Eloro Resources Intersects 122.7 g Ag eq/t over 123.6m and 105.4 g Ag eq/t over 173.6m in the Santa Barbara Breccia Pipe at its Iska Iska Silver-Tin Polymetallic Project, Bolivia
Eloro Resources Ltd. (TSX-V: ELO; OTCQX: ELRRF FSE: P2QM) (“Eloro”, or the “Company”) is pleased to provide an update on its Iska Iska silver-tin polymetallic project in Potosi Department, southern Bolivia. To date, the Company has completed 33 diamond drill holes totalling 14,346.7 metres (“m”) to test the Huayra Kasa Mine area, Santa Barbara Breccia Pipe (“SBBP”) and Central Breccia Pipe (“CBP”) targets. This press release reports drilling results from hole DSB-07 which tested the SBBP. Currently three drill rigs are in operation at Iska Iska. Two surface drill rigs are testing the Central Breccia from the northern and southern radial setups and one underground drill is testing the target area east of SBBP. Figure 1 is a geological plan map depicting the locations of the drill holes with updated geological interpretation. Figure 2 is a NW-SE longitudinal section along the axis of the 800m long SBBP, showing the location of the main mineralized zone and of Hole DSB-07. Table 1 details significant drilling results and Table 2 lists holes completed with assays pending and holes in progress. Highlights are as follows: