Golden Predator Reports 3 Aces Project Bulk Sample Results
Golden Predator Mining Corp. (TSX.V:GPY) (OTCQX:NTGSF) (the “Company” or “Golden Predator”) reports today the reconciliation from the bulk sample program at the 3 Aces Project in Southeast Yukon, which yielded 29.654 kg (953.4 troy ounces) of fine gold from 776 metric tonnes processed. The average calculated grade of the bulk sample was 46.18 grams per tonne (g/t). The bulk sample was processed solely by the Company using conventional gravity recovery methods (crushing, grinding, sluicing and shaker tables) and has provided valuable technical information, and effectively demonstrates that gravity processing is sufficient to obtain high gold recoveries without the use of chemicals or elaborate equipment.