Eloro Resources Provides Update on Iska Iska Silver-Tin Polymetallic Project, Potosi Department, Southern Bolivia

Figure 1

Eloro Resources Ltd. (TSX-V: ELO; OTCQX: ELRRF FSE: P2QM) (“Eloro”, or the “Company”) is pleased to provide an update on its Iska Iska silver-tin polymetallic project in Potosi Department, southern Bolivia. To date, the Company has completed 26 diamond drill holes totalling 9,427 metres to test the Huayra Kasa Mine area, Santa Barbara Breccia Pipe (SBBP) and Central Breccia Pipe (CBP) targets. Results have been released for 18 of these holes (see press releases November 18, 2020 (DHK-01 to DHK-05), January 26, 2021 (DHK-06 to DHK-15) and February 23, 2021 (DHK-16, DHK-17 and DSB-01) with results pending for holes completed on SBBP (DSB-2 to DSB-08) and CBP (DCN-01). read more

Eloro Resources Announces C$12,900,000 Bought Deal Financing

Eloro Resources Ltd. (the “Company” or “Eloro”) (TSX-V: ELO; OTCQX: ELRRF; FSE: P2QM) is pleased to announce that it has entered into an agreement with Haywood Securities Inc. to act as co-lead underwriter and sole bookrunner, and Cormark Securities Inc. to act as co-lead underwriter (collectively, the “Underwriters”), pursuant to which the Underwriters have agreed to purchase, on a bought deal basis, 3,440,000 units (the “Units”) at a price of C$3.75 per Unit (the “Issue Price”) for gross proceeds to the Company of C$12,900,000 (the “Offering”). read more

Eloro Resources Continues to See Long Intercepts of Polymetallic Mineralization at the Santa Barbara Breccia Pipe, Potosi Department, Southern Bolivia

Mineralization in adjacent Central Breccia Pipe appears to have affinity with a tin porphyry

Eloro Resources Ltd. (TSX-V: ELO; OTCQX: ELRRF FSE: P2QM) (“Eloro”, or the “Company”) is pleased to announce further diamond drill results from its Iska Iska Silver-Polymetallic Project in Potosi Department, southern Bolivia. To date, Eloro has completed 22 holes totalling 7,185 metres from both underground (12) and surface drill holes (10). Currently a steeply inclined deep hole, DSB-06, is in progress to test the Santa Barbara Breccia Pipe (“SBBP”) at depth. This release reports results from the last two underground holes (DHK-16 and DHK-17) and the first radial surface hole from SBBP (DSB-01). Results from the first deep radial hole, DSB-02, are delayed for reasons discussed below. read more

Eloro Resources Adds Second Rig to Accelerate the Diamond Drill Program at its Iska Iska Property, Potosi Department, Southern Bolivia

Figure 1: Geological Plan Map of the Santa Barbara Breccia Pipe area

Eloro Resources Ltd. (TSX-V: ELO; OTCQX: ELRRF FSE: P2QM) (“Eloro”, or the “Company”) is pleased to announce that it is adding an additional drill rig to accelerate its diamond drilling program at its Iska Iska Silver-Polymetallic Project in Potosi Department, southern Bolivia. To date, Eloro has completed 22 holes totalling 6,721m metres from both underground (12) and surface drill holes (10). Results from the first five underground holes were reported on November 18, 2020 and an additional 10 holes were reported on January 26, 2021. Results are pending for an additional 7 holes (Table 1). Figure 1 is a plan map showing locations of the drill holes completed and in progress; Figures 2 and 3 are updated North-South and West-East geological cross sections, respectively. read more

Eloro Resources Intersects 129.6 Grams Silver Equivalent per Tonne over 257.5m in Extensive Silver-Polymetallic Mineralization in Santa Barbara Breccia Pipe, at its Iska Iska Property, Potosi Department, Southern Bolivia

Eloro Resources Ltd. (TSX-V: ELO; OTCQX: ELRRF FSE: P2QM) (“Eloro”, or the “Company”) is pleased to announce additional results from its diamond drilling program at its optioned Iska Iska Silver-Polymetallic Project (“Iska Iska”) in the Potosi Department, southern Bolivia. To date, through its Bolivian subsidiary, Minera Tupiza S.R.L. (“Minera Tupiza”), Eloro has completed 20 holes totalling 5,573m metres from both underground (12) and surface drill holes (8). Results from the first five underground holes were reported on November 18, 2020. This release reports results for 10 additional holes. Due to the polymetallic nature of the deposit, silver equivalent (“Ag eq”) values have been included for comparative purposes. Tables 1 and 2 list significant assay results. Figure 1 is a plan map detailing the locations of the drill holes, Figure 2 is a geological cross section of the Santa Barbara Breccia Pipe and Table 3 provides drill hole collar coordinates for all holes completed to date. read more

Eloro Resources Announces Filing of Preliminary Short Form Prospectus

 Eloro Resources Ltd. (the “Company” or “Eloro”) (TSX-V: ELO; OTCQX: ELRRF; FSE: P2QM) is pleased to announce that, in connection with its previously announced bought deal financing (see Eloro press releases dated December 9, 2020), it has filed a preliminary short form prospectus with the applicable securities regulators in each of the provinces of Canada, except Quebec. Under the terms of the financing, Haywood Securities Inc., as lead underwriter, and Echelon Wealth Partners Inc. (the “Underwriters”) have agreed to purchase, on a bought deal basis, 3,548,400 units (the “Units”) at a price of Cdn$1.55 per Unit (the “Issue Price”) for gross proceeds to the Company of Cdn$5,500,020 (the “Offering”). read more

Eloro Resources Discovers Second Major Mineralized Breccia Pipe Approximately 400m in Diameter at its Iska Iska Property, Potosi Department, Southern Bolivia

  • Drill Hole DHK-14 drilled at -10 degrees to the southwest of Huayra Kasa workings from Drill Bay #3 intersected almost 180m of silicified and mineralized breccia in the Santa Barbara Breccia Pie. Hole ended in well-mineralized breccia once the drill reached its depth capacity and only penetrated approximately 50% of the breccia pipe.
  • Channel sampling in 2019 at the north-western end of the Santa Barbara adit returned 0.32 g Au/t, 26.90 g Ag/t, 1.16% Pb, 28.5 g In/t and > 500ppm Sn along the margin of this pipe.
  • A third potential breccia pipe immediately to the south, the Central Breccia Pipe, identified by surface geological mapping and Aster satellite data, is elongate in shape with potential dimensions of approximately 400m by 700m;
  • Five (5) additional potential breccia pipe targets outlined further to the south and east; all confirmed and potential breccia pipes occur along ring structures in the margins of the Iska Iska caldera complex.

Eloro Resources Ltd. (TSX-V: ELOOTCQX: ELRRF FSE: P2QM) (“Eloro”, or the “Company”) is pleased to announce that diamond drilling has confirmed the presence of a second major breccia pipe southwest of the Huayra Kasa underground workings as shown in Figure 1. Drill Hole DHK-14 drilled at -10 degrees to the southwest of the underground workings from Drill Bay #3 intersected almost 180m of silicified and mineralized breccia from 151m to 330m in the Santa Barbara Breccia Pipe. This hole stopped in well-mineralized breccia at the maximum limit of the drilling range and only penetrated approximately 50% of the breccia pipe. Assays are pending. A field XRF analyser indicates the presence of lead (Pb) and zinc (Zn) predominantly before and in the periphery of the breccia transitioning to copper (Cu), bismuth (Bi) and tin (Sn) in the central part. However, the numbers measured are not quantitatively accurate hence cannot be reported. Note that silver (Ag) and gold (Au) cannot be detected by this instrument. read more