MGX Minerals Inc. (“MGX” or the “Company”) (CSE: XMG / FKT: 1MG / OTCQB: MGXMF) is pleased to announce that joint-venture partner Belmont Resources (TSX-V: BEA) has reported that drilling has reached a depth of 1,798 feet (548 metres) into the playa sediments in hole KB-3, the first hole of the 2018 drilling program at Kibby Basin. The first section of the hole was drilled to a depth of 1,270 feet using a mud rotary method, and the remaining 528 feet was completed with a diamond core tail. A total of 126 samples of drill cuttings from the mud-rotary section of the hole have been collected and shipped to ALS Global lab facility in Reno, Nevada for assaying. Lithium and multi-element assay results from these samples will be compiled once testing is complete. read more