NexGen Announces Resignation of Chief Financial Officer

T.NXE, NexGen, uranium

NexGen Energy Ltd. (“NexGen” or the “Company”) (TSX: NXE, NYSE MKT: NXE) announces that Bruce Sprague has tendered his resignation as Chief Financial Officer effective November 29, 2019.  Leigh Curyer, Chief Executive Officer, the Board and all whom worked with Bruce at NexGen would like to thank him for his contributions and efforts. Bruce joined NexGen in November 2017 from Ernst & Young.  Over the course of the last two years Bruce has supported NexGen in its transition.  He played a significant role in progressing the Government Relations and Sustainability strategies as the Company is advancing final feasibility and permitting. read more

NexGen Commences Maiden Exploration Drilling on Prospective SW1 Property

T.NXE, NexGen, uranium
Figure 1: SW1 Property and Rook I Property with Similar Geophysical Signatures (CNW Group/NexGen Energy Ltd.)

NexGen Energy Ltd. (“NexGen” or the “Company”) (TSX: NXE, NYSE MKT: NXE) is pleased to announce that an exploration drill program consisting of a minimum 4,000 m is scheduled to begin in early September at our 100% owned, SW1 property (approximately 10 km northwest of Rook I), in the Athabasca Basin, Saskatchewan. read more

NexGen Completes Phase I of Feasibility-Stage Drill Program Intersecting High Grade Mineralization and Preliminarily Assessed Robust Geotechnical and Hydrogeological Conditions in all Areas of Arrow

T.NXE, NexGen, uranium
Figure 1: Arrow Deposit Drill Hole Locations (CNW Group/NexGen Energy Ltd.)

NexGen Energy Ltd. (“NexGen” or the “Company”) (TSX: NXE, NYSE MKT: NXE) is pleased to report radioactivity results for an additional thirty-seven holes comprising 16,585.5 m from the Company’s Feasibility-stage drilling program at our 100% owned, Rook I property in the Athabasca Basin Saskatchewan. The Phase I resource component of the 2019 Feasibility stage program has completed 117 holes totaling 50,968 m.  Utilizing new directional drilling technology, AziDrill, the Company was able to reduce the metres required for Phase I conversion by 28% due to the ability to target mineralization more accurately with deeper directional cuts from the pilot hole. read more

NexGen Intersects High-Grade Mineralization in all Twenty A2 and A3 Targets from the 2019 Feasibility Stage Drilling Program

T.NXE, NexGen, uranium
Figure 1: Arrow Deposit Drill Hole Locations (CNW Group/NexGen Energy Ltd.)

NexGen Energy Ltd. (“NexGen” or the “Company”) (TSX: NXE, NYSE MKT: NXE) is pleased to report radioactivity for an additional twenty holes comprising 7,969.5 m from the Company’s Feasibility stage drilling program at our 100% owned, Rook I property in the Athabasca Basin Saskatchewan. read more

NexGen Intersects Continuous and Strong High-Grade Mineralization in all of the Initial A2 Sub-Zone Targets from Feasibility Stage Drilling

T.NXE, NexGen, uranium
Figure 1: Arrow and South Arrow Drill Hole Locations (CNW Group/NexGen Energy Ltd.)

NexGen Energy Ltd. (“NexGen” or the “Company”) (TSX: NXE, NYSE MKT: NXE) is pleased to report radioactivity results for the first twenty holes comprising 8,216.5 m from the Company’s first phase of Feasibility-stage drilling program at our 100% owned, Rook I property in the Athabasca Basin Saskatchewan. read more

NexGen Announces Appointment of Brad Wall, the Former Premier of Saskatchewan, to its Board of Directors

T.NXE, NexGen, uranium

NexGen Energy Ltd. (“NexGen” or the “Company”) (TSX:NXE, NYSE MKT:NXE) is pleased to announce the appointment of former Saskatchewan Premier Mr. Brad Wall to the Company’s Board of Directors. This appointment coincides with the retirement from the NexGen Board of Craig Parry, Chief Executive Officer of IsoEnergy and founding member of the Board of Directors at NexGen, who is moving onto the Technical Advisory Committee. read more

NexGen Commences 125,000 m Feasibility Stage Drilling Program and Technical Studies at the Arrow Deposit

T.NXE, NexGen, uranium
Figure 1: Focus of Objective 1 and 2 Drilling (CNW Group/NexGen Energy Ltd.)

NexGen Energy Ltd. (“NexGen” or the “Company”) (TSX: NXE, NYSE MKT: NXE) is pleased to announce that the largest drill program in the Company’s history focused on optimizing mine development has begun at our 100% owned, Rook I property, in the Athabasca Basin, Saskatchewan. The drill program results will be incorporated into a NI43-101 Bankable Feasibility Study (“FS” or the “Study”), building on the successful outcomes highlighted in the Company’s Pre-Feasibility Study (“PFS”) (see News Release dated November 5, 2018) which demonstrated the Arrow Project to be an exceptional development opportunity for NexGen, Saskatchewan and Canada. read more

NexGen Releases Project Development-Focused Summer 2018 Drilling Results

T.NXE, NexGen, uranium
Figure 1: Arrow Deposit Drilling Locations (CNW Group/NexGen Energy Ltd.)

NexGen Energy Ltd. (“NexGen” or the “Company”) (TSX: NXE, NYSE MKT: NXE) is pleased to report geotechnical and radioactivity results for twenty-nine holes comprising 20,482.31 m on the Company’s 100% owned Rook I property, in the Athabasca Basin, Saskatchewan. The primary objective of the program was the geotechnical characterization of areas within Arrow’s footwall, lateral development and potential underground infrastructure locations of which results were incorporated into the Pre-Feasibility Study (“PFS”) released on November 5th, 2018. The exploration results of this release which encountered strong mineralized intervals in key areas were not incorporated into the updated Mineral Resource Estimate and PFS results, released on November 5, 2018. read more