Eloro Resources Ltd. (TSX: ELO; OTCQX: ELRRF; FSE: P2QM) (“Eloro”, or the “Company”) is pleased to announce further assay results from two (2) additional drillholes (DSB-91 and DSB-92) of the second phase definition diamond drilling program at the Company’s Iska Iska Project, Potosi Department, Southern Bolivia. Both holes are in the Silver-Zinc-Polymetallic Domain in the potential Santa Barbara starter pit area. These results further expand the footprint of this domain and indicate that the deposit continues to be open to the east (see Figure 1). The current phase of the definition drilling phase has concluded with a total of 8,286.40m of diamond drilling in sixteen (16) holes completed. A total of 7,346.90m was completed in the fourteen (14) reported holes, with assay results pending for two remaining holes totaling 939.50m in length. read more