Clean Air Metals Announces a PEA of the Current and Escape PGE-Cu-Ni Deposits of the Thunder Bay North Project, with post-tax NPV5 of C$378m, IRR 29.8%
Clean Air Metals Inc. (“Clean Air Metals” or the “Company“) (TSXV: AIR) (FRA: CKU) (OTCQB: CLRMF) is pleased to announce results from an independent Preliminary Economic Assessment (PEA) that was completed for its Thunder Bay North Platinum Group Element (PGE) – Copper (Cu) – Nickel (Ni) Project (“Thunder Bay North” or the “Project”) near Thunder Bay, Ontario, Canada. The PEA was prepared by Nordmin Engineering Ltd. (“Nordmin”) of Thunder Bay, Ontario, and includes a new stand-alone milling complex and waste storage facility (WSF) with mill feed from both the Current deposit and the Escape deposit, part of the Thunder Bay North Project Mineral Resource Estimate as amended, that was completed by Nordmin (see press release dated January 20, 2021). All amounts are in CAD dollars, unless otherwise stated. Summary results of the PEA are shown below in Table 1.