Eloro Resources Ltd. (TSX-V: ELO; OTCQX: ELRRF; FSE: P2QM) (“Eloro”, or the “Company”) is pleased to provide an update on its Iska Iska silver-tin polymetallic project in the Potosi Department, southern Bolivia. To date, the Company has completed 35,738 metres (m) in 68 drill holes including three (3) in progress to test major target areas at Iska Iska. This press release reports drilling results from one (1) additional hole which tested the Porco Breccia Pipe (“PBP”) (Hole DPC-01) and new underground channel sampling from the Porco adit located approximately 200m south of the PBP. Currently three drill rigs are in operation at Iska Iska. Two surface drill rigs are continuing to drill at the Santa Barbara Resource Definition Target Zone (Figure 1) to outline an initial National Instrument 43-101 (“NI-43-101”) compliant resource. A third drill, an underground rig, situated in the west end of the Santa Barbara Adit, is testing the eastern part of Santa Barbara Breccia Pipe (“SBBP’) and its mineralized envelope. Figure 1 is a geological plan map showing locations of drill holes completed, in progress and planned to complete resource definition drilling along with an updated geological interpretation. Figure 2 is a plan map of channel sampling at the Porco adit. Table 1 provides significant drilling results with definitions of chemical symbols, Table 2 details channel sample results from the Porco adit and Table 3 lists holes completed with assays pending, as well as holes in progress in the three major target areas. Highlights include: read more