Cartier Silver Announces $3 Million Financing; Staking of Additional Claims in Potosi Department, Bolivia

Cartier Silver Corporation (CSE:CFE) (“Cartier Silver” or the “Company”) is pleased to announce that it is proceeding with a non-brokered private placement (the “Private Placement”) for proceeds of up to $3 million. The Company also announces the staking of additional claims in the Potosi Department, Bolivia, immediately south and west of the recently optioned Felicidad and Gonalbert properties (see Cartier Silver’s October 26, 2022 press release), respectively. read more

Cartier Iron to Acquire a Silver Project in the Potosi Department, Bolivia; To Proceed With Share Consolidation and Name Change to Cartier Silver Corporation

Cartier Iron Corporation (CSE:CFE) (“Cartier Iron” or the “Company”) is pleased to announce it signed a letter of intent agreement on October 25, 2022 (the “Agreement”) to acquire a 100% interest in the Chorrillos Project, comprising two separate properties known as the Gonalbert Mining area and the Felicidad Mining area, located in southern Bolivia approximately 15 to 20km southeast of Eloro Resources Ltd.’s Iska Iska silver-tin polymetallic project. read more

Cartier Iron Provides Update on Exploration for Low Sulphidation Gold-Silver Epithermal Mineralization at Big Easy, Newfoundland

Cartier Iron Corporation (CSE:CFE) (“Cartier Iron” or the “Company”) carried out a 17-hole diamond drill program totaling 9,470.6m in winter 2022 to test significant resistivity anomalies along a major north-northeast trending structural break outlined by the Controlled Source Audio Magneto-Telluric (“CSAMT”) survey in the Central Anomaly – Big Easy Showing Area (see Cartier Iron’s May 10, 2022 press release). Although assay results returned only geochemically anomalous values of silver, all the drill holes intersected wide sections of interbedded rhyolite and siltstone up to 150m thick in the lower part of the Musgravetown Group. Hydrothermal alteration is very extensive consisting primarily of silicification and phengite micas. read more

Cartier Iron Reports on Diamond Drill Program on the Low Sulphidation Gold-Silver Epithermal System at Big Easy, Newfoundland

Cartier Iron Corporation (CSE:CFE) (“Cartier Iron” or the “Company”) provides an update on its diamond drilling program at its wholly-owned Big Easy property, located near Clarenville, in eastern Newfoundland. The Company carried out a 17-hole diamond drill program totaling 9,470.6m in winter 2022 to test significant resistivity anomalies along a major north-northeast trending structural break outlined by the Controlled Source Audio Magneto-Telluric (“CSAMT”) survey in the Central Anomaly – Big Easy Showing Area. Ten (10) of the drill holes tested the Central Anomaly area, three (3), the Central North Anomaly and four (4), the Big Easy South Anomaly (see Table 3 below). Collectively these reconnaissance drill holes tested CSAMT resistivity anomalies over a strike length of 2.4km as shown in Figure 1. read more

Cartier Iron Recommences Drilling and Provides Update on Exploration Program on the Low Sulphidation Gold-Silver Epithermal System at Big Easy, Newfoundland

CFE.CNX, Cartier Iron, gold, Newfoundland

Cartier Iron Corporation (CSE:CFE) (“Cartier Iron” or the “Company”) is pleased to provide an update on its diamond drilling program at its wholly-owned Big Easy property, located near Clarenville, in eastern Newfoundland. As previously announced (see press releases September 21, 2021 and November 15, 2021) the 10,000m diamond drill program will test significant resistivity anomalies along a major north-northeast trending structural break outlined by the Controlled Source Audio Magneto-Telluric (“CSAMT”) survey in the Central Anomaly – Big Easy Showing Area. Drilling is being done by the Logan Drilling Group. read more

Cartier Iron Provides Update on Diamond Drilling Program on the Low Sulphidation Gold-Silver Epithermal System at Big Easy, Newfoundland

Cartier Iron Corporation (CSE:CFE) (“Cartier Iron” or the “Company”) is pleased to provide an update on its diamond drilling program at its wholly owned Big Easy property located near Clarenville in eastern Newfoundland. As previously announced (see press release September 21, 2021) the 10,000m drill program will test significant resistivity anomalies along a major north-northeast trending structural break outlined by the Controlled Source Audio Magneto-Telluric (“CSAMT”) survey in the Central Anomaly – Big Easy Showing Area. read more

CSAMT Survey Confirms Low Sulphidation Gold-Silver Mineralizing System at Big Easy, Newfoundland Occurs on a Major Structure That Extends to a Depth of at Least 1 Kilometre

Cartier Iron Corporation (CSE:CFE) (“Cartier Iron” or the “Company”) is pleased to announce the results of its Controlled Source Audio Magneto-Telluric (“CSAMT”) in the Central Anomaly – Big Easy Showing Area on its 100% owned Big Easy Gold-Silver Project near Clarenville in eastern Newfoundland. read more

Cartier Iron to Commence Diamond Drilling to Test Geophysical Targets for Low Sulphidation Epithermal Gold-Silver Mineralization Along Major Structures at the Big Easy Gold Project, Newfoundland

  • 2,000m diamond drilling program to commence by the end of January to test new IP targets and Central Anomaly on major magnetic trends
  • 54.5 line-kilometres of additional IP surveys to be completed on major target area in southern part of claims

TORONTO, Jan. 25, 2021 (GLOBE NEWSWIRE) — Cartier Iron Corporation (CSE: CFE(“Cartier Iron”), is pleased to announce the start of a 2,000m, 7-hole diamond drill program at the Big Easy Gold Project in Newfoundland to test new Induced Polarization (IP) targets (see press release December 2, 2020) and follow-up drilling on the Central Anomaly where drilling in 2018 intersected a wide alteration zone which returned 0.11gAu/t and 2.65gAg/t over 180.4m (see press release December 18, 2018). Table 1 gives a list of proposed hole locations. An additional 54.5 line-kilometres of IP surveys will also be carried out to follow-up a major new target area outlined in the southern part of the property. read more

Cartier Iron Extends Major Epithermal Gold-Silver Target Zone to 20Km+ Strike Length at Big Easy Gold Project, Newfoundland

Figure 1

Cartier Iron Corporation (CSE: CFE) (“Cartier Iron”), is pleased to report on results of a geological mapping, soil sampling and prospecting program completed during July, 2020, at its Big Easy Gold project (see press release July 8, 2020), located on the Burin Peninsula in eastern Newfoundland. The program focused on follow-up of major target areas outlined by magnetic and induced polarization/resistivity (IP/Res) surveys as well as exploration of the potential southern extension of these chargeability zones which have had only limited previous work. read more

Cartier Iron Completes Financing; Big Easy Property Drilling to Commence Next Week

Cartier Iron Corporation (CSE: CFE) (“Cartier Iron”) is pleased to announce that it has completed a previously announced non-brokered private placement (the “Private Placement”) of 2,000,000 flow-through units of Cartier Iron at a price of $0.10 per unit (“F-T Units”) for proceeds of $200,000 and 5,000,000 non-flow-through units of Cartier Iron at a price of $0.08 per unit (“Units”) for additional proceeds of $400,000. read more