Grid Metals Corp. Reports 1.13% Li2O over 10.7 m

Completes Resource Drilling at Donner Lake
Nickel, Manitoba, Grid Metals, GRDM.V
Grid Metals Corp., Wednesday, May 31, 2023, Press release picture
Table 1: Assay Results of the 2023 drilling at the Northwest Dyke – Donner Lake Lithium Project

 Grid Metals Corp. (TSXV:GRDM)(OTCQB:MSMGF) (the “Company”) is pleased to announce final drill results from the completion of the Northwest Dyke drill program at the Donner Lake Lithium Property in Manitoba, Canada. The Company has now received all assays from the winter drilling program which will be incorporated into the upcoming maiden resource estimate expected before the end of Q2/23. SGS Canada has been retained by the Company to complete the estimate which will include both the Main and Northwest Dykes. read more

Clean Air Metals Files Audited Annual Financial Statements for the Year Ended January 31, 2023

Clean Air Metals Inc. (“Clean Air Metals” or the “Company“) (TSXV: AIR) (FRA: CKU) (OTCQB: CLRMF) announces that it has filed its audited consolidated financial statements and management’s discussion and analysis for the year ended January 31, 2023, available for viewing on www.sedar.com. read more

Cartier Files on SEDAR the NI 43-101 Technical Report of the Preliminary Economic Assessment for Chimo Mine Project Post-Tax NPV5% of CAD$388M and 20.8% IRR

Long term gold price of US$1,750/oz, Exchange rate of CAD $1.00 = US$0.77 Post-tax NPV5% of CAD$388M and IRR of 20.8% Post-tax payback period of 2.9 years and mine life of 9.7 years Capex of CAD$341M Average all-in sustaining cost of US$755/oz Average annual production of 116,900 oz 4,500 tpd underground operation Average sorted grade of 4.55 g/t Au for mill feed Processing plant with capacity of 3,000 tpd and rate of recovery of 93.1% Sorting of mineralization increases the grade of material prior to milling operations and recovery rate and also reduces costs of mill construction, material handling, milling and restoration leading to a reduced environmental footprint of mine tailings and thus increasing the social acceptability of the project
Cartier Resources

Cartier Resources Inc. (TSX-V: ECR) (“Cartier”) announces that it has filed on SEDAR the NI 43-101 technical report of the Preliminary Economic Assessment (“PEA”) titled “NI 43-101 Technical Report and Preliminary Economic Assessment for the Chimo Mine and West Nordeau Gold Deposits, Chimo Mine and East Cadillac Properties, Quebec, Canada”, prepared in accordance with National Instrument 43-101 – Standard of Disclosure for Mineral Projects (“NI 43-101”). read more

Denarius Metals Announces Final Drill Results from Completed Phase 2 In-Fill Drilling at Its Polymetallic Lomero Project in Spain, Including 10.25 Meters Grading 0.27% Copper, 4.79% Lead, 9.82% Zinc, 161 g/t Ag and 6.82 g/t Au

Denarius Silver, DSLV.V, silver, Spain
Cannot view this image? Visit: https://i1.wp.com/images.newsfilecorp.com/files/9396/167847_ee516ed5e4f18b10_001.jpg?w=570&ssl=1

Denarius Metals Corp. (TSXV: DSLV) (OTCQX: DNRSF) (“Denarius Metals” or “the Company”) announced today that it has received the final assays for 42 drill holes, mainly in-fill holes, totaling approximately 13,225 meters, from the Phase 2 surface validation and in-fill drilling program on its polymetallic Lomero Project in southern Spain. To date, Denarius Metals has completed approximately 41,850 meters of drilling in 128 drill holes, including twinning of historical drill holes. The in-fill phase, totaling 23,920 meters and representing 57% of the total drilling program, is now complete. A final 4,000 meters validation drilling campaign, designed to finish verifying the high-grade underground drill holes drilled in the 1980s by Indumetal/Billiton, is in progress. The full drilling results will be incorporated into the geological model and will be integrated in the Mineral Resource Estimate (“MRE”) update to be completed in conjunction with a preliminary economic assessment (“PEA”) in the second half of 2023. read more

NexGen Announces Provincial Approval and Commencement of 2023 Site Infrastructure and Confirmation Program: Enhancing Safety and Creating Jobs for Local Communities

T.NXE, NexGen, uranium

NexGen Energy Ltd. (“NexGen” or the “Company”) (TSX: NXE) (NYSE: NXE) (ASX: NXG) is pleased to announce the Saskatchewan Ministry of Environment has approved the commencement of the 2023 Site Infrastructure and Confirmation Program (“SI&CP”) at the Company’s 100% owned, Rook I project (the “Project”), in the Athabasca Basin, Saskatchewan. The SI&CP comprises a comprehensive field program focused on infrastructure upgrades to support increased activity and continued engineering data confirmation for the Project. read more

Cartier Silver Files NI 43-101 Technical Report by Micon for the Los Chorrillos (Gonalbert-Felizidad) Silver Project, Tupiza, Potosi Department, Southern Bolivia

Cartier Silver Corporation (CSE:CFE) (“Cartier Silver” or the “Company”) is pleased to announce that the Company has filed on SEDAR an independent technical report (“Technical Report”) by Micon International Limited (“Micon”), prepared in accordance with National Instrument 43-101 – Standards of Disclosure for Mineral Projects (“NI 43-101“). This Technical Report, authored by Mr. Charley Murahwi, P.Geo., Pr. Sci. Nat., FAusIMM, of Micon, supports Cartier Silver’s planned exploration program at the Los Chorrillos (Gonalbert-Felizidad) Silver Project (“Los Chorrillos” or the “Project”), in the Potosí Department, southern Bolivia by Minera Cartier Bolivia S.R.L., Cartier Silver’s Bolivian subsidiary. The Technical Report will also be posted on the Company’s website, www.cartiersilvercorp.com. read more

Cartier Files Early Warning Report in Respect of Earthwise Minerals Corp.

Cartier Resources

Cartier Resources Inc. (TSX.V: ECR) (“Cartier” or the “Corporation”) announces that it has filed an early warning report in respect of its holdings in Earthwise Minerals Corp. (“Earthwise”). The requirement to file this report was triggered by the receipt, on May 4, 2023, of 1,600,000 common shares of Earthwise (the “Consideration Shares”) issued to Cartier under the terms of an option agreement dated April 22, 2021, as amended, between Earthwise and Cartier (the “Option Agreement”). The Consideration Shares were issued at a deemed price of $0.08 per share in satisfaction of the scheduled share issuance required to be made by Earthwise under the terms of the Option Agreement (the “Share Issuance Payment”) and will be subject to a contractual release period, as follows: (a) July 22, 2023: 25%; (b) October 22, 2023: 25%; (c) January 22, 2024: 25%; and (d) April 22, 2024: 25%. read more

Clean Air Metals Announces the New SLR Mineral Resource Estimate for the Thunder Bay North Critical Metals Project with an Indicated Resource of 14.0 million tonnes containing 1.2 million ounces of 2PGE (Pt+Pd) 57,500 tonnes of Cu and 34,300 tonnes of Ni

Clean Air Metals Inc. (“Clean Air Metals” or the “Company“) (TSXV: AIR) (OTCQB: CLRMF) (FRA: CKU) is pleased to announce that further to its disclosure of February 15, 2023, the Company has completed an updated Indicated and Inferred Mineral Resource estimate disclosed in accordance with National Instrument 43-101 (“NI 43-101″) for the Company’s 100%-owned Thunder Bay North Critical Metals Project (the “Project“). read more