NexGen Announces Doubling of Contracted Sales Volumes with 5 Million Pound Uranium Offtake Contract with Major US Utility

Contracted volumes double to more than 10 million pounds. Market related pricing mechanisms providing the most significant leverage to future prices at time of delivery. Ongoing negotiations with multiple entities for additional offtake contracts.
uranium

NexGen Energy Ltd. (TSX: NXE) (NYSE: NXE) (ASX: NXG) (“NexGen” or the “Company”) is pleased to announce it has secured a new uranium offtake contract with another major US based utility for the delivery of 1 million pounds of uranium per year over a five-year period. Commencing in the first year of commercial production, this latest uranium sales agreement follows the Company’s first sales contracts announced in December 2024 (link NR December 4, 2024). This contract reflects the significant materiality of NexGen’s Rook I Project in the future supply of uranium at a time when sovereign and technical risk surrounding current production sources is at unprecedented levels worldwide. read more

Cartier Provides Update on its Chorrillos Project, Southern Bolivia

Cartier Silver Corporation (CSE: CFE) (“Cartier Silver” or the “Company”) is pleased to report that through its Bolivian subsidiary, Minera Cartier Bolivia S.R.L. (“Cartier Bolivia”), it has acquired 50% of the capital quotas (the “Acquisition”) of Empresa Minera Gonalbert S.R.L. and Empresa Minera Segovia S.R.L. (the “Vendors”), who are the registered title holders of two separate properties, the Gonalbert Mining Area and Felicidad Mining Area, both part of the Company’s Chorrillos Project, located in Southern Bolivia. read more

NexGen Announces Final 2024 and New 2025 Assay Results at Rapidly Growing Patterson Corridor East (PCE)

New assays from RK-25-227 return 12.0 m at 3.46% U3O8, including 2.5 m at 14.9% U3O8 and 0.5 m at 31.0% U3O8. All 2024 assays received Completed assays adding to the best intercepts previously disclosed in holes RK-25-232 (15.0 m at 15.9% U3O8 including 3.0 m at 47.8% U3O8, 1.5 m at 29.4% U3O8 and 0.5 m at 68.8% U3O8) and RK-24-222 (17.0 m at 3.85% U3O8).
uranium
Cannot view this image? Visit: https://i0.wp.com/images.newsfilecorp.com/files/1745/260470_b8322aaf644a6a43_002.jpg?w=570&ssl=1

NexGen Energy Ltd. (TSX: NXE) (NYSE: NXE) (ASX: NXG) (“NexGen” or the “Company”) is pleased to announce additional exciting 2024 and winter 2025 assay results from exploration at Patterson Corridor East (“PCE”). Assays from 2024 are now fully received (Table 1). read more

NexGen Solidifies 100% Ownership of Its Entire Land Package

NexGen acquires Rio Tinto’s 10% production carried interest over 39 NexGen-owned mineral claims in the Southwest Athabasca Basin, including those hosting the Patterson Corridor East (PCE) discovery. NexGen now owns exclusively 100% of its entire portfolio of Projects and Properties which include Rook I (location of Arrow and PCE deposits), SW1 and SW3.
uranium
Cannot view this image? Visit: https://i2.wp.com/images.newsfilecorp.com/files/1745/259907_527a291084257965_002.jpg?w=570&ssl=1

NexGen Energy Ltd. (TSX: NXE) (NYSE: NXE) (ASX: NXG) (“NexGen” or the “Company”) is pleased to announce it has exercised its Right of First Refusal to acquire the 10% production carried interest (PCI) held by Rio Tinto Exploration Canada Inc. (Rio Tinto) over 39 of NexGen’s mineral claims in the Southwest Athabasca Basin, including those hosting the PCE discovery (Figure 1). NexGen’s entire portfolio including the Arrow deposit is now 100% owned (Figure 2). Concurrent with its exercise, NexGen has agreed to match a cash payment offered to Rio Tinto for the interest, the terms of which are contractually confidential. read more

Eloro Resources Makes a US$1.5 Million Option Payment for the Iska Iska Silver-Tin Polymetallic Project, Potosi Department, Bolivia

ELO.V, Eloro, 321gold.com, Bob Moriarty, Bolivia, Iska Iska property,

Eloro Resources Ltd. (TSX: ELO; OTCQX: ELRRF; FSE: P2QM) (“Eloro”, or the “Company”) is pleased to announce that it made a US$1,500,000 option payment to Empresa Minera Villegas S.R.L. (“Minera Villegas”), the title holder of the Iska Iska silver-tin polymetallic project in the Potosi Department, southern Bolivia (“Iska Iska”), leaving a final cash payment of US$1,150,000 due on January 6, 2026. read more

Eloro Resources Amends Payment Schedule for Iska Iska Silver-Tin Polymetallic Project, Potosi Department, Bolivia

V.ELO, Eloro Resources, Peru, gold, Tom Larsen

Eloro Resources Ltd. (TSX: ELO; OTCQX: ELRRF; FSE: P2QM) (“Eloro”, or the “Company”) is pleased to announce that, by mutual agreement with Empresa Minera Villegas S.R.L. (“Minera Villegas”), the title holder of the Iska Iska silver-tin polymetallic project in the Potosi Department, southern Bolivia (“Iska Iska”), the payment schedule in connection with the US$4,450,000 remaining portion of the aggregate US$10,000,000 payment required for Eloro to earn a 100% interest in Iska Iska has been amended, as follows: read more

NexGen Announces Voting Results for Election of Directors and Appoints Sharon Birkett to Its Board of Directors

uranium

NexGen Energy Ltd. (TSX: NXE) (NYSE: NXE) (ASX: NXG) (“NexGen” or the “Company”) is pleased to announce the voting results for the election of the Company’s Board of Directors and the appointment of Sharon Birkett to the Company at its annual general and special meeting of shareholders held on June 17, 2025 (the “Meeting“). read more

NexGen Releases 2024 Sustainability Report

uranium
info

NexGen Energy Ltd. (TSX: NXE) (NYSE: NXE) (ASX: NXG) (“NexGen” or the “Company”) is proud to announce the release of its 2024 Sustainability Report (“the Report”) that covers the period January 1, 2024, to December 31, 2024. The Report marks the fifth year that NexGen has reported on the Company’s robust Environmental, Social, and Governance profile. In addition to reporting in accordance with the Global Reporting Initiative (“GRI”) Standards, the Report demonstrates alignment with the Task Force of Climate-related Financial Disclosures (“TCFD”). read more

NexGen Announces Regulatory Approval of 2025 Site Program at Rook I Property

2025 Program includes a temporary exploration airstrip, expansion of exploration camp facilities and site access road improvements. Patterson Corridor East (“PCE”) discovery is expanding rapidly and the 2025 Program will optimize this growth. Incorporating NexGen’s longstanding approach, the 2025 Program will prioritize and maximize local business opportunities.
uranium
info

NexGen Energy Ltd.  (TSX: NXE) (NYSE: NXE) (ASX: NXG) (“NexGen” or the “Company”) is pleased to announce that the Saskatchewan Ministry of Environment has granted approval for NexGen’s 2025 Site Program (the “Program”) at its 100%-owned Rook I Property in the Athabasca Basin, Saskatchewan. The Program includes the establishment of a temporary exploration airstrip, expansion of the exploration accommodation camp facilities by 373 beds and site access road improvements. read more