Golden Predator Advances Reopening of the Brewery Creek Mine

Golden Predator, V.GPY, gold, Yukon, Bill Sheriff

Golden Predator Mining Corp. (TSX.V:GPY, OTCQX:NTGSF) (the “Company” or “Golden Predator”) announced today that it has commenced site improvements and an accelerated exploration/development drilling program at its fully licensed 100%-owned Brewery Creek Mine near Dawson City, Yukon.  Site development work is underway following the receipt of formal notification from the Yukon Government  confirming the validity of the current Quartz Mining License and Water License which permits the immediate start of work to reactivate the Brewery Creek Mine. The 2019 exploration drilling program will test numerous targets across the property with the objective of expanding and upgrading the existing mineral resource. read more

NexGen Completes Phase I of Feasibility-Stage Drill Program Intersecting High Grade Mineralization and Preliminarily Assessed Robust Geotechnical and Hydrogeological Conditions in all Areas of Arrow

T.NXE, NexGen, uranium
Figure 1: Arrow Deposit Drill Hole Locations (CNW Group/NexGen Energy Ltd.)

NexGen Energy Ltd. (“NexGen” or the “Company”) (TSX: NXE, NYSE MKT: NXE) is pleased to report radioactivity results for an additional thirty-seven holes comprising 16,585.5 m from the Company’s Feasibility-stage drilling program at our 100% owned, Rook I property in the Athabasca Basin Saskatchewan. The Phase I resource component of the 2019 Feasibility stage program has completed 117 holes totaling 50,968 m.  Utilizing new directional drilling technology, AziDrill, the Company was able to reduce the metres required for Phase I conversion by 28% due to the ability to target mineralization more accurately with deeper directional cuts from the pilot hole. read more