Tocvan Venture Corp. Announces Approval and Commencement of Trading on OTCQB Venture Marketplace

CSE:TOC, TocVan Ventures, gold, mexico

Tocvan Ventures Corp. (CSE:TOC) (CNSX:TOC.CN) (OTC:TCVNF) (“Tocvan” or the “Corporation”) is pleased to announce that the Company has been approved to list the company’s common shares on the OTCQB® Venture Marketplace (the “OTCQB Venture”) Investors are now able to trade securities on the OTCQB exchange. the trading symbol is “TCVNF” read more

Tocvan Drills 39.7 meters of 0.96 g/t Au including 12.2 meters of 3 g/t Au in Main Zone Step-Out Also Hits at Triple Vein Zone 400 meters to the East, Opens Up New Target Area

CSE:TOC, TocVan Ventures, gold, mexico

Tocvan Ventures Corp. (CSE:TOC) (CNSX:TOC.CN) (“Tocvan” or the “Corporation”) is pleased to announce final drill results from its Phase II drill program (the “Program”) at the Pilar Gold-Silver Project in Sonora, Mexico. A Phase II drill program was completed in June with over 3,500 meters of reverse circulation (RC) drilling in twenty (20) drill holes. Final results are included in this release, highlighted by drill hole JES-21-50 which returned 39.7 meters at 0.96 g/t Au in a 50 meter step-out to the Main Zone on trend with drill hole JES-21-47 which intersected 47.3 meters at 0.75 g/t Au. In addition, the first reconnaissance drill hole at the Triple Vein Zone (TVZ) was completed 400 meters to the east (JES-21-56) and was successful in intersecting mineralization at depth, returning 1.5 meters at 0.6 g/t Au and 139 g/t Ag. read more

Tocvan Drills 47.3 meters of 0.75 g/t Au from Surface in Step-out South of the Main Zone Also Drills 7.6 meters of 1.7 g/t Au and 7 g/t Ag at New 4-Trench Extension Target

CSE:TOC, TocVan Ventures, gold, mexico

Tocvan Ventures Corp. (CSE:TOC) (CNSX:TOC.CN) (“Tocvan” or the “Corporation”) is pleased to announce results for the next six drill holes from its Phase II drill program (the “Program”) at the Pilar Gold-Silver Project in Sonora, Mexico. A Phase II drill program has concluded with over 3,500 meters of reverse circulation (RC) drilling in twenty (20) drill holes. Results for six drill holes are included in this release, highlighted by drill hole JES-21-47 which returned 47.3 meters at 0.75 g/t Au and 5 g/t Ag (0.80 g/t AuEq). Seven (7) drill holes from new target areas are pending assay results. read more

Tocvan Drills 35.1 meters of 0.72 g/t AuEq in 100 meter Step-out East of the Main Zone at Pilar

CSE:TOC, TocVan Ventures, gold, mexico

Tocvan Ventures Corp. (CSE:TOC) (CNSX:TOC.CN)  (“Tocvan” or the “Corporation”) is pleased to announce results for the next four drill holes from its Phase II drill program (the “Program”) at the Pilar Gold-Silver Project in Sonora, Mexico. A Phase II drill program is currently in progress with 3,500 meters of reverse circulation (RC) drilling in twenty (20) drill holes. Results for four drill holes are included in this release, highlighted by drill hole JES-21-43 which returned 35.1 meters at 0.66 g/t Au and 6 g/t Ag (0.72 g/t AuEq). Thirteen (13) drill holes are pending assay results. read more

Tocvan Announces Agreement with Millrock for El Picacho Project Sonora, Mexico

Adds to Portfolio with Project in Caborca Orogenic Gold Belt
CSE:TOC, TocVan Ventures, gold, mexico

Tocvan Ventures Corp. (CSE:TOC) (CNSX:TOC.CN)  (“Tocvan” or the “Corporation”) is pleased to announce it has signed a Letter of Commitment with Millrock Resources Inc. to acquire the Option Agreement (“Agreement”) for the El Picacho Gold Project (the “Project”) within the Caborca Orogenic Gold Belt in Sonora, Mexico. The Project is located 140 kilometers north of Hermosillo in Sonora, Mexico and is fully accessible by road. Extensive surface exploration has been conducted historically defining five (5) gold targets on the project. Tocvan believes these targets will be ready for drill testing with surface confirmation via trenching. A permit is currently active to allow for trenching and drilling on the Project.  A site-visit has been completed by Tocvan to confirm target areas and project accessibility. The Agreement is subject to an additional 60-day due-diligence period effective June 7, 2021. read more

Tocvan Drills 29 meters of 0.71 g/t Au and 24.4 meters of 0.56 g/t Au in Hole JES-21-38 from Surface in Expansion Drilling at Pilar

Releases Phase II Results for the First Three Drill Holes
CSE:TOC, TocVan Ventures, gold, mexico

Tocvan Ventures Corp. (CNSX:TOC.CN) (“Tocvan” or the “Corporation”) is pleased to announce results for the first three holes from its Phase II drill program (the “Program”) at the Pilar Gold-Silver Project in Sonora, Mexico. A Phase II drill program is currently in progress with 2,900 meters of reverse circulation (RC) drilling in seventeen (17) drill holes completed to date. Results for the first three drill holes are included in this release. Fourteen (14) drill holes are pending assay results. read more

Tocvan Receives Additional Permit for Trenching and Drilling at Pilar

Submits Application for Listing of Common Shares on the OTCQB Venture Market
CSE:TOC, TocVan Ventures, gold, mexico

Tocvan Ventures Corp. (CSE:TOC) (CNSX:TOC.CN) (“Tocvan” or the “Corporation”) is pleased to announce permits have been received for an additional 44 drill pads and seven (7) trenches at its flagship Pilar Gold-Silver Project in Sonora, Mexico. Permitting was initiated as a proactive measure to ensure the timely and consistent advancement of Pilar. The additional drill pads will be utilized both during the current drill program and during a Phase III program planned for the fall of 2021. The trenches are permitted to be five-meters by two-meters by twenty-meters (5m x 20 m x 2 m) in size and will be utilized later in the year to channel sample across key mineralized sections on the property and to submit bulk sample material for column leach metallurgical analysis. The seven trenches will provide up to 3,500 tonnes of material for metallurgical test work and bulk sampling, ultimately leading towards a larger bulk sample. read more

Tocvan Provides Phase II Drill Program Update

CSE:TOC, TocVan Ventures, gold, mexico

Tocvan Ventures Corp. (CSE:TOC) (“Tocvan” or the “Corporation”) is pleased to provide an update for its flagship Pilar Gold-Silver Project in Sonora, Mexico. The Phase II drill program (the “Program”) is nearing the half-way point with a total of 4,000 meters planned. To date, eleven (11) drill holes have been completed for a total of 1,811 meters (Figure 1). Samples for the first five holes have been submitted to ALS Labs in Hermosillo, the remaining samples will be submitted later this week. Early drilling focused on the extension of the Main Zone, testing deeper down-dip extensions of mineralization in addition to stepping out along strike. Drill targeting has now shifted towards testing new areas along the 4-Trench Extension and Triple Vein Zone areas. read more

Tocvan Reports 92% Recovery of Gold from Preliminary Metallurgical Results

Provides Update on Phase II Drill Program
CSE:TOC, TocVan Ventures, gold, mexico

Tocvan Ventures Corp. (CSE:TOC) (CNSX:TOC.CN) (“Tocvan” or the “Corporation”) is pleased to announce the results of ongoing metallurgical work at its flagship Pilar Gold-Silver Project in Sonora, Mexico. Preliminary results have been received from two composite samples taken from the previously released drill hole JES-20-32. Drill hole JES-20-32 is thought to be representative of the central portion of the Main Zone, which during Phase I drilling in December of 2020 intersected 94.6-meters at 1.6 g/t Au including 9.2m at 10.8 g/t Au and 38 g/t Ag from 57.9 to 152.5 meters.  The samples consisted of a low-grade (0.63 g/t Au) and a medium-grade (1.2 g/t Au) composite to determine the susceptibility of dissolution of gold through cyanide bottle testing. The results show after a retention time of 48 hours, maximum dissolution can be reached of 91% for the low-grade composite and 92% for the medium-grade composite.  A summary of the results are provided in Table 1. Samples were submitted to SGS Laboratories in Durango, Mexico for analysis. read more

Tocvan Commences Largest Drill Program Ever Conducted at Pilar

Phase II Drilling Starts with a Planned 4,000 Meters.
CSE:TOC, TocVan Ventures, gold, mexico

Tocvan Ventures Corp. (CSE:TOC) (CNSX:TOC.CN) (“Tocvan” or the “Corporation”) is pleased to announce the start-up of the Phase II drill program (the “Program”) at its flagship Pilar Gold-Silver Project. The Program will consist of two stages and plans for a minimum of 4,000-meters of Reverse Circulation (“RC”) Drilling. Stage One will focus on the continued definition and expansion of the Main Zone, which during Phase I returned 94.6-meters at 1.6 g/t Au including 9.2m at 10.8 g/t Au and 38 g/t Ag in drill hole JES-20-32. Stage Two will begin to test new targets across the property including the Triple Vein Zone and 4-Trench Extension. read more