Eloro Resources Files Updated NI 43-101 Technical Report on Iska Iska Project

Eloro Resources Also Announces Filing of Final Base Shelf Prospectus
ELO.V, Eloro, 321gold.com, Bob Moriarty, Bolivia, Iska Iska property,

Eloro Resources Ltd. (the “Company” or “Eloro”) (TSX-V: ELO; OTCQX: ELRRF; FSE: P2QM) is pleased to announce that it has filed on SEDAR an updated technical report (“Technical Report”) on the Company’s Iska Iska silver-tin polymetallic project, prepared by Micon International Limited (“Micon”) and in accordance with National Instrument 43-101. read more

Eloro Resources Intersects 169.11 g Ag eq/t (64.30 g Ag/t, 0.96% Zn, 0.37% Pb and 0.07% Sn) over 235.55m to further Expand Higher Grade area to the North in the Eastern Part of the Santa Barbara Target at the Iska Iska Silver-Tin Polymetallic Project, Potosi Department, Bolivia

Includes a higher-grade section in this underground hole DSBU-06 (Azimuth 00 and dip -650) of 314.52 g Ag eq/t (192.18g Ag/t, 0.22 g Au/t, 0.07% Zn, 0.41% Pb, and 0.11% Sn) over 50.68m and an additional intersection of 110.57 g Ag eq/t (17.38 g Ag/t, 0.09 g Au/t, 0.30% Zn, 0.21% Pb and 0.11%Sn) over 128.44m further down the hole. Overall, for DSBU-06, 86% of this 599.8m long hole had reportable intersections, which collectively average 129.70 g Ag eq/t. Underground hole DSBU-05 on the same due north section as DSBU-06, but shallower at -400, intersected 141.05 g Ag eq/t (22.99g Ag/t, 0.07g Au/t, 0.18% Zn, 0.16% Pb, 0.21% Cu and 0.12% Sn) over 153.25m. Hole DSBU-05 has a second major intersection lower in the hole from 348.08m to 526.17m of 92.47 g Ag eq/t (23.86g Ag/t, 0.96% Zn, 0.21% Pb) over 178.09m. Overall, 65% of this 641.9m long hole had reportable intersections which collectively average 107.73 g Ag eq/t.
ELO.V, Eloro, 321gold.com, Bob Moriarty, Bolivia, Iska Iska property,
Figure 1

Eloro Resources Ltd. (TSX-V: ELO; OTCQX: ELRRF; FSE: P2QM) (“Eloro”, or the “Company”) is pleased to announce assay results from an additional six (6) diamond drill holes from its on-going drilling program at the Iska Iska silver-tin polymetallic project in the Potosi Department, southern Bolivia. Holes DSBU-05 and DSBU-06 are underground holes drilled from the Santa Barbara adit to test the northern extension of the higher-grade mineralized zone. Hole DSBS-01 was collared in the southern part of the Santa Barbara target zone and drilled at an azimuth of 300 and dip of -300 to test the same target. Holes DSB-24, DSB-14 and DSB-22 were drilled at azimuths of 2250 to test the northwest extension of the Santa Barbara mineralized zone approximately 100m, 200m, and 1,000m, respectively, northwest of the Santa Barbara adit underground drill bay. Drilling is continuing in the Porco area to test for a potential Sn porphyry as suggested by the 3D inverse magnetic model (see Eloro press release March 1, 2022). Thus far, 4,870 m in five (5) holes have been completed in the Porco target area with assays pending. read more

Eloro Resources Intersects 171.57 g Ag eq/t (12.04 g Ag/t, 0.29% Zn, 0.22% Pb and 0.22% Sn) over 373.40m in Southern Part of Santa Barbara Target at Iska Iska Silver-Tin Polymetallic Project, Potosi Department, Bolivia

Includes higher-grade sections of 401.81 g Ag eq/t (31.46 g Ag/t, 0.19 %Pb and 0.61 %Sn) over 28.58m from 192.72m to 221.30m, 261.83 g Ag eq/t (4.91 g Ag/t and 0.43% Sn) over 95.16m in underground drill hole DSBU-03. Deeper in this hole, an additional major intersection of 197.61 g Ag /t (1.79 g Ag/t and 0.28% Sn) over 60.50m was encountered from 418.80m to 479.30m. In order to more aggressively drill this major new extension of the Santa Barbara deposit, a third surface diamond drill is being brought onto site bringing the total operating drills to four (3 surface and 1 underground).
ELO.V, Eloro, 321gold.com, Bob Moriarty, Bolivia, Iska Iska property,

 Eloro Resources Ltd. (TSX-V: ELO; OTCQX: ELRRF; FSE: P2QM) (“Eloro”, or the “Company”) is pleased to announce assay results from an additional diamond drill hole from its on-going drilling program at the Iska Iska silver-tin polymetallic project in the Potosi Department, southern Bolivia. Hole DSBU-03, an underground hole drilled due west from the Santa Barbara adit at -50 degrees, has discovered major new depth extensions of the already large Santa Barbara mineralized zones. read more

Eloro Resources Intersects 172.43 g Ag eq/t (40.16 g Ag/t, 0.51% Zn, 0.41% Pb and 0.13% Sn) over 303.05m in Southern Part of Santa Barbara Target at Iska Iska Silver-Tin Polymetallic Project, Potosi Department, Bolivia

Includes higher-grade sections of 507.64 g Ag eq/t (119.36 g Ag/t, 0.14 g Au/t, 0.57 %Pb and 0.52 %Sn) over 49.55m from 0.0 to 49.55m and 196.67 g Ag eq/t (66.93 g Ag/t, 1.03% Zn, 0.67% Pb and 0.08% Sn) over 77.77m in underground drill hole METSBUG-02. Hole DSB-20, which is in approximately the centre of the NW Extension target area, intersected 22 reportable intersections with a best result of 129.42 g Ag eq/t (21.79 g Ag/t, 0.27% Zn, 0.36% Pb and 0.12% Sn) over 73.65m including a higher-grade section of 204.03 g Ag eq/t (27.54 g Ag/t, 0.40% Zn, 0.55% Pb and 0.21% Sn) over 28.57m.
ELO.V, Eloro, 321gold.com, Bob Moriarty, Bolivia, Iska Iska property,

Eloro Resources Ltd. (TSX-V: ELO; OTCQX: ELRRF; FSE: P2QM) (“Eloro”, or the “Company”) is pleased to announce assay results from six (6) additional diamond drill holes from its on-going drilling program at the Iska Iska silver-tin polymetallic project in the Potosi Department, southern Bolivia. Hole METSBUG-02 is an underground hole drilled northeast from the Santa Barbara adit for metallurgical purposes and to complete fill-in drilling. The remaining five (5) holes tested the NW extension in the Santa Barbara Mineral Resource Target Area (DSB-12, -13, -15, -20 and -21) on a series of NE-SW sections as shown in Figure 1. read more

Eloro Resources Announces Restart of Diamond Drilling and Provides Update on Iska Iska Silver-Tin Polymetallic Project, Potosi Department, Bolivia

ELO.V, Eloro, 321gold.com, Bob Moriarty, Bolivia, Iska Iska property,

Eloro Resources Ltd. (TSX-V: ELO; OTCQX: ELRRF; FSE: P2QM) (“Eloro”, or the “Company”) is pleased to provide an update on its Iska Iska silver-tin polymetallic project in the Potosi Department, southern Bolivia. By the end of 2021, the Company completed 40,468 metres (m) in 73 drill holes at Iska Iska, as shown in Figure 1. Table 1 summarizes drill holes with assays pending. Currently there are two surface drill rigs and one underground drill rig on site. Drilling with all rigs recommenced on January 17, 2022. Highlights of work in progress are as follows: read more

Channel Sampling at Porco Adit returns 103m Strike Length Grading 521 Ag eq/t (including 117 g Ag/t, 1.44 g Au/t, 0.54% Cu and 0.66%Sn) at Iska Iska Silver-Tin Polymetallic Project, Potosi Department, Bolivia

Drill hole DPC-01 on the edge of a major magnetic susceptibility anomaly in the Porco Breccia Pipe area returned sixteen (16) separate zones of sulphide veins including 110.30 g Ag eq/t over 3.0m. Magnetic inversion model outlines extensive target zone in the Porco-Central Breccia Pipe areas.
ELO.V, Eloro, 321gold.com, Bob Moriarty, Bolivia, Iska Iska property,

Eloro Resources Ltd. (TSX-V: ELO; OTCQX: ELRRF; FSE: P2QM) (“Eloro”, or the “Company”) is pleased to provide an update on its Iska Iska silver-tin polymetallic project in the Potosi Department, southern Bolivia. To date, the Company has completed 35,738 metres (m) in 68 drill holes including three (3) in progress to test major target areas at Iska Iska. This press release reports drilling results from one (1) additional hole which tested the Porco Breccia Pipe (“PBP”) (Hole DPC-01) and new underground channel sampling from the Porco adit located approximately 200m south of the PBP. Currently three drill rigs are in operation at Iska Iska. Two surface drill rigs are continuing to drill at the Santa Barbara Resource Definition Target Zone (Figure 1) to outline an initial National Instrument 43-101 (“NI-43-101”) compliant resource. A third drill, an underground rig, situated in the west end of the Santa Barbara Adit, is testing the eastern part of Santa Barbara Breccia Pipe (“SBBP’) and its mineralized envelope. Figure 1 is a geological plan map showing locations of drill holes completed, in progress and planned to complete resource definition drilling along with an updated geological interpretation. Figure 2 is a plan map of channel sampling at the Porco adit. Table 1 provides significant drilling results with definitions of chemical symbols, Table 2 details channel sample results from the Porco adit and Table 3 lists holes completed with assays pending, as well as holes in progress in the three major target areas. Highlights include: read more

Eloro Intersects 100 Ag eq/t (including 38.71 g Ag/t, 0.88%Zn and 0.51%Pb) over 188.5 m in the Santa Barbara Breccia Pipe at Iska Iska Silver-Tin Polymetallic Project, Potosi Department, Bolivia

Section includes a higher-grade zone of 154 g Ag eq/t (including 75.51 g Ag/t, 0.96% Zn, 0.65% Pb and 0.16% Cu) over 65.8m
ELO.V, Eloro, 321gold.com, Bob Moriarty, Bolivia, Iska Iska property,

Eloro Resources Ltd. (TSX-V: ELO; OTCQX: ELRRF; FSE: P2QM) (“Eloro”, or the “Company”) is pleased to provide an update on its Iska Iska silver-tin polymetallic project in the Potosi Department, southern Bolivia. To date, the Company has completed 34,409 metres (m) in 64 drill holes including three (3) in progress to test major target areas at Iska Iska. This press release reports drilling results from one (1) additional hole which tested the Santa Barbara Breccia Pipe (“SBBP”) (Hole DHK-23) and two holes (DCN-05 and DCS-03) which tested the Central Breccia Pipe target (“CBP”). To date, every drill hole that has been assayed has returned multiple reportable mineralized intercepts. Currently three drill rigs are in operation at Iska Iska. Two surface drill rigs are continuing to drill at SBBP to outline an initial National Instrument 43-101 (“NI-43-101”) compliant resource. A third drill, an underground rig, situated in the west end of the Santa Barbara Adit, is testing the eastern part of SBBP and its mineralized envelope. Figure 1 is a geological plan map showing locations of drill holes and an updated geological interpretation. Table 1 provides significant drilling results with definitions of chemical symbols and Table 2 lists holes completed with assays pending, as well as holes in progress in the three major target areas. Highlights are as follows: read more

Eloro Resources Makes Iska Iska Polymetallic Property Option Payment

ELO.V, Eloro, 321gold.com, Bob Moriarty, Bolivia, Iska Iska property,

Eloro Resources Ltd. (TSX-V: ELO; OTCQX: ELRRF; FSE: P2QM) (“Eloro”, or the “Company”) is pleased to announce that it has advanced US$3 million as property option payments, pursuant to the Private Option Agreement (the “Agreement”) to acquire a 99% interest in the Iska Iska silver-tin polymetallic project (“Iska Iska”) in the Potosi Department, southern Bolivia. The Agreement grants Eloro the option to acquire a 99% interest in Iska Iska for consideration consisting of 500,000 Eloro common shares, of which 250,000 have been issued, with the remaining 250,000 to be issued on or before January 6, 2022, and the payment of US$10 million, of which US$3 million has been paid to date, with the remaining US$7 million due on or before January 6, 2024. read more

Eloro Intersects 160.22g Ag eq/t (36.53 g Ag/t, 1.63%Zn, 1.20%Pb and 0.10%Sn) over 194.14 m in the Santa Barbara Breccia Pipe at Iska Iska Silver-Tin Polymetallic Project, Potosi Department, Bolivia

Section includes 350.91 g Ag eq/t (112.57 g Ag/t, 1.41% Zn, 3.08% Pb and 0.33% Sn) over 30.06m
ELO.V, Eloro, 321gold.com, Bob Moriarty, Bolivia, Iska Iska property,

Eloro Resources Ltd. (TSX-V: ELO; OTCQX: ELRRF; FSE: P2QM) (“Eloro”, or the “Company”) is pleased to provide an update on its Iska Iska silver-tin polymetallic project in the Potosi Department, southern Bolivia. To date, the Company has completed 30,014 metres (m) in 57 drill holes including three (3) in progress to test major target areas at Iska Iska. This press release reports drilling results from two (2) additional holes which tested the Santa Barbara Breccia Pipe (“SBBP”) (Holes DHK-21 and DHK-22). To date, every drill hole that has been assayed has returned multiple reportable mineralized intercepts. Currently three drill rigs are in operation at Iska Iska. Two surface drill rigs are completing drilling at SBBP in order to outline an initial National Instrument 43-101 (“NI 43-101”) compliant resource. A third drill, an underground rig, situated in the west end of the Santa Barbara Adit, is testing the eastern part of the SBBP and its mineralized envelope. Figure 1 is a geological plan map showing locations of drill holes and an updated geological interpretation. This map depicts the recently identified robust magnetic anomaly to the northwest of the SBBP where drilling is in progress (see press release June 7, 2021, for an overview of the magnetic results). Figure 2 is a north-south section showing the major potential extension of the SBBP mineralized system. Table 1 provides significant drilling results with definitions of chemical symbols and Table 2 lists holes completed with assays pending, as well as holes in progress in the three major target areas. Highlights are as follows: read more

Multiple Holes Yield Silver-Tin Polymetallic Intercepts in the Santa Barbara and Central Breccia Pipes at Eloro Resources’ Iska Iska Project, Bolivia

Hole DSB-08 in the Santa Barbara Breccia Pipe returned 69.89 g Ag eq/t over 252.89m including 196.60 g Ag eq/t with 131.13 g Ag/t over 14.52m Hole DSB-10 returned 29 reportable mineralized intercepts over its entire 1 km length including 114.96 g Ag eq/t over 56.12m and 80.71 g Ag eq/t over 74.39m
ELO.V, Eloro, 321gold.com, Bob Moriarty, Bolivia, Iska Iska property,
Table 1

Eloro Resources Ltd. (TSX-V: ELO; OTCQX: ELRRF FSE: P2QM) (“Eloro”, or the “Company”) is pleased to provide an update on its Iska Iska silver-tin polymetallic project in Potosi Department, southern Bolivia. To date, the Company has completed 43 diamond drill holes totalling 20,030 metres (m) to test major target areas at Iska Iska. This press release reports drilling results from four (4) additional holes which tested the Santa Barbara Breccia Pipe (“SBBP”) and Central Breccia Pipe (“CBP”). To date, every drill hole that has been assayed has returned multiple reportable mineralized intercepts. Currently three drill rigs are in operation at Iska Iska. One surface drill rig is completing first pass drilling of the CBP from the northern radial platform and a second surface drill is testing the major Porco (South) Target. The third drill, an underground rig, is testing the northeast part of SBBP and its mineralized envelope. Figure 1 is a geological plan map showing locations of drill holes and an updated geological interpretation. Figure 2 is a more detailed geological plan map of the SBBP and CBP areas. Figure 3 is a NW-SE geological section along the northwestern part of the CBP and the eastern part of SBBP showing locations of the main mineralized zone and of drill holes DSB-08, DSB-10 and DCN-2 in this release. Figure 4 shows the currently interpreted metal zoning pattern on this same section. Table 1 provides significant drilling results and Table 2 lists holes completed with assays pending as well as holes in progress in the three major target areas. Highlights are as follows: read more