Grid Metals Donner Lake Lithium Property Drill Results and Project Development Update

PEA Underway at Makwa Mayville Ni-Cu-PGM-Co Property
Grid Metals, GRDM.V
Grid Metals Corp., Thursday, July 28, 2022, Press release picture

Grid Metals Corp. (the “Company“) (TSXV:GRDM)(OTCQB:MSMGF) is pleased to report the results from the final three holes completed in the Phase 1 drill program at its Donner Lake lithium property (the “Property“) in southeastern Manitoba. In addition, the Company has initiated certain project development activities including baseline environmental work and metallurgical testwork on both the Northwest and Main dykes. The property is located in the Winnipeg River pegmatite field, which hosts the world-class Tanco pegmatite and the associated Tanco lithium-cesium-tantalum mine and concentrator. The property is a 75%/25% joint venture between Grid Metals Corp and Lithium Royalty Corp., a leading player in global lithium finance. read more

NexGen 2021 Drilling Assay Results Confirm Uranium Mineralization Below Arrow At Depth and Commencement of 2022 Regional Exploration Program

T.NXE, NexGen, uranium
Figure 1: 2022 Exploration Target Areas (CNW Group/NexGen Energy Ltd.)

NexGen Energy Ltd. (“NexGen” or the “Company”) (TSX: NXE) (NYSE: NXE) (ASX: NXG) is pleased to announce drill assays from 2021 confirm discovery of a uranium mineralized zone below the known Arrow Deposit and at Camp East: read more