Cartier Files on SEDAR the NI 43-101 Technical Report of the Preliminary Economic Assessment for Chimo Mine Project Post-Tax NPV5% of CAD$388M and 20.8% IRR

Long term gold price of US$1,750/oz, Exchange rate of CAD $1.00 = US$0.77 Post-tax NPV5% of CAD$388M and IRR of 20.8% Post-tax payback period of 2.9 years and mine life of 9.7 years Capex of CAD$341M Average all-in sustaining cost of US$755/oz Average annual production of 116,900 oz 4,500 tpd underground operation Average sorted grade of 4.55 g/t Au for mill feed Processing plant with capacity of 3,000 tpd and rate of recovery of 93.1% Sorting of mineralization increases the grade of material prior to milling operations and recovery rate and also reduces costs of mill construction, material handling, milling and restoration leading to a reduced environmental footprint of mine tailings and thus increasing the social acceptability of the project
Cartier Resources

Cartier Resources Inc. (TSX-V: ECR) (“Cartier”) announces that it has filed on SEDAR the NI 43-101 technical report of the Preliminary Economic Assessment (“PEA”) titled “NI 43-101 Technical Report and Preliminary Economic Assessment for the Chimo Mine and West Nordeau Gold Deposits, Chimo Mine and East Cadillac Properties, Quebec, Canada”, prepared in accordance with National Instrument 43-101 – Standard of Disclosure for Mineral Projects (“NI 43-101”). read more

Denarius Metals Announces Final Drill Results from Completed Phase 2 In-Fill Drilling at Its Polymetallic Lomero Project in Spain, Including 10.25 Meters Grading 0.27% Copper, 4.79% Lead, 9.82% Zinc, 161 g/t Ag and 6.82 g/t Au

Denarius Silver, DSLV.V, silver, Spain
Cannot view this image? Visit: https://i1.wp.com/images.newsfilecorp.com/files/9396/167847_ee516ed5e4f18b10_001.jpg?w=570&ssl=1

Denarius Metals Corp. (TSXV: DSLV) (OTCQX: DNRSF) (“Denarius Metals” or “the Company”) announced today that it has received the final assays for 42 drill holes, mainly in-fill holes, totaling approximately 13,225 meters, from the Phase 2 surface validation and in-fill drilling program on its polymetallic Lomero Project in southern Spain. To date, Denarius Metals has completed approximately 41,850 meters of drilling in 128 drill holes, including twinning of historical drill holes. The in-fill phase, totaling 23,920 meters and representing 57% of the total drilling program, is now complete. A final 4,000 meters validation drilling campaign, designed to finish verifying the high-grade underground drill holes drilled in the 1980s by Indumetal/Billiton, is in progress. The full drilling results will be incorporated into the geological model and will be integrated in the Mineral Resource Estimate (“MRE”) update to be completed in conjunction with a preliminary economic assessment (“PEA”) in the second half of 2023. read more