Eloro Resources Ltd. (TSX: ELO; OTCQX: ELRRF; FSE: P2QM) (“Eloro”, or the “Company”) is pleased to announce that in connection with the annual and special meeting of the Company`s shareholders (the “Meeting”), that was held virtually on September 30, 2024, and in accordance with TSX reporting requirements, the following voting results were obtained.read more
Eloro Resources Ltd. (“Eloro” or the “Company”) (TSX: ELO; OTCQX: ELRRF; FSE: P2QM) is pleased to announce it has received a lead order from the Company’s largest shareholder and strategic investor, Crescat Capital LLC, in connection with a non-brokered private placement offering (the “Offering”) of up to 3,000,000 units of the Company at $0.90 per unit (the “Units”) for gross proceeds of up to $2,700,000.read more
Updated modelling of the potential starter pit area at Santa Barbara indicates that areas with higher-grade mineralization typically have much better drilling density, whereas holes outside the core area are too widely spaced to give an accurate grade estimate. This increased drilling density is particularly important for defining the extent of the high-grade Ag-bearing and Sn-bearing structures, and for categorizing the mineral resources from inferred to indicated, which have a major influence on overall grade and resources that will contribute to the preliminary economic assessment (“PEA”). An initial program of 5,700m of diamond drilling in 13 holes in the Santa Barbara starter pit area is planned to better define the vertical and lateral extent of high-grade Ag mineralization; fill-in gaps that are presently categorized as low-grade or waste in the resource model but are very likely mineralized; expand the higher-grade Sn mineralization to the west; and complete an additional 1,400m in two large size PQ holes for further metallurgical testing. Drill pads are expected to be completed by mid-September for start up of this initial diamond drilling program. The Santa Barbara Adit and area will be of particular interest and focus, where previous systematic continuous channel sampling along the adit returned average grades of 164.96 g Ag/t, 0.46%Sn, 3.46% Pb and 0.14% Cu over 166m including 446 g Ag/t, 9.03% Pb and 1.16% Sn over 56.19m. Once this initial 7,100m drilling program is completed, an additional 7,000m drilling program is planned in the polymetallic Ag-Zn-Pb and Sn-Ag domains to produce an independent updated mineral resource estimate (“MRE”) which will be reported and incorporated into the PEA. The Eloro team continue to look for opportunities to process tin zones for recovery of cassiterite either after cessation of the aforementioned Ag-Zn-Pb project by adding a tin plant onto the existing flotation plant infrastructure already installed or construction of a stand-alone tin plant. A silver rich bi-product is envisaged from processing the tin-silver domain that would be commercialized separately. The tin–silver sulphide domain will be metallurgically tested so it can be included in the PEA study. A conceptual scoping study has been initiated that will identify the potential for developing an underground ramp into the core of the Santa Barbara zone, with the following objectives: Extract systematic bulk and channel samples to confirm grade and continuity of mineralization especially for Ag and Sn Generate samples for external laboratory bulk metallurgical test work Potentially leading to a small pre-concentration plant to generate additional metallurgical data on this important stage in the process and permit pre-concentrated “ore” that could be treated at Empresa Minera Villegas SRL’s lead-zinc-silver differential flotation plant located 15 km from Iska Iska for the production of silver-rich lead and zinc concentrates. This would potentially provide a source of short-term income to help support the capital and operating costs of this initiative. It would also demonstrate the technical viability of the pre-concentration plant unit processes in readiness for the 35,000 tonnes per day bulk tonnage open pit mine model envisioned for the PEA. Detailed geological and engineering work to further assess the ground-water quality, contamination risks, predicting geologic hazards, characterizing mineral resources and their extraction costs, producing geotechnical information, waste repository siting and general education. Provide access for targeted underground diamond drilling to further upgrade the mineral resource
Eloro Resources Ltd. (TSX: ELO; OTCQX: ELRRF; FSE: P2QM) (“Eloro: or the “Company”) is pleased to provide an update on Eloro’s Iska Iska silver-tin polymetallic project in Potosi Department, southern Bolivia.read more
NexGen Energy Ltd. (“NexGen” or the “Company”) (TSX: NXE) (NYSE: NXE) (ASX: NXG) is pleased to announce the mineralized zone at Patterson Corridor East (PCE) has materially expanded since the original discovery in the 2024 Winter Program (see NexGen News Release dated March 11, 2024). The Summer Drill Program commenced May 21st, with eight (8) out of twelve (12) drillholes intersecting mineralization to date (Figures 1 and 2, Table 1). Extensive mineralization plunges to the east with a span of 540 m along strike and 600 m vertical extent, showing wide intervals of elevated radioactivity that remain open at depth and along strike. In comparison, previously reported holes from PCE had identified two mineralized holes, 275 m apart.read more
Updated modelling of the potential starter pit area at Santa Barbara zone highlights the importance of completing additional drilling to better define the grade and extent of the mineral resource in this area. Areas with higher-grade resource typically have much better drilling density but holes outside the core potential pit area are too widely spaced to give an accurate estimate of grade. Substantive progress has been made on the preliminary economic evaluation (“PEA”) which is focussing on the Ag-Zn-Pb-Sn mineralization. The preliminary optioneering study has shown that a 12 million tpa mining operation appears the most attractive option based upon XRT “Ore” Sorting and/or Dense Media Separation which effectively doubles the grade feeding the milling and flotation circuit and which is also likely to enhance downstream metal recoveries. Reduced pre-concentrated tonnage results in reduction of all downstream capital and operating costs associated with milling, froth flotation and wet tailings storage facility (“TSF”). The inclusion of this pre-concentration stage in the flowsheet, has allowed Eloro to find optimum pre-concentration scenarios to suit the grades required for downstream processing. Further studies have helped define local costs for the PEA study. The high chargeability anomaly in the southeast that extended the mineralized structural corridor at Iska Iska 600m further to the southeast for an overall strike length of at least 2km is a high priority target with excellent potential to outline a second starter pit area. This anomaly is stronger than the anomaly over the high grade resource in the potential starter pit area of Santa Barbara.
Eloro Resources Ltd. (TSX: ELO; OTCQX: ELRRF; FSE: P2QM) (“Eloro: or the “Company”) is pleased to provide an update on Eloro’s Iska Iska silver-tin polymetallic project in Potosi Department, southern Bolivia.read more
Eloro Resources Ltd. (TSX: ELO; OTCQX: ELRRF; FSE: P2QM) (“Eloro”, or the “Company”) is pleased to announce, in collaboration with the Canadian Bolivian Chamber of Commerce, the release of “Viva Tupiza! Viva Bolivia!” a short documentary produced and filmed in Bolivia in the Tupiza area where Eloro’s Iska Iska silver-tin polymetallic project is located.read more
NexGen Energy Ltd. (“NexGen” or the “Company”) (TSX: NXE) (NYSE: NXE) (ASX: NXG) is pleased to announce that on June 21, 2024 the Canadian Nuclear Safety Commission (“CNSC“) concluded their 30-day completeness check of NexGen’s May 21, 2024 submission of responses to the remaining 49 technical review comments and revised Federal Environmental Impact Statement (“EIS“) for NexGen’s 100% owned Rook I Project (“Rook I” or the “Project“).read more
NexGen Energy Ltd. (“NexGen” or the “Company”) (TSX: NXE) (NYSE: NXE) (ASX: NXG) is pleased to announce the appointment of Susannah Pierce to the Company Board to Directors following the Company’s 2024 Annual General Meeting that took place Monday, June 17th, 2024.read more
NexGen Energy Ltd. (“NexGen” or the “Company”) (TSX: NXE) (NYSE: NXE) (ASX: NXG) is pleased to announce drilling at Patterson Corridor East (“PCE“) has intersected mineralization in RK-24-193 over 67.5 metres (m) (383.5 to 451 m) across various intervals including up to 7,500 cps over 1.5 m (Figures 1 to 4, Table 1). RK-24-193 is located 275 m southwest along strike of RK-24-183 (discovery hole) and at approximately the same depth below surface.read more
NexGen Energy Ltd. (“NexGen” or the “Company”) (TSX: NXE) (NYSE: NXE) (ASX: NXG) is pleased to announce the release of its 2023 Sustainability Report (“the Report”) that covers the period January 1, 2023 to December 31, 2023. The Report marks the fourth year that NexGen has reported on the Company’s robust Environmental, Social, and Governance (ESG) profile, and is again in accordance with the Global Reporting Initiative (GRI) Standards.read more