Stratabound Reports Latest Drill Results on Golden Culvert, Yukon Territory

Cannot view this image? Visit: https://i2.wp.com/orders.newsfilecorp.com/files/4064/73392_da80a64dd4336b01_002.jpg?w=570&ssl=1
  • Drilling extended 200 meters beyond the 430 meters of strike drilled previously
  • Four parallel gold-mineralized zones intercepted in the northern portion of a +30-ppb gold-in-soil anomaly featuring:
    • High grade mineralized quartz vein and breccia core structures yielding up to 4.83 g/t gold across 1.5m down the hole,
    • Broad zones of lower-grade mineralized wall-rock yielding up to 0.30 g/t gold over 24.5m flanking and inclusive of the higher-grade core structures.

    Stratabound Minerals Corp. (TSXV: SB) (OTC Pink: SBMIF) (“Stratabound” or the “Company”) reports it has received complete assay results for the first six of seventeen drill holes completed on the Phase 2 diamond drilling program concluded late last fall at its flagship Golden Culvert Project in the southeastern Yukon Territory. read more