-tin polymetallic project in the Potosi Department, southern Bolivia. Holes DSBU-08, DSBU-07 and DSBU-04 are underground holes drilled from the Santa Barbara adit to test the southwestern and southern extension of the higher-grade mineralized zone. Surface drill hole DSB-26 tested the northwest extension of the Santa Barbara mineralized zone approximately 800m northwest of the Santa Barbara adit underground drill bay. Drilling is currently focussed primarily on the Santa Barbara Resource Definition Drilling Area with two surface drills and one underground drill. One surface drill is completing holes in the Porco area to test for a potential tin porphyry as suggested by the 3D inverse magnetic model (see Eloro press release dated March 1, 2022). read more

GR Silver Continues to Deliver Wide, High-grade Drill Results at Plomosas: 6.5 m at 1,458 g/t Ag Including 0.9 m at 3,118 g/t Ag in PLIP22-013

Figure 1: Longitudinal Section Plomosas Mine Infill Drilling Results – Ag Block Model (CNW Group/GR Silver Mining Ltd.)

GR Silver Mining Ltd. (“GR Silver Mining” or the “Company”) (TSXV: GRSL) (OTCQB: GRSLF) (FRANKFURT: GPE) – announces high-grade silver (Ag) results from underground infill drilling at the Plomosas Project in Sinaloa State, Mexico. The results continue to support the potential to increase Ag grades in the Plomosas Mine Area resource. The drilling targeted high grade Ag mineralization in the upper levels of the underground workings, in areas where unsampled intervals from historical drill holes within the 2021 resource block model were previously assigned zero values. read more