NexGen Announces Appointment of Brad Wall, the Former Premier of Saskatchewan, to its Board of Directors

T.NXE, NexGen, uranium

NexGen Energy Ltd. (“NexGen” or the “Company”) (TSX:NXE, NYSE MKT:NXE) is pleased to announce the appointment of former Saskatchewan Premier Mr. Brad Wall to the Company’s Board of Directors. This appointment coincides with the retirement from the NexGen Board of Craig Parry, Chief Executive Officer of IsoEnergy and founding member of the Board of Directors at NexGen, who is moving onto the Technical Advisory Committee. read more

Skyharbour Partner Company Azincourt Energy Mobilizes Crew for Drill Program and Completes VTEM Survey at East Preston, Saskatchewan

V.SYH, Skyharbour, Uranium,

Skyharbour Resources Ltd. SYH)”>(TSX-V:SYH) (OTCQB:SYHBF) (Frankfurt:SC1P) (the “Company”) is pleased to announce that its partner company Azincourt Energy Corp. (“Azincourt”) has received all relevant permits for its proposed uranium drill program at the East Preston Project. Crews have now been mobilized in support of the program with drilling expected to commence before mid-March. read more

NexGen Releases Results from Shaft Pilot Hole Report and Assays from the Development Drilling Summer 2018 Program

T.NXE, NexGen, uranium
Figure 1: Arrow Deposit Drilling Locations (CNW Group/NexGen Energy Ltd.)

NexGen Energy Ltd. (“NexGen” or the “Company”) (TSX:NXE, NYSE MKT:NXE) is pleased to report geotechnical results for the initial shaft pilot holes and assays for all twenty-nine holes comprising 20,482.31 m, drilled during the summer development program on the Company’s 100% owned Rook I property, in the Athabasca Basin, Saskatchewan. read more

Skyharbour Option Partner Orano Canada Commences Winter Diamond Drill Program at Preston Uranium Project

V.SYH, Skyharbour, Uranium,

Skyharbour Resources Ltd. SYH)”>(TSX-V:SYH) (OTCQB:SYHBF) (Frankfurt:SC1P) (the “Company”) is pleased to announce that the Company’s option partner Orano Canada Inc. (“Orano Canada”) has commenced a planned 3,600 metre winter diamond drill program at the Preston Uranium Project. The project is located in the western Athabasca Basin near NexGen Energy Ltd.’s high-grade Arrow deposit hosted on its Rook-1 property and Fission Uranium Corp.’s Triple R deposit located within their PLS Project area. read more

NexGen Commences 125,000 m Feasibility Stage Drilling Program and Technical Studies at the Arrow Deposit

T.NXE, NexGen, uranium
Figure 1: Focus of Objective 1 and 2 Drilling (CNW Group/NexGen Energy Ltd.)

NexGen Energy Ltd. (“NexGen” or the “Company”) (TSX: NXE, NYSE MKT: NXE) is pleased to announce that the largest drill program in the Company’s history focused on optimizing mine development has begun at our 100% owned, Rook I property, in the Athabasca Basin, Saskatchewan. The drill program results will be incorporated into a NI43-101 Bankable Feasibility Study (“FS” or the “Study”), building on the successful outcomes highlighted in the Company’s Pre-Feasibility Study (“PFS”) (see News Release dated November 5, 2018) which demonstrated the Arrow Project to be an exceptional development opportunity for NexGen, Saskatchewan and Canada. read more

NexGen Honoured to Receive the PDAC’s 2019 Environmental and Social Responsibility Award

T.NXE, NexGen, uranium
Cision

NexGen Energy Ltd. (“NexGen” or the “Company”) (TSX: NXE, NYSE MKT: NXE) is pleased to announce it is the recipient of the 2019 Environmental & Social Responsibility Award given by the Prospectors & Developers Association of Canada (“PDAC”), the leading voice of the mineral exploration and development community. read more

NexGen Announces 64% Increase in Average Annual After-tax Cash Flow in Pre-Feasibility Study, After Tax NPV of $3.7BN, 43% Increase in Indicated Resources, and Initiates the Largest Drill Campaign in Company’s History to Expedite Arrow to Feasibility

T.NXE, NexGen, uranium
Cision

 NexGen Energy Ltd. (“NexGen” or the “Company”) (TSX:NXE, NYSE: NXE) is pleased to announce the results of an independent Pre-Feasibility Study (“PFS” or the “Study”) and Mineral Resource update of the basement-hosted Arrow Deposit, located on the Company’s 100% owned Rook I project (“Arrow” or the “Project”) in the Athabasca Basin in Saskatchewan, Canada.  The PFS was completed jointly by Wood Group, and Roscoe Postle Associates Inc. (“RPA”), with other technical inputs completed by sub-consultants. read more

NEXGEN ANNOUNCES POSITIVE RESULTS FROM ARROW PROJECT STUDIES

T.NXE, NexGen, uranium
Cision

VANCOUVERJune 13, 2018 /CNW/ – NexGen Energy Ltd. (“NexGen” or the “Company”) (TSX: NXE) (NYSE MKT: NXE) is pleased to report the positive results from Pre-Feasibility-stage technical studies including metallurgical, geotechnical, and hydrogeological assessments. These studies were conducted on the basement-hosted Arrow Deposit, located on the Company’s 100% owned Rook I project in Saskatchewan’s Athabasca Basin. read more