Millennial Reports Positive Pumping Test Results from Second Pumping Well at Pastos Grandes Project, Argentina
Millennial Lithium Corp. (TSXV: ML) (“Millennial” or the “Company”) is pleased to report encouraging results from an extended pumping test of a second production-scale well at its Pastos Grandes Project in Salta, Argentina. Pumping well PGPW17-04 was installed to complete extended pumping of lithium brine to determine the robustness and chemical variation of the aquifer over 23 days in September, 2018. At a pumping rate of 15 litres/second (L/s), the lithium content remained consistent over the trial period and the drawdown was approximately 57 metres (m), with rapid recovery. Estimated transmissivity was calculated from the drawdown data at 40m2/day. The pumping test was completed under the direction and supervision of Montgomery and Associates.