Cartier Cuts 5.6 g/t Au over 8.5 m in Zone 5M4 at Chimo Mine

Cartier Resources

Cartier Resources Inc. (TSX-V: ECR) (“Cartier”) reports drill results grading 5.6 g/t Au over 8.5 m including 9.9 g/t Au over 3.0 m and 8.3 g/t Au over 2.5 m.  These intersections are hosted within in a mineralized envelope over 27.8 m grading 2.5 g/t Au in  Zone 5M4 of the Chimo Mine property, located 45 km east of Val-d’Or (FIGURE). read more

Phase III Drilling Targets to Expand Zones on Chimo Mine Project

•Current Phase III drilling is focussed on expanding the dimensions of gold-bearing Zones 5NE, 5M4 and 6N1 as they are proximal to existing mine infrastructures
Cartier Resources

Cartier Resources Inc. (TSX-V: ECR) (“Cartier”) reports that Phase II drilling has been completed and that a Phase III has commenced on the Chimo Mine property, located 45 km east of Val-d’Or. read more

Cartier Continues to Widen Zones 5 below Chimo Mine with 14.6 g/t Au over 3.0 m within 5.8 g/t Au over 10.0 m

Cartier Resources

Cartier Resources Inc. (TSX-V: ECR) (“Cartier”) reports additional drill hole intersections grading 14.6 g/t Au over 3.0 m including 36.8 g/t Au over 1.0 m, 450 m below the Chimo Mine (FIGURE). These higher-grade sections are included within a section grading 5.8 g/t Au over 10.0 m included within an interval of 44.0 m grading 2.2 g/t Au. The Chimo Mine project is situated 45 Km east of Val-d’Or within the prolific Val-d’Or Mining Camp. Results continue to confirm the robustness of the gold system below the former mine. read more