Skyharbour Grants Stock Options

V.SYH, Skyharbour, Uranium,

Skyharbour Resources Ltd. (TSX-V: SYH) (OTCQB: SYHBF) (Frankfurt: SC1P) (the “Company”) announces that it has granted incentive stock options (the “Options”) to certain directors, officers, management, company employees and consultants entitling them to purchase up to an aggregate of 1,500,000 common shares in the capital of the Company, subject to the policies of the TSX Venture Exchange. The Options are exercisable for five (5) years at a price of $0.42 per share. The Options were granted in accordance with the Company’s Stock Option Plan approved by the shareholders at the last AGM held November 1st, 2017. read more

Skyharbour Increases its Private Placement of Common and Flow-Through Shares

V.SYH, Skyharbour, Uranium,

Skyharbour Resources Ltd. (TSX-V:SYH) (OTCQB:SYHBF) (Frankfurt:SC1P) (the “Company”) announces that due to strong interest the Company has increased its non-brokered private placement financing to aggregate gross proceeds of approx. CAD $2.5 million. The Company has increased its placement from 3,250,000 units of the Company (the “Units”) to 3,600,000 Units at a price of CAD $0.40 each, and has increased its placement from 1,650,000 flow-through units (the “FT Units”) to 2,400,000 at a price of CAD $0.45 each. Each Unit will be comprised of one common share and one warrant (“Warrant”). Each whole Warrant will entitle the holder to purchase one additional common share for two (2) years at a price of CAD $0.60 each.  Each FT Unit will be comprised of one flow-through common share and one-half of one warrant (“Warrant”). Each whole Warrant will entitle the holder to purchase one additional common share for two (2) years at a price of CAD $0.60 each. read more

Skyharbour Announces a Private Placement of Common and Flow-Through Shares

V.SYH, Skyharbour, Uranium,

Skyharbour Resources Ltd. (TSX-V:SYH) (OTCQB:SYHBF) (Frankfurt:SC1P) (the “Company”) announces that it has arranged a non-brokered private placement of up to 2,000,000 units of the Company (the “Units”) at a price of CAD $0.40 each and up to 1,500,000 flow-through Units (the “FT Units”) at a price of CAD $0.45 each, for combined total gross proceeds of up to CAD $1,475,000. Each Unit will be comprised of one common share and one warrant (“Warrant”). Each whole Warrant will entitle the holder to purchase one additional common share for two (2) years at a price of CAD $0.60 each.  Each FT Unit will be comprised of one flow-through common share and one-half of one warrant (“Warrant”). Each whole Warrant will entitle the holder to purchase one additional common share for two (2) years at a price of CAD $0.60 each. read more

NexGen’s Winter Assays Confirm Uranium Mineralization in Newly Discovered Areas of the A0 Shear, 160 m Northwest and Northeast Along Strike from the A1 and A2 Shears, and Strong Continuity From Infill Drilling at Arrow Deposit

T.NXE, NexGen, uranium
Figure 1: Arrow and South Arrow Drill Hole Locations (CNW Group/NexGen Energy Ltd.)

NexGen Energy Ltd. (“NexGen” or the “Company”) (TSX:NXE, NYSE MKT:NXE) is pleased to report assay results for all fifty-four holes from our recently concluded winter drilling program on our 100% owned, Rook I property, in the Athabasca Basin, Saskatchewan.  read more

Skyharbour Discovers New High Grade Uranium Mineralization at Maverick Zone including 5.39% U3O8 over 1.0 metre within 2.07% U3O8 over 3.5 metres; Summer 2018 Drill Program Upcoming

V.SYH, Skyharbour, Uranium,

Vancouver, BC – Skyharbour Resources Ltd. (TSX-V: SYH)(OTCQB: SYHBF)(Frankfurt:SC1P) (the “Company”) is pleased to announce the results from its 2018 winter/spring diamond drilling program at its flagship 35,705 hectare Moore Uranium Project, located approx.15 kilometres east of Denison Mine’s Wheeler River project and near regional infrastructure on the southeast side of the Athabasca Basin, Saskatchewan. Drillhole ML18-08 intersected high grade uranium mineralization within the Main Maverick Zone consisting of 5.39% U3O8 over 1.0 metre within an interval containing 2.07% U3O8 over 3.5 metres. This mineralization occurs at the unconformity from 265.8 to 269.3 metres downhole. Also of note is hole ML18-09 which intersected uranium mineralization at the unconformity in the Maverick East Zone, a new high grade lens discovered by Skyharbour last year. This hole returned a grade equivalent of 3.07% U3O8 over 1.8 metres from an interval containing a grade equivalent of 1.01% U3O8 over 6.3 metres. read more

NEXGEN ANNOUNCES POSITIVE RESULTS FROM ARROW PROJECT STUDIES

T.NXE, NexGen, uranium
Cision

VANCOUVERJune 13, 2018 /CNW/ – NexGen Energy Ltd. (“NexGen” or the “Company”) (TSX: NXE) (NYSE MKT: NXE) is pleased to report the positive results from Pre-Feasibility-stage technical studies including metallurgical, geotechnical, and hydrogeological assessments. These studies were conducted on the basement-hosted Arrow Deposit, located on the Company’s 100% owned Rook I project in Saskatchewan’s Athabasca Basin. read more