Tocvan Drills 15.3 meters of 1.1 g/t Au in New 4-Trench Extension Defines new mineralized trend over a 500 meter strike at Pilar
Tocvan Ventures Corp. (CSE:TOC) (CNSX:TOC.CN) (“Tocvan” or the “Corporation”) is pleased to announce results for the next four drill holes from its Phase II drill program (the “Program”) at the Pilar Gold-Silver Project in Sonora, Mexico. A Phase II drill program was completed in June with over 3,500 meters of reverse circulation (RC) drilling in twenty (20) drill holes. Results for four drill holes from the 4-Trench target area are included in this release, highlighted by drill hole JES-21-53 which returned 15.3 meters at 1.1 g/t Au. The results from 4-Trench have defined a new mineralized trend 500 meters long adjacent to the established Main Zone (Figure 1). Three (3) drill holes from new target areas are pending results.