Skyharbour Discovers New High Grade Uranium Mineralization at Maverick Zone including 5.39% U3O8 over 1.0 metre within 2.07% U3O8 over 3.5 metres; Summer 2018 Drill Program Upcoming
Vancouver, BC – Skyharbour Resources Ltd. (TSX-V: SYH)(OTCQB: SYHBF)(Frankfurt:SC1P) (the “Company”) is pleased to announce the results from its 2018 winter/spring diamond drilling program at its flagship 35,705 hectare Moore Uranium Project, located approx.15 kilometres east of Denison Mine’s Wheeler River project and near regional infrastructure on the southeast side of the Athabasca Basin, Saskatchewan. Drillhole ML18-08 intersected high grade uranium mineralization within the Main Maverick Zone consisting of 5.39% U3O8 over 1.0 metre within an interval containing 2.07% U3O8 over 3.5 metres. This mineralization occurs at the unconformity from 265.8 to 269.3 metres downhole. Also of note is hole ML18-09 which intersected uranium mineralization at the unconformity in the Maverick East Zone, a new high grade lens discovered by Skyharbour last year. This hole returned a grade equivalent of 3.07% U3O8 over 1.8 metres from an interval containing a grade equivalent of 1.01% U3O8 over 6.3 metres.