Tocvan Updates on Trenching Program at its Pilar Au-Ag Project

CSE:TOC, TocVan Ventures, gold, mexico

Tocvan Ventures Corp. (the “Company”) (CSE:TOC) (OTC:TCVNF) (WKN:TV3/A2PE64), is pleased to update on the trenching program at its Pilar Au-Ag Project in Sonora, Mexico. Trenching has started with four trenches completed to date at 4-Trench, North Hill and Main Zone targets. A trench at North Hill is complete and has been channel sampled to analyze an anomalous copper zone with oxide gold-silver mineralization. A trench at 4-Trench is complete and will be used for structural analysis and future drill targeting. Two Main Zone trenches are complete and material will be used for column leach studies and detailed structural analysis. Channel sample results from trenches are expected in January 2022 followed by submittal of bulk sample material for metallurgical test work. Drilling following up on Phase II drill program targets is scheduled to begin within the next week. read more

Tocvan Announces Exploration Plans for El Picacho Au-Ag Project Sonora, Mexico

CSE:TOC, TocVan Ventures, gold, mexico

Tocvan Ventures Corp. (the “Company”) (CNSX:TOC.CN) (OTC:TCVNF) (FSE/WKN:TV3/A2PE64), is pleased to announce the exploration plans for its El Picacho Au-Ag Project in Sonora, Mexico. El Picacho was a recent acquisition with the company negotiating the assignment of the option agreement from Millrock Resources. Five primary target areas (San Ramon, Cornea, Jabali, Puerto and Tortuga) have been identified to date combining for over 6 kilometers of prospective trend. The project is fully permitted for 1,995 meters of trenching, 60 drill holes (up to 15,000m) and 2.2 kilometers of access roads. The permit is a critical piece to the advancement of El Picacho and will allow Tocvan to scale-up exploration as needed. The company remains focused on its advanced stage Pilar Gold-Silver Project, however the high perspectivity of El Picacho warrants further investigation. read more

Tocvan Provides Phase II Drill Program Update

CSE:TOC, TocVan Ventures, gold, mexico

Tocvan Ventures Corp. (CSE:TOC) (“Tocvan” or the “Corporation”) is pleased to provide an update for its flagship Pilar Gold-Silver Project in Sonora, Mexico. The Phase II drill program (the “Program”) is nearing the half-way point with a total of 4,000 meters planned. To date, eleven (11) drill holes have been completed for a total of 1,811 meters (Figure 1). Samples for the first five holes have been submitted to ALS Labs in Hermosillo, the remaining samples will be submitted later this week. Early drilling focused on the extension of the Main Zone, testing deeper down-dip extensions of mineralization in addition to stepping out along strike. Drill targeting has now shifted towards testing new areas along the 4-Trench Extension and Triple Vein Zone areas. read more