Eloro Resources’ drill hole DHK-27 intersects 202.43g Ag eq/t (69.80g Ag/t, 1.21% Zn, 0.49% Pb, and 0.12%Sn) over 325.48m including a higher-grade portion of 395.98 g Ag eq/t (182.02g Ag/t, 1.73% Zn, 0.97% Pb, 0.18% Cu and 0.19%Sn) over 109.60m in the High-Grade Zone, Santa Barbara Deposit at the Iska Iska Silver-Tin Polymetallic Project, Potosi Department, Bolivia

The silver grades in DHK-27 are the highest and most extensive yet intersected in the Santa Barbara deposit. 50% of this 860m long hole, drilled from Huayra Kasa due west at -45 degrees, returned reportable intersections averaging 172.09 g Ag eq/t. Holes DHK-26, DHK-28, DHK-29, DHK-30 and DSB-42, which returned multiple intersections, are additional holes collared in the Huayra Kasa area that tested the eastern margin of the High-Grade Zone at Santa Barbara. Highlights include: 222.51g Ag eq/t (28.44g Ag/t, 3.11% Zn and 0.26% Pb) over 53.90m and 99.76 g Ag eq/t (32.59g Ag/t, 0.11 g Au/t and 0.54% Zn) over 82.38m (DHK-26). 79.22g Ag eq/t (26.62g Ag/t, 0.35% Zn and 0.35% Pb) over 141.56m including 162.77g Ag eq/t (67.00g Ag/t, 0.55% Zn and 1.30% Pb) over 23.85m (DHK-28). 176.28g Ag eq/t (19.10g Ag/t, 2.29% Zn and 0.27% Pb) over 21.30m and 82.48g Ag eq/t (5.07g Ag/t, 0.21 g Au/t, 0.78% Zn and 0.18% Pb) over 69.18m (DHK-29). 130.69g Ag eq/t (7.19g Ag/t, 1.83% Zn and 0.48% Pb) over 42.17m and 129.98g Ag eq/t (19.71g Ag/t, 1.50% Zn and 0.57% Pb) over 72.31m including a higher-grade portion of 208.42g Ag eq/t (33.10g Ag/t, 2.37% Zn and 1.00% Pb) over 34.64m (DSB-42). Channel sampling of the Mina1 and Mina2 underground workings in the southern part of the property approximately 2km south-southeast of the Santa Barbara adit, returned significant values in vein breccias as follows: 153.94g Ag eq/t (55.03g Ag/t, 0.11 g Au/t, 0.7% Zn, 0.16% Pb and 0.08 % Sn) over 145.95m of the northwest trending drift including a higher-grade portion of 285.16g Ag eq/t (120.18g Ag/t, 0.25 g Au/t 1.23% Zn, 0.30% Pb and 0.13% Sn) over 56.34m in Mina 1. 382.79g Ag eq/t (15.67g Ag/t, 1.70 g Au/t, 2.20% Zn and 0.75% Pb) over 68.53m in an east-west trending crosscut in Mina 2. A second shorter crosscut on a secondary subparallel structure approximately 20m to the south returned 475.78g Ag eq/t (69.31g Ag/t, 0.26 g Au/t, 5.62% Zn and 1.92% Pb) over 26.67m in Mina 2. Drilling across the valley of the Iska Iska Caldera indicates that this area is underlain by a coarse-grained porphyritic dacitic intrusion that is well mineralized with Ag, Zn and Pb and is the likely source of the extensive epithermal mineralization in the Santa Barbara and Central Breccia areas. The porphyry, now named the Iska Iska Porphyry, is approximately 800m by 600m and is notable for the absence of tin mineralization despite the abundance of tin in the nearby area. The tin at Iska Iska is likely the product of an earlier higher temperature and deeper tin porphyry, which has been overprinted by the later higher-level porphyry-epithermal Ag-Zn-Pb mineralization related to the Iska Iska Porphyry. The definition drilling has more than doubled the volume of the High-Grade Zone defined by the >90 g Ag eq/t grade shell model to approximately 1,000m along strike, 800m wide and extending to a depth of 1,100m. This zone is open to the south, west and northwest as well as at depth. Eloro is working closely with Micon International to provide all data necessary for estimation of the inaugural mineral resource estimate targeted for the end of Q1 2023. Magnetic inverse modelling and limited deep drilling suggest that the major tin porphyry is likely below the Iska Iska Porphyry and to the south and southwest in the Porco and Mina Casiterita areas. The tin porphyry will be a major focus of exploration in 2023.
ELO.V, Eloro, 321gold.com, Bob Moriarty, Bolivia, Iska Iska property,
Geological Plan Map showing Drilling in Santa Barbara Area with Holes referred to in this release highlighted

Eloro Resources Ltd. (TSX-V: ELO; OTCQX: ELRRF; FSE: P2QM) (“Eloro”, or the “Company”) is pleased to announce assay results from eight (8) additional diamond drill holes from its definition drilling program at the Iska Iska silver-tin polymetallic project in the Potosi Department, southern Bolivia. Hole DHK-27 was drilled from Huayra Kasa due west at -45 degrees to a length of 860m to fill-in gaps in previous drilling of the High-Grade Zone. Five (5) additional holes (DHK-26. DHK-28, DHK-29, DHK-30 and DSB-42) were drilled to the southwest from the Huayra Kasa area to test the eastern margin of the Santa Barbara deposit. Hole DSB-43 was drilled on southwest side of Santa Barbara and hole DSB-46 tested the potential south-southeastern extension. read more

Eloro Resources Closes C$10.9 Million Bought Deal Financing

ELO.V, Eloro, 321gold.com, Bob Moriarty, Bolivia, Iska Iska property,

Eloro Resources Ltd. (the “Company” or “Eloro”) (TSX-V: ELO; OTCQX: ELRRF; FSE: P2QM) announces that it has closed today its previously announced bought deal financing (the “Offering”). Pursuant to the Offering, Eloro issued 3,466,530 units of the Company (the “Units”) at a price of C$3.15 per Unit for total gross proceeds of C$10,919,570. This includes 266,530 Units issued in connection with the partial exercise of the over-allotment option granted to the underwriters under the Offering. read more

Eloro Resources Announces C$10 Million Bought Deal Financing

V.ELO, Eloro Resources, Peru, gold, Tom Larsen

Eloro Resources Ltd. (the “Company” or “Eloro”) (TSX-V: ELO; OTCQX: ELRRF; FSE: P2QM) is pleased to announce that it has entered into an agreement with Cantor Fitzgerald Canada Corporation (“Cantor”) to act as sole underwriter (the “Underwriter”), pursuant to which the Underwriter has agreed to purchase, on a bought deal basis, 3,200,000 units (the “Units”) at a price of C$3.15 per Unit (the “Issue Price”) for gross proceeds to the Company of C$10,080,000 (the “Offering”). read more

Cartier Silver Grants Stock Options

Cartier Silver Corporation (CSE:CFE) (“Cartier Silver” or the “Company”) announces the grant of stock options to directors, officers and consultants to purchase 2,705,000 common shares of the Company, exercisable at $0.78 per share at any time on or before December 31, 2027. The grants are subject to the terms of Cartier Silver’s stock option plan. In accordance with regulatory requirements, any shares issued pursuant to the exercise of such options will be subject to a resale restriction for a period of four months from the date of the grant. read more

Cartier Silver Announces Closing of Its Previously Announced Financing

Cartier Silver Corporation (CSE:CFE) (“Cartier Silver” or the “Company”) is pleased to announce that it is has closed the final tranche of a previously announced (see Cartier Silver news releases dated November 22, 2022, December 15, 2022 and December 16, 2022) non-brokered private placement (the “Private Placement”) for additional proceeds of $999,500 pursuant to the offering of 10,000,000 units of Cartier Silver at a price of $0.40 per unit (“Units”) for aggregate gross proceeds of $4,000,000. A total of 2,498,750 Units were issued to investors in connection with the final closing of the Private Placement. read more

Cartier Silver Announces First Closing of its Previously Announced Financing

Cartier Silver Corporation (CSE:CFE) (“Cartier Silver” or the “Company”) is pleased to announce that it is has closed the first tranche of a previously announced (see Cartier Silver news releases dated November 22, 2022 and December 15, 2022) non-brokered private placement (the “Private Placement”) for proceeds of $3,000,500 pursuant to the offering of up to 10,000,000 units of Cartier Silver at a price of $0.40 per unit (“Units”) for aggregate proceeds of up to $4,000,000. A total of 7,501,250 Units were issued to investors in connection with the first closing of the Private Placement. read more

Cartier Silver Announces Upsizing of Previously Announced Financing; and Signing of Definitive Agreement to Acquire the Chorrillos Project in Potosi Department, Bolivia

Cartier Silver Corporation (CSE:CFE) (“Cartier Silver” or the “Company”) is pleased to announce that, due to investor demand in connection with its previously announced (see the Company’s press release dated November 22, 2022) private placement offering (the “Private Placement”), it is increasing the size of the Private Placement to up to 10 million units of the Company (“Units”) at a price of $0.40 per Unit for gross proceeds of up to $4 million. read more

Eloro Resources Intersects Multiple Intersections including 122.25g Ag eq/t (17.77g Ag/t, 0.30% Zn, 0.33% Pb, 0.10% Cu and 0.16% Sn) over 210.74m in High Grade Feeder Zone, Santa Barbara Target Area at the Iska Iska Silver-Tin Polymetallic Project, Potosi Department, Bolivia

The headline intersection in hole METSBUG-03 drilled from the Santa Barbara adit, includes higher-grade portions of: 272.90g Ag eq/t (100.21g Ag/t, 0.37% Pb, 0.17% Cu and 0.34% Sn) over 16.57m. 199.68g Ag eq/t (51.11g Ag/t and 0.34% Sn) over 13.11m. 64% of this 707.8m long drill hole contains reportable intersections averaging 164.32 g Ag eq/t. Holes DSB-38, DSB-39 and DSB-40 tested the on-strike extension of the High Grade Feeder Zone at Santa Barbara to the south-southeast. These holes tested an approximately 1,000m (1km) long section in mineralized dacite across the central part of the caldera valley approximately 500m south-southeast of the underground drill bay in the Santa Barbara adit. Highlights include: 269.56g Ag eq/t (52.63g Ag/t, 3.02% Zn and 1.82% Pb) over 58.85m including 462.04g Ag eq/t (75.05g Ag/t, 5.87% Zn and 2.55% Pb over 23.80m (DSB-38). 101.74g Ag eq/t (10.59g Ag/t, 0.16 g Au/t, 1.23% Zn and 0.28% Pb) over 74.07m including 255.53g Ag eq/t (31.83g Ag/t, 0.59 g Au/t, 2.73% Zn and 0.64% Pb over 17.24m (DSB-38). 91.96g Ag eq/t (4.71g Ag/t, 1.37% Zn and 0.15% Pb) over 193.96m with higher-grade portions of 147.94g Ag eq/t (4.56g Ag/t, 2.48% Zn and 0.29% Pb) over 19.86m and 218.05g Ag eq/t (14.33g Ag/t, 0.14 g Au/t, 3.35% Zn and 0.33% Pb) over 11.21m (DSB-40). 34% of these three holes which total 2,761m contained reportable intersections which collectively averaged 106 g Ag eq/t. Hole DSB-41, collared on a section 300m northwest of the DSB-38 to -40 section, intersected altered and mineralized dacite including 145.52g Ag eq/t (15.52g Ag/t, 0.11gAu/t, 1.54% Zn, 0.36% Pb and 0.07% Sn) over 71.39m, including a higher-grade portion of 261.83g Ag eq/t (26.12g Ag/t, 0.09g Au/t, 2.78% Zn, 0.56% Pb and 0.17% Sn over 15.24m. Hole DSB-35 that tested the potential southwest extension of the Santa Barbara High Grade Feeder Zone approximately 300m west-northwest of the underground drill bay in the Santa Barbara adit intersected 89.43g Ag eq/t (5.63g Ag/t, and 0.20% Sn) over 104.86m with higher-grade portions of 203.86g Ag eq/t (5.42g Ag/t, 0.14 gAu/t, and 0.47% Sn) over 8.69m, 383.23 g Ag eq/t (5.66g Ag/t, 0.06 g Au/t, and 0.95% Sn) over 4.44m and 153.09g Ag eq/t (2.40g Ag/t and 0.37% Sn) over 7.66m. Sn grades are notably elevated in this area. On-Strike Extension of the High-Grade Feeder Zone at Santa Barbara to South-Southeast is now confirmed for an additional 500m along strike for a total strike length of 1,500m. Geophysical data indicates potential for a further 500m strike length to 2,000m. Width of the Santa Barbara mineralized zone is now up to 1,000m across strike with a depth of at least 800m. The mineralized zone remains open in ALL directions as well as at depth.
ELO.V, Eloro, 321gold.com, Bob Moriarty, Bolivia, Iska Iska property,
Geological Plan Map showing Drilling in Santa Barbara Area with Holes referred to in this release highlighted.

Eloro Resources Ltd. (TSX-V: ELO; OTCQX: ELRRF; FSE: P2QM) (“Eloro”, or the “Company”) is pleased to announce assay results from eight (8) additional diamond drill holes from its on-going drilling program at the Iska Iska silver-tin polymetallic project in the Potosi Department, southern Bolivia. Six of these holes (DSB-35 and DSB-37 to DSB-41) tested the south-southeastern extension of the high-grade feeder zone at Santa Barbara while METSBUG-03 is a metallurgical hole drilled from the Santa Barbara adit underground drill bay. Hole DM2-01 is a reconnaissance drill hole near the Mina 2 adit in the southeast part of the property. read more

Cartier Silver Announces $3 Million Financing; Staking of Additional Claims in Potosi Department, Bolivia

Cartier Silver Corporation (CSE:CFE) (“Cartier Silver” or the “Company”) is pleased to announce that it is proceeding with a non-brokered private placement (the “Private Placement”) for proceeds of up to $3 million. The Company also announces the staking of additional claims in the Potosi Department, Bolivia, immediately south and west of the recently optioned Felicidad and Gonalbert properties (see Cartier Silver’s October 26, 2022 press release), respectively. read more

Eloro Resources to Acquire Additional Properties to Significantly Expand Holdings at the Iska Iska Silver-Tin Polymetallic Project, Potosi Department, Bolivia

The Mina Casiterita and Mina Hoyada properties to be acquired cover 14.75 km2 southwest and west of Iska Iska. These properties connect with the TUP-3 and TUP-6 claims previously staked by Eloro. Eloro has also staked additional land in the area. Following the acquisition, the total land package in the Iska Iska area to be controlled by Eloro will total 1,935 quadrants covering 483.75 km2. Artisanal mining in the 1960’s identified high grade tin (Sn) veins on the Mina Casiterita property that are hosted in an intrusive dacite. Production from 1962 to 1964 is reported by the Departamento Nacional de Geología in Bolivia to be 69.85 tonnes grading 50.60% Sn. Recently completed magnetic surveys by Eloro has outlined an extensive, near surface, magnetic intrusive body on the Mina Casiterita property immediately southwest of Iska Iska. This intrusive hosts the previously mined high-grade tin veins and is very likely the continuation of the porphyry tin intrusion projected to be below the epithermal Ag-Sn-Zn-Pb mineralization at Iska Iska. The Porco adit from which previously reported channel sampling returned 103m grading 521 g Ag eq/t (including 117g Ag/t, 1.44 g Au/t, 0.54% Cu and 0.66% Sn) in altered basement sediments, is located near the northeast part of the magnetic anomaly, attesting to the potential strength and high-grade nature of the mineralized system in the area. Drilling is planned on Mina Casiterita in Q1 2023 with geological mapping, sampling and geophysical surveys now in progress on the full land package across the Iska Iska region.
ELO.V, Eloro, 321gold.com, Bob Moriarty, Bolivia, Iska Iska property,

Eloro Resources Ltd. (TSX-V: ELO; OTCQX: ELRRF; FSE: P2QM) (“Eloro”, or the “Company”) is pleased to announce it has entered into an option agreement (the “Agreement”) to acquire the Mina Casiterita and Mina Hoyada properties (the “Acquisition”) which collectively cover 14.75 km2 southwest and west of the Iska Iska Silver-Tin Polymetallic Project (“Iska Iska”). Artisanal mining in the 1960’s identified high grade tin veins on the Mina Casiterita property that are hosted in intrusive dacite. Production from 1962 to 1964 is reported by the Departamento Nacional de Geología (National Department of Geology) in Bolivia as 69.85 tonnes grading 50.60% Sn. These properties connect with the TUP-3 and TUP-6 claims previously staked by Eloro. The Company has also staked additional claims in the Iska Iska region, as shown in Figure 1. Collectively, the land package to be controlled by Eloro following the Acquisition will total 1,935 quadrants covering 483.75 km2. This includes the Tomave, Khuchu Ingenio and Puna properties, located further north towards Potosi (Figure 1). read more