Eloro: District Scale in Bolivia

Interesting press release today from Eloro (V.ELO). They have staked 9 additional properties in the Potosí Department, southern Bolivia where Iska Iska, their flagship Bolivian property is located.
Interesting press release today from Eloro (V.ELO). They have staked 9 additional properties in the Potosí Department, southern Bolivia where Iska Iska, their flagship Bolivian property is located.
Eloro Resources Ltd. (TSX-V: ELO; OTCQX: ELRRF; FSE: P2QM) (“Eloro”, or the “Company”) is pleased to announce that Minera Tupiza S.R.L., Eloro’s Bolivian subsidiary has staked nine (9) additional properties (known as “Mining Areas” under Bolivian law) covering a total of 311.75 square kilometres in the Potosí Department, southern Bolivia where Iska Iska is located as shown in Figure 1. The geological characteristics and target mineralization of these properties are summarized in Table 1. Figure 2 shows the regional geology in the area of the new properties. The properties are located on prominent ASTER (Advanced Spaceborne Thermal Emission and Reflection Radiometer) anomalies with a similar hydrothermal alteration signature to that of Iska Iska. The Tup-5 property ties directly onto the Iska Iska property.
Tocvan Ventures Corp. (CSE:TOC) (CNSX:TOC.CN) (“Tocvan” or the “Corporation”) is pleased to announce several key observations and conclusions from recent technical studies focused on the identification of a Phase 1 program of drill-hole targets at the Pilar Gold-Silver Project in Sonora, Mexico.
VANCOUVER, BC, Sept. 28, 2020 /CNW/ – GR Silver Mining Ltd. (TSXV: GRSL), (FRANKFURT: GPE), (OTCQB: GRSLF) (“GR Silver Mining” or the “Company”) – is pleased to announce that wide, high-grade polymetallic (Au-Cu-Ag-Pb-Zn), disseminated and massive sulphide-rich mineralization has been discovered during initial underground channel sampling on the lower level of the Plomosas Mine (Figure 1), at its 100%-owned Plomosas Silver Project (“Plomosas Project”) in Sinaloa, Mexico.
GR Silver Mining Ltd. (TSXV: GRSL) (FRANKFURT: GPE) (OTCQB: GRSLF) (“GR Silver Mining” or the “Company”) – is pleased to announce drill results from the Company’s recently announced surface core drilling program in the Plomosas Mine Area as well as results from the ongoing validation of historic drilling at its 100%-owned Plomosas Silver Project (“Plomosas Project”) in Sinaloa, Mexico.
Tocvan Ventures Corp. (CSE: “TOC“) (CNSX:TOC.CN) (“Tocvan” or the “Corporation”) is pleased to announce the initiation of drill permitting, and the initiation of controlled source audio-magnetotellurics (CSAMT).
Tocvan Ventures Corp. (CSE: “TOC”) (CNSX:TOC.CN) (“Tocvan” or the “Corporation”) is pleased to announce the grant of 500,000 stock options to directors, officers, consultants, and employees pursuant to the terms and conditions of the Corporation’s stock option plan. The stock options are exercisable at $0.35 per share and shall expire 5 years from the date of grant.
GR Silver Mining Ltd. (TSXV: GRSL) (FRANKFURT: GPE) (OTCQB: GRSLF) (“GR Silver Mining” or the “Company”) – reports the results of its annual general meeting of shareholders held on September 11, 2020 in Vancouver, British Columbia. All the motions presented to the shareholders were approved. Each of the six nominees proposed as Directors and listed in the Company’s Management Information Circular dated August 7, 2020 were elected as Directors.
GR Silver Mining Ltd. (TSXV: GRSL) (FRANKFURT: GPE) (OTCQB: GRSLF) (“GR Silver Mining” or the “Company”) – will hold its annual general meeting (the “Meeting“) of shareholders of the Company (“Shareholders“) on September 11, 2020 at 10:00 a.m. (PST). Electronic copies of all materials related to the Meeting can be found on the Company’s profile on the System for Electronic Document Analysis and Retrieval (“SEDAR”).
Eloro Resources Ltd. (TSX-V: ELO; FSE: P2Q) (“Eloro”, or the “Company”) is pleased to announce that its Bolivian subsidiary Minera Tupiza S.R.L. has completed the three (3) underground drill bays in the Huayra Kasa Mine required for the planned 3,500m underground diamond drilling program on its optioned Iska Iska Polymetallic Project in Potosi Department, southern Bolivia. The Company and contractor Empresa Minera Villegas S.R.L. have implemented safeguards to protect personnel from COVID-19. Minera Tupiza S.R.L. has received clearance from the Government of Bolivia for travel to Tupiza. Drilling will be carried out by Leduc Drilling S.R.L. and is expected to commence in early September. All workings will be systematically geologically mapped and channel sampled prior to commencement of the drill program.