Cartier Cuts 5.7 g/t Au over 4.0 m in Zones 5 Below Mine Infrastructure Doubling Resource Potential
Highlights:
Cartier Resources Inc. (TSX-V: ECR) (“Cartier”) reports additional drill hole intersections grading 14.6 g/t Au over 3.0 m including 36.8 g/t Au over 1.0 m, 450 m below the Chimo Mine (FIGURE). These higher-grade sections are included within a section grading 5.8 g/t Au over 10.0 m included within an interval of 44.0 m grading 2.2 g/t Au. The Chimo Mine project is situated 45 Km east of Val-d’Or within the prolific Val-d’Or Mining Camp. Results continue to confirm the robustness of the gold system below the former mine.
Cartier Resources Inc. (TSX-V: ECR) (“Cartier” or the Corporation) announces that it now has data which confirm the presence of gold mineralization within 20 drill holes completed between 1.0 and 1.6 km at the Chimo Mine project, located 45 km east of Val-d’Or. All holes intersected gold mineralization similar to that at Chimo Mine, to which are added the following new results: 4.7 g / t Au over 5.0 m included within 1.8 g / t Au over 16.6 m and 3.6 g / t Au over 4.0 m included 1.3 g / t Au over 17.4 m (FIGURE).
VAL D’OR, Quebec, Aug. 30, 2018 (GLOBE NEWSWIRE) — Cartier Resources Inc. (TSX-V: ECR) (“Cartier” or the Corporation) announces the launch of its newly revamped website. The new website has been live for a few days now and is located at the same address: http://ressourcescartier.com.
Cartier Resources Inc. (TSX-V: ECR) (“Cartier” or the Corporation) announces that it is launching an expanded and potentially “game changer” Phase II drill program on its Chimo Mine project, located 45 km east of Val-d’Or, Quebec.
Cartier Resources Inc. (TSX VENTURE:ECR) (“Cartier”) is pleased to announce it has intersected 7.6 g/t Au over 5.0 m, 235 m beneath the deepest stope at Chimo Mine, situated 45 km east of Val-d’Or. These new results were intersected at a depth of 1,075 m along the depth extensions of gold-bearing zones 5 which produced 2/3 of the ounces mined. The intersection is the first from an 8,000-m deep drilling program which is part of the ongoing 34,000-m drill program on the Chimo Mine property.