Eloro Resources Intersects 239.72 g Ag eq/t (39.58 g Ag/t, 1.04% Pb, 0.26% Cu and 0.20% Sn) over 82.74m in Southern Part of Santa Barbara Target at Iska Iska Silver-Tin Polymetallic Project, Potosi Department, Bolivia

Includes a higher-grade section of 318.15 g Ag eq/t (53.58 g Ag/t, 1.43 % Pb, 0.32 %Cu and 0.27 %Sn) over 51.09m in underground drill hole DSBU-01. 134.47 g Ag eq/t (10.79 g Ag/t, and 0.15 %Sn) over 115.44m including a higher-grade section of 160.87 g Ag eq/t (9.65 g Ag/t, 0.21% Cu, and 0.17 %Sn) over 37.55m in underground hole DSBU-02. Promising results from these holes across a well mineralized width of 200+m opens significant possibilities in the southern extension of the Santa Barbara target area where additional drilling is now planned.
ELO.V, Eloro, 321gold.com, Bob Moriarty, Bolivia, Iska Iska property,

Eloro Resources Ltd. (TSX-V: ELO; OTCQX: ELRRF; FSE: P2QM) (“Eloro”, or the “Company”) is pleased to announce further assay results from seven (7) additional diamond drill holes from its on-going drilling program at the Iska Iska silver-tin polymetallic project in the Potosi Department, southern Bolivia. Two (2) of these holes (DSBU-01 and DSBU-02) are underground holes drilled from the Santa Barbara adit. Three (3) of the holes tested the Central Breccia Pipe (“CBP”) target (DCN-06 and DCN-07 from the Central North radial drilling platform and DCS-04 from the south platform). The final two (2) holes reported in this release tested the Porco Breccia Pipe (“PBP”) target. read more

GR Silver Mining Underground Drill Results Deliver Wide and High-grade Intervals, 38 m at 299 g/t Ag, Including 1,091 g/t Ag over 2.1 m and 1,002 g/t Ag over 3.5 m, Confirming Potential for Resource Expansion at San Marcial Area

Figure 1: Longitudinal section displaying “Ag Grade x Thickness” contours of the San Marcial NI 43-101 resource model and new extensions to the mineralized body down dip and along strike (CNW Group/GR Silver Mining Ltd.)

 GR Silver Mining Ltd. (“GR Silver Mining” or the “Company”) (TSXV: GRSL) (OTCQB: GRSLF) (FRANKFURT: GPE) – is pleased to announce additional high-grade silver (Ag) results confirming consistently wide Ag intercepts from underground diamond core drilling at the San Marcial resource expansion program, at the Plomosas Project, Sinaloa, Mexico. These assay results are from the fourth hole of an eight-hole program and indicate the widening of the mineral body at depth and along strike. The successful drill hole confirms a significant expansion of high-grade Ag mineralization approximately 170 m down dip below the lower limit of the San Marcial NI 43-101 mineral resource and approximately 70 m along strike, to the SE of hole SMI21-03 (see News Release dated January 17, 2022) (Figure 1). read more

GCM Mining Reports Fourth Quarter and Full Year 2021 Production; Meets Annual Guidance for Sixth Consecutive Year

GCM Mining Corp. (“GCM Mining” or the “Company”) (TSX: GCM, OTCQX: TPRFF) announced today that it produced a total of 18,030 ounces of gold in December 2021 at its Segovia Operations bringing the total for the fourth quarter of 2021 to 55,285 ounces compared with 50,084 ounces from Segovia in the fourth quarter of 2020. In the fourth quarter of 2021, the Company also produced 89,327 ounces of silver at Segovia, up from 51,302 ounces of silver in the fourth quarter last year, together with approximately 154,000 pounds of zinc and 254,000 pounds of lead. For the full year, Segovia’s gold and silver production in 2021 totalled 206,389 ounces and 253,597 ounces, respectively, up from 196,362 ounces of gold and 186,122 ounces of silver in 2020. Including Marmato production up to February 4, 2021, consolidated gold production for 2021 was 208,775 ounces compared with 220,194 ounces in 2020, which included 23,832 ounces from Marmato. read more

Tocvan Channel Samples 19.8 meters of 0.73 g/t Au and 19.5 meters of 0.61 g/t Au, Releases Trench Program Results

CSE:TOC, TocVan Ventures, gold, mexico

Tocvan Ventures Corp. (the “Company”) (CSE:TOC) (CNSX:TOC.CN) (OTCQB:TCVNF) (WKN:TV3/A2PE64), is pleased to announce trench results from its Pilar Au-Ag Project in Sonora, Mexico. A total of four trenches were completed in December, 2021 totalling 80 meters length. All four trenches intersected mineralization with two trenches yielding consistent mineralization across the entire length of the trench. T-21-2, intersected 19.5 meters of 0.61 g/t Au across the entire length of the trench in an area along the developing 4-Trench Trend. T-21-3, yielded 19.8 meters of 0.73 g/t Au and was targeted to provide key geochemical information across the Main Zone where mineralization outcrops at surface. Initial bulk-sample material from T-21-3 will be submitted to SGS Laboratories in Durango, Mexico and used for column leach studies. Follow-up metallurgical studies will utilize the surface material extracted from the other three trenches. read more

GR Silver Mining Confirms Wide, High-grade Silver Mineralization Below the San Marcial Resource, 18.5 m @ 773 g/t Ag, including 1,792 g/t Ag over 5.6 m

V.GRSL, GR Silver Mining, silver, gold, Mexico
Figure 1: San Marcial NI 43-101 resource model and extension (CNW Group/GR Silver Mining Ltd.)

GR Silver Mining Ltd. (“GR Silver Mining” or the “Company”) (TSXV: GRSL) (OTCQB: GRSLF) (FRANKFURT: GPE) – is pleased to announce wide, high-grade silver (Ag) results from diamond core drilling from the recently expanded underground tunnel in the San Marcial Area, at the Plomosas Project, Sinaloa, Mexico. These assay results are from the initial three holes of an eight-hole program and confirm extensions of high-grade Ag mineralization along strike, as well as up to 170 m down dip, below the San Marcial NI 43-101 mineral resource. The successful results extend the mineralization from the initial 250 m to approximately 420 m down dip from surface. These results also suggest that the compilation of modern and historical data, combined with advanced geological modelling, has been successful in targeting higher grade mineralization on the project. read more

GCM Mining Declares Monthly Dividend to Be Paid on February 15, 2022

GCM Mining Corp. (“GCM Mining” or the “Company”) (TSX: GCM, OTCQX: TPRFF) announced today that its Board of Directors has declared the next monthly dividend of CA$0.015 per common share will be paid on February 15, 2022 to shareholders of record as of the close of business on January 31, 2022. read more

Tocvan Announces Change to Executive Management Team, Transitions Leadership Towards Development Focus

CSE:TOC, TocVan Ventures, gold, mexico

Tocvan Ventures Corp. (the “Company”) (CSE:TOC) (CNSX:TOC.CN) (OTC:TCVNF) (WKN:TV3/A2PE64), announces strategic changes to executive management as it proactively looks towards the advancement of its core gold-silver assets in Sonora, Mexico. Mr. Brodie A. Sutherland, VP Exploration will replace co-founder, Mr. Derek A. Wood as President, CEO and Corporate Secretary. Mr. Wood will remain a director and strategic advisor of the Company. The changes will better align with technical and professional expertise required as projects advance towards development. read more

Bayhorse Completes New Milling Facility and Restarts Milling Operations at the Bayhorse Silver Mine, Oregon, USA

V.BHS, Bayhorse Silver, silver, Oregon

Bayhorse Silver Inc. (TSXV: BHS) (OTCQB: BHSIF) (FSE: 7KXN) (the “Company” or “Bayhorse”) announces that the Company’s mining and mill teams have completed the new upgraded mill facility, Payette, Idaho, that is now ready for operations in slightly more than 90 days from the issuance of the building permit to house the facility. read more

GCM Mining Files National Instrument 43-101 Technical Report for Its Toroparu Project in Guyana

GCM Mining Corp. (“GCM Mining” or the “Company”) (TSX: GCM, OTCQX: TPRFF) announced today that it has filed a technical report and preliminary economic assessment (the “Technical Report”) pursuant to National Instrument 43‐101 – Standards of Disclosure for Mineral Projects (“NI 43‐101″) for its Toroparu Gold Project located in the Upper Puruni River Region of Western Guyana. The Technical Report dated January 11, 2022, with an effective date of December 1, 2021, supports the disclosure made by the Company in its December 1, 2021 news release and was prepared by Nordmin Engineering Ltd. The Technical Report is based on the updated Mineral Resource estimate for the Toroparu Gold Project with an effective date of November 1, 2021. read more