
Eloro Resources Ltd. (TSX: ELO; OTCQX: ELRRF; FSE: P2QM) (“Eloro”, or the “Company”) is pleased to announce further assay results from five (5) drillholes (DSB-80, DSB-84, DSB-85, DSB-86 and DSB-87) of the second phase definition diamond drilling program. Four of these holes are located in the Polymetallic Domain (DSB-80, DSB-84, DSB-85 and DSB-86) and one is in the Tin Domain (DSB-87), in the potential Santa Barbara starter pit area. These results have further expanded the footprint of a large multi-phase hydrothermal system in the potential starter pit with dimensions having now increased to approximately 800m by 500m by 500m deep (see Figure 1). The current results have increased dimensions by 100m by 100m along and across strike, compared with those previously reported (see Eloro’s Press Release dated August 6, 2025). To date, a total of 6,242m of diamond drilling in twelve (12) holes has been completed in the current definition drilling phase. A total of 2,346m was completed in the five (5) holes reported, with assays pending for the remaining two holes totalling 1,025m. read more