NexGen Intersects Continuous and Strong High-Grade Mineralization in all of the Initial A2 Sub-Zone Targets from Feasibility Stage Drilling

T.NXE, NexGen, uranium
Figure 1: Arrow and South Arrow Drill Hole Locations (CNW Group/NexGen Energy Ltd.)

NexGen Energy Ltd. (“NexGen” or the “Company”) (TSX: NXE, NYSE MKT: NXE) is pleased to report radioactivity results for the first twenty holes comprising 8,216.5 m from the Company’s first phase of Feasibility-stage drilling program at our 100% owned, Rook I property in the Athabasca Basin Saskatchewan. read more

NexGen Announces Appointment of Brad Wall, the Former Premier of Saskatchewan, to its Board of Directors

T.NXE, NexGen, uranium

NexGen Energy Ltd. (“NexGen” or the “Company”) (TSX:NXE, NYSE MKT:NXE) is pleased to announce the appointment of former Saskatchewan Premier Mr. Brad Wall to the Company’s Board of Directors. This appointment coincides with the retirement from the NexGen Board of Craig Parry, Chief Executive Officer of IsoEnergy and founding member of the Board of Directors at NexGen, who is moving onto the Technical Advisory Committee. read more

Skyharbour Partner Company Azincourt Energy Commences Drilling at East Preston Project in Saskatchewan

V.SYH, Skyharbour, Uranium,

Skyharbour Resources Ltd. SYH)”>(TSX-V:SYH) (OTCQB:SYHBF) (Frankfurt:SC1P) (the “Company”) is pleased to announce that its partner company Azincourt Energy Corp. (“Azincourt”) has commenced phase one of its diamond drilling at the East Preston Uranium Project, in the western Athabasca Basin, northern Saskatchewan. read more

Skyharbour Partner Company Azincourt Energy Mobilizes Crew for Drill Program and Completes VTEM Survey at East Preston, Saskatchewan

V.SYH, Skyharbour, Uranium,

Skyharbour Resources Ltd. SYH)”>(TSX-V:SYH) (OTCQB:SYHBF) (Frankfurt:SC1P) (the “Company”) is pleased to announce that its partner company Azincourt Energy Corp. (“Azincourt”) has received all relevant permits for its proposed uranium drill program at the East Preston Project. Crews have now been mobilized in support of the program with drilling expected to commence before mid-March. read more

Skyharbour Commences Minimum 3,000m Winter Diamond Drilling Program at its High Grade Moore Uranium Project, Saskatchewan

V.SYH, Skyharbour, Uranium,

Skyharbour Resources Ltd. SYH)”>(TSX-V:SYH) (OTCQB:SYHBF) (Frankfurt:SC1P) (the “Company”) is pleased to announce it has commenced its winter 2019 diamond drilling program at its flagship 35,705 hectare Moore Uranium Project, located approx. 15 kilometres east of Denison Mine’s Wheeler River project and near regional infrastructure on the southeast side of the Athabasca Basin, Saskatchewan. The Company is planning to carry out a minimum of 3,000 metres of drilling in eight to ten diamond drill holes to follow up on the success of the drill programs completed last year. This drill program will test both unconformity and basement-hosted targets along the high grade Maverick structural corridor, as well as essentially untested prospective conductive corridors identified by Skyharbour’s technical team. Of particular interest are potential underlying basement feeder zones to the unconformity-hosted high grade uranium present along the Maverick corridor. These targets have seen limited historical drill testing. read more

NexGen Releases Results from Shaft Pilot Hole Report and Assays from the Development Drilling Summer 2018 Program

T.NXE, NexGen, uranium
Figure 1: Arrow Deposit Drilling Locations (CNW Group/NexGen Energy Ltd.)

NexGen Energy Ltd. (“NexGen” or the “Company”) (TSX:NXE, NYSE MKT:NXE) is pleased to report geotechnical results for the initial shaft pilot holes and assays for all twenty-nine holes comprising 20,482.31 m, drilled during the summer development program on the Company’s 100% owned Rook I property, in the Athabasca Basin, Saskatchewan. read more

Aben Resources Grants Stock Options

Aben Resources Ltd. (TSX-V: ABN) (OTCQB: ABNAF) (Frankfurt: E2L2) (the “Company”) announces, pursuant to its stock option plan, the Company has granted incentive stock options to its directors, officers, employees and consultants to purchase up to an aggregate of 4,000,000 common shares in the capital stock of the Company, exercisable for a period of two years, at a price of $0.16 per share. The Company’s 10% rolling stock option plan was approved by the shareholders at the Annual General Meeting of the Company held on July 25, 2018. read more

Skyharbour Option Partner Orano Canada Commences Winter Diamond Drill Program at Preston Uranium Project

V.SYH, Skyharbour, Uranium,

Skyharbour Resources Ltd. SYH)”>(TSX-V:SYH) (OTCQB:SYHBF) (Frankfurt:SC1P) (the “Company”) is pleased to announce that the Company’s option partner Orano Canada Inc. (“Orano Canada”) has commenced a planned 3,600 metre winter diamond drill program at the Preston Uranium Project. The project is located in the western Athabasca Basin near NexGen Energy Ltd.’s high-grade Arrow deposit hosted on its Rook-1 property and Fission Uranium Corp.’s Triple R deposit located within their PLS Project area. read more

NexGen Commences 125,000 m Feasibility Stage Drilling Program and Technical Studies at the Arrow Deposit

T.NXE, NexGen, uranium
Figure 1: Focus of Objective 1 and 2 Drilling (CNW Group/NexGen Energy Ltd.)

NexGen Energy Ltd. (“NexGen” or the “Company”) (TSX: NXE, NYSE MKT: NXE) is pleased to announce that the largest drill program in the Company’s history focused on optimizing mine development has begun at our 100% owned, Rook I property, in the Athabasca Basin, Saskatchewan. The drill program results will be incorporated into a NI43-101 Bankable Feasibility Study (“FS” or the “Study”), building on the successful outcomes highlighted in the Company’s Pre-Feasibility Study (“PFS”) (see News Release dated November 5, 2018) which demonstrated the Arrow Project to be an exceptional development opportunity for NexGen, Saskatchewan and Canada. read more