Skyharbour Discovers New High Grade Uranium Mineralization at Maverick Zone including 5.39% U3O8 over 1.0 metre within 2.07% U3O8 over 3.5 metres; Summer 2018 Drill Program Upcoming

V.SYH, Skyharbour, Uranium,

Vancouver, BC – Skyharbour Resources Ltd. (TSX-V: SYH)(OTCQB: SYHBF)(Frankfurt:SC1P) (the “Company”) is pleased to announce the results from its 2018 winter/spring diamond drilling program at its flagship 35,705 hectare Moore Uranium Project, located approx.15 kilometres east of Denison Mine’s Wheeler River project and near regional infrastructure on the southeast side of the Athabasca Basin, Saskatchewan. Drillhole ML18-08 intersected high grade uranium mineralization within the Main Maverick Zone consisting of 5.39% U3O8 over 1.0 metre within an interval containing 2.07% U3O8 over 3.5 metres. This mineralization occurs at the unconformity from 265.8 to 269.3 metres downhole. Also of note is hole ML18-09 which intersected uranium mineralization at the unconformity in the Maverick East Zone, a new high grade lens discovered by Skyharbour last year. This hole returned a grade equivalent of 3.07% U3O8 over 1.8 metres from an interval containing a grade equivalent of 1.01% U3O8 over 6.3 metres. read more

Standard Lithium Commissions Hunt Guillot & Associates LLC For Engineering Services For Arkansas Pilot Plant

V.SLL, Standard Lithium

VANCOUVER, British Columbia, June 14, 2018 (GLOBE NEWSWIRE) — Standard Lithium Ltd. (“Standard Lithium” or the “Company”) (TSX-V:SLL) (FRA:S5L) is pleased to announce that they have engaged Hunt Guillot & Associates LLC (HGA) of Ruston, Louisiana, to provide engineering services for site preparation, utility connections and brine supply/disposal pipeline connections at the Company’s Pilot Plant site location in El Dorado, Southern Arkansas.  HGA experts are very familiar with the plant location, and their scope of work includes geotechnical investigations and civil infrastructure required to site the pilot plant modules; design and tendering of any structures required to house and protect the pilot plant infrastructure; all utility and brine pipeline interconnections; and pilot plant installation. read more

Manganese X Corporate Update

Maganese X Energy, V.MN
info

Manganese X Energy Corp. (TSXV: MN) (FSE: 9SC2) (TRADEGATE: 9SC2) (OTC Pink: SNCGF) (“Manganese X”) Michael Duggan, President of Mountain Springs Oil and Gas Ltd (“Mountain Springs”), on Tuesday, June 12th, has informed Manganese X that Mountain Springs are in the final stages of their due diligence to acquire an oil and gas property located in Central Alberta yielding net approximately $3.5 million per year. Due Diligence and, if successful, possession of the property are expected to be completed in 30 – 45 days. Upon completion and possession of the property Mountain Springs has also indicated that a definitive agreement will be executed to sell Manganese X 15% interest in Mountain Springs as previously indicated in non-binding letter of intent. read more

Golden Predator Announces Drilling to Begin at High Grade Sprogge Target at 3 Aces Project; Winter Drill Program Confirms Exploration Model

Golden Predator, V.GPY, gold, Yukon, Bill Sheriff

Golden Predator Mining Corp. (TSX-V:GPY) (OTCQX:NTGSF) (the “Company” or “Golden Predator”) announced today that diamond drilling will begin in early July at the high grade gold, 100% owned Sprogge Area of its 3 Aces project in southeastern Yukon, Canada (Figure 1). The Sprogge program will follow the model tested and confirmed by this winter’s drilling in the Central Core Area in which 12 of 15 holes successfully hit the quartz-rich target structure and confirmed the model for gold deposition at 3 Aces. read more

El Mochito Delivers High-Grade Intercepts Including 8.6 Metres at 9.6% Zinc Equivalent in Drilling Subsequent to Recent Resource Update

Ascendant Resources Inc. (TSX:ASND) (OTCQX:ASDRF) (FRA:2D9) (“Ascendant” or the “Company”) is pleased to announce results from 40 diamond drill holes (12,015 metres) as part of the 2018 exploration and definition drilling program at its El Mochito mine in Honduras. These results come after the release of the Company’s newly reported Mineral Resources and Reserves Estimate and National Instrument 43-101 Technical Report (see press release dated May 28th, 2018), which almost tripled contained zinc in Mineral Reserves and extended its life of mine to more than 7 years. The drilling is split between step-out (66%) and in-fill (34%) drill holes, and targets extensions of four ore bodies, namely Porvenir, Santa Elena, Port Royal Manto and Esperanza (See Figure 1 and Tables 1 & 2 below). These results continue to support the Company’s goals of increasing tonnage for further Mineral Reserve and Resource growth and identifying higher-grade ore at El Mochito that can quickly be brought into the mine plan. read more